Center for Children and Families Cal State San Marcos

Slides:



Advertisements
Similar presentations
June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
Advertisements

Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
Center Grove High School Addition & Remodeling Schematic Design Phase Faculty Presentation August 27, 2008.
INSTRUCTIONS The Southeast Region Architectural Exhibit submittal package will be placed on this template. All projects must have been completed and occupied.
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE November 12, 2008.
2012 ToolBox Grant Cycle. What is capacity building? “Capacity building is about strengthening management systems and governance in organizations.” Making.
CSULB Innovation Challenge How to Write a Business Plan November 1, 2013 and November 5, 2013.
The Early Reading First Program CFDA # A and B Center for Faith-Based and Community Initiatives
Building Work Committee Renovation & Expansion Project Presentation March 7, 2009 Mason School District.
Capital Development Process Office of the Architect August 10, 2009 Project Manager / Construction Administration Manager Training.
2014 AIA San Diego Design Awards Submission Instructions Slide PowerPoint Template for the Foundation Categories Each project entry must submit a separate.
Facilities Modernization Program Funded by Measure B Project Report April 19, 2010.
Bond Construction Update Citizens Oversight Committee Long Beach Community College District October 24, 2011 EDUCATE  ENGAGE  EMPOWER 1.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
RESIDENTIAL: ________________________________________________________________________________ Category: Please select the category that best describes.
Project Name: XX Category: XX Location: City, State Date of Completion: Month, YEAR Size: XXXX sf Budget: $ Project Cost Note: Replace all items in TAN.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
Session 1: Identifying Construction Drawings and Drawing Components.
Purpose The purpose of Module 1 is to orient new staff to child outcomes measurement and the Child Outcomes Summary Form (COSF).
White Pigeon Community Schools
The art and science of designing and construction of buildings.
CDECA™ 2017 Decorating and Design Competition
San Mateo – Foster City School District
BLAKELY  Welcome.
Design process.
Pacific Northwest Region 2017 Pinnacle Award
Cambrian School District March 19, 2015
Coffee Chat: LA COSTA MEADOWS Elementary school Construction update
INDUSTRY ALIGNMENT FUND – PRE-POSITIONING PROGRAMME LETTER OF INTENT
Construction Schedule Management
D I S C O V E R Y Challenge.
Oakland Elementary Title 1 Parent Meeting
CSM Buildings Modernization DESIGN-BUILD QUALIFICATION CONFERENCE
Student Activities CRC Workshop
Student Activities Centralized Training
Publishing & Presenting Your Plan
Construction Documents
INSTRUCTIONS Welcome and thank you for applying to the 2015 Nestle Brand Building Awards! Deadline for submissions is 12:00 PM Pacific, Monday, October.
Getting Down to Business
Project: Facility Name Location: City, State Entry #: Enter Here
Silver Lake Regional High School
Applications of Technology
Student Activities CRC Workshop
21st Century School Buildings Plan
Student Activities Centralized Training
Commercial Building Project Portfolio
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Child Outcomes Summary (COS) Process Module
Annual Meeting September 14, 2018
UPSIDE DOWN UP4 INGLE FARM CHILDREN’S CENTRE Completed 2013
Linking Standards, IFSPs and Service Delivery
Writing an Encyclopedia Entry Part Two
Chapter 3 Resolution and Design.
Project: Facility Name Location: City, State Entry #: Enter Here
Child Outcomes Summary (COS) Process Module
Student Activities Centralized Training
Child Outcomes Summary (COS) Process Module
Design process.
Lockeford Elementary School Kindergarten Construction
MEASURE r Bond Project timeline
Publishing & Presenting Your Plan
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
Child Outcomes Summary (COS) Process Module
FIVE PROJECT PHASES.
Introduction to the Child Outcomes Summary Form (COSF)
Student Activities CRC Workshop
Ward Park Restroom Timeline
EAST PENNSBORO AREA SCHOOL DISTRICT
Honoraria for Design Build Projects Methodology Assessment Matrix
Architecture & Interiors Design Process
Presentation transcript:

Center for Children and Families Cal State San Marcos From Concept to Concrete Terry introduces – .5 minute total, 1 slide. Notes that presentation will be by the CCFPT and introduces members. (Mary Elizabeth is not here.)

The Grant Peggy talks about First 5 Grant 1 minute – 1 slide.

The Location Russ – 1 minute total for 3 slides - shows project location.

The Location Russ shows site photo - tells about VPAA trailers removed for EOC

The Funding Russ talks about architectural concept plans to develop cost estimate for funding in early 2004.

Grant Management/Operations Marti – 1 minute - talks about Foundation managing the grant monies and operations. Talks about time elapsed (6 months??) between schematic cost estimates and award of grant money, due to legal challenge to First 5’s award to CSUSM.

Construction Industry Crisis Construction Costs Increased 40% January 2004 – April 2005 Fixed Fund Source from First Five Design-Build Process – Architect and Contractor Teams Work within fixed budget Design and Value Competition Diane – 2 minutes total 6 slides – Notes significance of funding delay on construction costs. Talks about rationale for Design-Build Process.

Design Criteria Diane mentions 27 page Design Intent Narrative.

Design Criteria– Space Program Diane mentions Architectural Space Program.

Design Criteria–Space Description Diane mentions Room Data Sheets.

Design Criteria – Adjacencies Diane mentions Adjacency Matrix.

Bid Process Diane mentions Bid Process with pre-qualification of teams, resulting in 3 proposals.

Winning Proposal Terry – 2 minutes total for 3 slides - shows winning proposal by NTDStichler Architects and Edge Development. Mentions residential scale, fit with campus, tasteful architecture, appeal to children and families.

Winning Proposal Terry talks about well-designed play yards, with nice landscaping, trellis-shaded areas, trike paths, play structures, water play areas, art center, and garden. Notes need to revise traffic exit onto LaMoree.

Modification Process Terry describes modification process to adjust driveway and to revise floor plan details.

Floor Plan Maureen – 2 minutes total - describes floor plan layout with large entry lobby, administration area and health center. Notes classrooms grouped around appropriate age play yards. Mentions University classroom, Parent Resource room and commercial kitchen, which needs additional funding for equipment. Talks about interface with academic programs.

Center for Children and Families Cal State San Marcos Rough Grading Starts on January 23rd, 2006 Scheduled to complete construction May 2007 Center Opens August 2007 Peggy - .5 minute - wraps it up, noting key dates.