FAIR magnets fiducialisation WP 7.5

Slides:



Advertisements
Similar presentations
SPL Integration Layout Impact on cryo and vacuum sectorisation ◊ Underground obstacles, constraints on slope and length of the SPL ◊ Continuous cryostat.
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
THE ALIGNMENT OF THE LHC DURING THE SHUT-DOWN D. Missiaen.
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
Yurii Levashov LCLS Undulator Fiducialization October 20, 2005 *Work supported in part by DOE Contract DE-AC02-76SF LCLS.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
02/06/20141 WHAT ITEM IS COMPOSED OF ? INTEGRATION MODEL DETAIL MODEL SKELETON 3D ENVELOP PART 1 PART 2 PART XXX… EQUIPMENT ITEM INTEGRATION OFFICE RESPONSIBILITY.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
1 / 19 M. Gateau CERN – Geneva – CH 14th International Magnetic Measurement Workshop September 2005, Geneva, Switzerland.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
1 LHC IR Quadrupole Alignment Experience at Fermilab T. Beale, J. DiMarco, J. Nogiec, P. Schlabach, C. Sylvester, J. Tompkins, G. Velev 28 September 2005.
Measurements and DB meeting 1 December, 2005, Elena Wildner AT/MAS 1 AC/GEO mole measurements Based on outcome from meeting 24/ and Installation.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
Some Thoughts on Magnetic Measurements for MICE Michael A. Green Lawrence Berkeley Laboratory Berkeley CA 94720, USA.
MM planning for HiLumi-LHC L. Fiscarelli M. Buzio, O. Dunkel, T. Zickler 4 March 2015.
1 Magnetic measurements proposal of the FAIR magnets Magnetic Measurements of Super-FRS dipoles: budgets 1 Budget for dipoles ( ) document FAIR-SFRS-magnetic_measurement_EVM.xls.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Preliminary Design of Electron Beam line F. Velotti, C. Bracco, B. Goddard and M. Meddahi.
STC "VOSKHOD", PROJECT "SPECTR-UV", JUNE 2006 Next slide Next slide Previous slide Possible layouts of Field Cameras.
H. MAINAUD DURAND CFS TDR design status Survey & alignment MDI meeting, 16/03/2012.
VELO Integr - Jan06Jean-Christophe GAYDE TS/SU EDMS n° SURVEY FOR VELO INSTALLATION 1.SURVEY AT GROUND FLOOR - FIDUCIALISATION 2.SURVEY FOR INSTALLATION.
CERN – GSI plenary coordination meeting, Magnetic Measurements WP.
Managing the survey activities during the Long Shut-down 1 Dominique Missiaen D. Missiaen, Iwaa14, October 2014, IHEP, Beijing, China1.
1 Magnetic measurements of the Super-FRS magnets 1 Overview: - Measurement systems for dipoles - requirements - Measurement systems review - Open points.
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
D. Missiaen – 13/06/2014. D. Missiaen 13/06/ Agenda Introduction to alignment techniques Reserved space for Survey The CERN Co-ordinates System.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
TEST FACILITY STATUS FOR TESTING CERN Marta Bajko WP10. EUCARD 2 Task 4 - HTS Magnet Tests, June 2015.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS multiplet field.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Super-FRS magnet configurations.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
Polar Co-ordinates. A polar coordinate system, gives the co-ordinates of a point with reference to a point O and a half line or ray starting at the point.
The Super-FRS Multiplet, Magnetic and Cryogenic requirements
ALIGNMENT OF THE NEW TRIPLETS
on behalf of the CLIC active pre-alignment team
Alignment of VSC components along LSS 1&5
Integration of Mathematica in the Large Hadron Collider geometry database Jerome Beauquis Elena Wildner IMS06, 20 June, 2006, Elena Wildner.
Testing of SC Magnets Status - November 2010
Geometric and Magnetic Measurements
Workshop on Tau-Charm at High Luminosity
A. Vande Craen, C. Eymin, M. Moretti, D. Ramos CERN
Integration and alignment of ATLAS SCT
Need for Alignment Position of off-momentum proton w.r.t. beam
LCLS Undulator Fiducialization
EN-ICE Technical Committee SM18 activities & projects
The 11T cryo-assembly: summary of design and integration aspects
Alignment challenges for a future linear collider
CNGS Proton Beam: Introduction
The Storage Ring Control Network of NSLS-II
Status of the PANDA Solenoid Magnet Production in BINP
Triplet corrector layout and strength specifications
The high precision photogrammetry application R&D in CEPC
Adjustment of the 3 reference tables at building 180 AT960 measurement
Status of QQXF cryostat
Magnetic measurements at ambient temperature on the MQXFBP1
Simplified Procedure Draft
Presentation transcript:

FAIR magnets fiducialisation WP 7.5 Dominique Missiaen

CERN-GSI magnet measurements and fiducialisation meeting Agenda Introduction to Fiducialisation Status 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

CERN-GSI magnet measurements and fiducialisation meeting In order to align a magnet in a tunnel, some external references called «fiducials» Have to be measured w.r.t a reference axis Magnetic axis for the 33 cold multiplets Magnetic axis/yoke for the 24 warm dipoles The magnetic axis and roll angle is measured by the Magnet group and transfered on some «references» 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

Fiducialisation set up 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

Fiducialisation Layout Courtesy Antoine Kosmicki 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

CERN-GSI magnet measurements and fiducialisation meeting Courtesy Antoine Kosmicki 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

CERN-GSI magnet measurements and fiducialisation meeting Number offiducials Requested number (GSI) CERN Requested accuracy (mm at 1s) Accuracy (mm at 1 s) Roll angle (mrad) Long Multiplets 12 4 (not on the same side) As much as possible 0.2 0.08 Small multiplets 8 dipoles 0.5 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

CERN-GSI magnet measurements and fiducialisation meeting Requirements 4 positions per bench on a stable floor At least 6 network points per bench on a stable floor The supporting has to be realised exactly the same way for the fiducialisation as for the tunnel !! Supporting system is done by GSI ? 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

CERN-GSI magnet measurements and fiducialisation meeting Co-ordinates system Mean plane Beam trajectory Optics Entry point Optics Exit point Y X Z Fid1 (x1,y1,z1) Y axis is the magnetic axis XY plane given by the roll angle 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

CERN-GSI magnet measurements and fiducialisation meeting Questions Do you prefer the origin to be the magnetic center ? longitudinal reference is measured on the cryostat ? Y Z Optics Exit point Beam trajectory X Fid1 (x1,y1,z1) Optics Entry point Mean plane 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

CERN-GSI magnet measurements and fiducialisation meeting Status of the Wp Acquisition of an instrument AT402 Reception At CERN 2 days ago Together with a BProbe 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

CERN-GSI magnet measurements and fiducialisation meeting Fiducials CCR1.5 Diameter ? Offset ? Magnetic or not ? 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

CERN-GSI magnet measurements and fiducialisation meeting Status of the WP Infrastructure Most of Network points available from LHC cryo-magnets fiducialisation Software Automatisation of the measurement/data processing could be done using «Measurement Plan» from Spatial Analyzer 19/11/2015 CERN-GSI magnet measurements and fiducialisation meeting

Thank you for your attention Questions ?