Tagging a Network Scheduling Right

Slides:



Advertisements
Similar presentations
E-Tag 1.8 An industry tutorial.
Advertisements

Training Guide. `
MISO Southern Region Integration – ARR/FTR Timeline FTR WG February 6,
Bookseller Guide How to do a BALANCE ENQUIRY on a National Book Token Electronic Gift Card using the Web Recommended solution for booksellers with broadband.
Oasis Overview. 2 OASIS Overview What is OASIS? S –Open Access Same Time Information System –Electronic site for transmitting utility information to customers.
Bookseller Guide How to REDEEM a National Book Token Electronic Gift Card using the Web Recommended solution for booksellers with broadband computer access.
OASIS Subcommittee Status EC Meeting 2/18/14. Preemption and Competition Annual Plan Items Affected 2013 AP Item 2(a) Develop version 2 business practice.
EC Meeting 2/24/ AP Item 7(b) Modify NAESB standards WEQ , WEQ , and related standards to be consistent with the Commission’s policy.
How to create a parent account This document is intended for school staff to help facilitate the parent account activation process.
Pseudo-Tie Reservations
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Thursday, September 15, :00 to 3:00 p.m. EDT 3 rd Quarter
CONCRETE SOFTWARE SOLUTIONS PVT. LTD. A leading Digital Marketing Firm In India.
Public Access Phase III - Overview WiFi Alliance Public Access III Overview doc.: IEEE /687r1 Slide 1Submission WiFi Alliance Public Access III.
RNJ 10/02/091 3 Computing System Fundamentals 3.6 Errors Prevention and Detection.
RightNow Tag Gallery URL: Staff profile must have WebDav option enabled.
11 Why BPA Transmission Customers Aggregate Reservations Feb. 20, 2013.
NPR DS Marketing Forms powered by Springboard: Customizing Forms April, 2015.
Proprietary and confidential. Do not copy or distribute without permission from OATI - © Open Access Technology International, Inc. Slide 1 ISO New England.
242/102/49 0/51/59 181/172/166 Primary colors 248/152/29 PMS 172 PMS 137 PMS 546 PMS /206/ /227/ /129/123 Secondary colors 114/181/204.
NITS Concepts  Contract Data Model: NITS Agreement represented as a Contract Contract has one or more Facilities Facility may be one or more Resources.
To return to the Main Menu.
1 October 2003 Electricity Markets Regional Evolution Randy Berry
 Contract between the NYCDOE and the Vendor  Approved ‘E-catalog’  Ability to send data via FTP or sFTP.
Duke Energy Carolinas Quarterly Stakeholder Meeting Independent Entity Services Wednesday, January 28, :00 to 3:00 p.m. ET.
HIDDEN DESCRIPTION SLIDE — NOT TO BE SHOWN TO THE PUBLIC Closing Info Catalogue code: C03 Full presentation or module? module Slide numbers: C03-1 to C03-2.
Transmission Customer Meeting March  Sponsor Supervisors o John Walker o Amy Light  Team o Matt Richard o Johnny Useldinger o Jonnette Hemry.
After-the-Fact Workgroup Update Sheryl Welch ISAS Meeting January 12-13, 2016 Phoenex, AZ.
NITS Implementation Clover Bubble. NITS Implementation FERC Order 676-H Phase I – Non-NITS portion was completed on May 13, 2015 – Scheduling Across Multiple.
NITS on webSmart OASIS. NITS on webSmart OASIS Agenda  Company and User Permissions  Electronic Industry Registry requirement  WebSmart OASIS NITS.
Annual ARR Registration Workshop January 7, 2015.
BUSS2 Marketing: using the marketing mix - product.
Best Life Coach Training -
NERC vs. RTOs July 16, 2001.
TuNGSTEN E-INVOICE SUBMISSION GUIDE.
Data Interface Tutorial
Clarification of the Resident Load Definition
HOW TO CREATE YOUR LISTING
Best Content Writing Services
Duke Energy Carolinas Quarterly Stakeholder Meeting

OATI Tagging Cara Semperger 1/9/2000.
Sample Presentation. Slide 1 Info Slide 2 Info.
NITS Application Detail
NFX Q-Port on-boarding guide
Pseudo-tie business procedure
Introducing Digital Marketing Agency in Mumbai. We help you to boost up your business with our innovative ideas.
Frontier Airlines Customer Service offer the better Services
EPAR Training Module Transfer 11/9/2018 ePAR - Transfer.
Instruction Manual for using DynamicsCRM Mobile App
NITS Review Scoping Document.
Add/Terminate NITS DNR
مدیریت استراتژيک منابع انسانی
NITS Application NITS Training Guide 2017.
NITS Load Designation NITS Training Guide 2017.
Wednesday , October 19, :00 to 3:00 p.m. EST
4th Quarter 2015 Thursday, October 15, :00 to 3:30 p.m. EST
DNR List NITS Application Detail
After-the-Fact Workgroup Update Sheryl Welch
WiFi Alliance Public Access III Overview
Digital Marketing training in bangalore.
NITS on OASIS Transmission Customer Perspective
Ռազմավարական կառավարում
NITS on OASIS Implementation.
Oracle EBS Training Customer WebADI Oracle EBS
Assigned to the WEQ OASIS and WEQ OASIS/BPS Subcommittees
You should currently have records under this category if you have been teaching in Spring 2012 and/or Fall 2012 (note.
NITS on webSmart OASIS.
INTRODUCTION TO OU CAMPUS
Pseudo-tie business procedure
The Market Place and E-Invoicing
Presentation transcript:

Tagging a Network Scheduling Right NITS Training Guide 2017

Tag Submission There are a few areas on a tag submission that are unique for a Network Scheduling Right. The Product, OASIS, and NITS Resource Fields require specific attributes that are shown on the next slide. On Slide #4 the Asset Owner needs to be added to a specific “Misc Info” field in the Physical Path. These changes do not affect how GFAs or SPOT IN are currently tagged; these changes are for Firm Network tagging only.

Sample Tag 7-FN 1201 E-tag Transmission Allocation Product = 7-FN AMIL.GBCCTG1 E-tag Transmission Allocation Product = 7-FN E-tag Transmission Allocation OASIS = Application Ref from OASIS (4-digit number) field, E.g. 1201 E-tag Transmission Allocation NITS Resource = The Resource Name used in OASIS must match exactly to the NITS Resource on the tag. E.G AMIL.GBCCTG1 E-tag Physical Path Sink = Sink from OASIS must match tag

Asset Owner Token = ASSETOWNER (must be exact all caps, one word) E-tag Physical Path MISO TP line Misc Info: Token = ASSETOWNER (must be exact all caps, one word) Value = Customer Code to be used with Market Settlements

Questions? Please contact Interchange and Transmission Services at TariffAdministration@misoenergy.org