Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.

Slides:



Advertisements
Similar presentations
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Advertisements

04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
:30 meetingEBH 1  No beam during the morning:  4:15 – 9: V distributor: Recovery after electrical interruption  access for TI services.
Tue 23/8 – Wed 24/8 09:00 Start 90 m optics run – Preparation and verification of the collimation functions – Re-generation of functions for Transverse.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday
MD Planning Fri – Sat (26. – 27.8.)
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Summary of week 40 Machine Coordinators: G. Arduini, M. Lamont
Machine Coordinators: G. Arduini, J. Wenninger
Friday 15th June 01:11 Injection.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
LHC progress Week 30 summary 30th July 2012
Thursday 09:30 VdM scan for CMS, standard ADT gain.
Summary week 23 Luminosity production
02/08/ :35: Lost access chain in point 2 (PX24 PAD)  Dump after ~14.5 hours ~100 nb-1.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Coordination: G. Arduini, E.B. Holzer
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
LHC Morning Meeting - G. Arduini
Main aims: LHCb polarity switch, Luminosity production
Summary of Week 11: 14 – 21 March
LHC Morning Meeting - G. Arduini
Tuesday 08:30 Fill 2700 dumped by QPS on RCBXH2.L1
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Summary of Week 16 G. Arduini, J. Wenninger
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Mon 22/8 – Tue 23/8 00:07 stable beams #2040. Initial luminosities: 2.1x1033 cm-2s-1 18:00 Programmed dump. End of physics #2040. ~83 pb-1 in ~18 hours.
Mike Lamont, Jorg Wenninger
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
MD#2 News & Plan Tue – Wed (19. – 20.6.)
Monday Morning – recovery from cryo.
Chromaticity can make a difference…
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Thu 15/9 – Fri 16/9 09:30 Controls network problem fixed The network problems have been fixed since 9:30am when the network switch for the Service IP57.
Wednesday 9:08 Fill 3214 dumped by OP after 5:26 hours in stable beams
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Summary week 18 Intensity ramp up & production
Tue/Wed 12/ :00 Probe beam back again
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Saturday :42 stable beams fill 3541
Polarity inversion 07:00 ALICE solenoid and dipole polarity switched to positive External Crossing angle polarity unchanged at injection/ramp & squeeze.
LHC Morning Meeting - G. Arduini
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Coordination: Eva Barbara Holzer, Mike Lamont
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Another Immortal Fill….
Wednesday 26 October 2011.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday
Wednesday :35 : Beam lost because of trip of RCBXH3.L1
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Summary of week 22 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production

Week 22 LHCb polarity change QPS, Vacuum PC, QPS, RF, OFSU

Week 22 Summary - G. Arduini Last 24 hours After a very good fill…the desert: 07:00-12:30: Access for QPS main circuits Sector 67 (WorldFIP repeater connector). In the shadow investigations on TCTH.4R5.B2 failing to move. 12:30-13:30 Pre-cycle 13:30-14:30 Problem with TCLIB.6R2.B1. LVDT disabled 14:30 Injecting 15:00-15:30 BLM power supply in TI2 interlocking extraction 15:30-17:48 Access for QPS problem (WorldFIP communication) on Q17.L5 18:07–21:45 Access for vacuum controls preventing to open to vacuum valves in point 5 20:46-23:00 Access for QPS problem (WorldFIP communication) on Q17.L5 AGAIN!! Card replacement did not solve the problem. OK after serveral resets of the old card…. 00:20 Finally injecting… 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Last 24 hours Large emittance on the 12 bunch train while injecting. Dump and refill 02:18 Problem with TCT collimators in point 2 armed but not executing the functions during the collision process 02:25 Beam dump due to loss of communication with BLM crate in point 3 (SW intlk) 05:27 Trip of sector 12. RQ6.R1 (QPS) while at pre-injection plateau Precycling During pre-cycle problem with LBDS.B2 (power supply). Access required 23 November 2018 Week 22 Summary - G. Arduini

Fills of the week from 28/5 – 08:00 Day Nb L (h) Int L (pb-1) Dump 2671 Mon 1380 4.8(7.3) 71.3(121.3) BPM LSS6 (SW Intlk.) 2673 2.8 53.2 Trip of RCBXV2.R1 (QPS) 2675 Tue 4.1 77.4 RQ7.R1 (QPS – SEU) 2683 Wed 1.6 33.0 ALICE BCM (UFO?) 2684 3.4 65.7 RF trip 2686 Thu 10 152 OP dump 2691 Fri 14 169.6 ROF/ROD/RSD2 trip (QPS SEU) 2692 Sat 22.8 241.8 FMCM RD1.LR1 (thunderstorms) Total 63.5 864 Stable beams ~ 63.5 hours in total (37.7 %) 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Main faults Cryo Pt8 Hours Faults Mon 28.5 2.5 ATLAS access Tue 29.5 10.5 Recovery from Sector 12 trip (2.5 h), Octupoles PC in S67 and S81 and QH PS in Sector 67 (5.5 h), RF controls (2.5 h) Wed 30.5 6 RF longitudinal blow-up (4 h) +OFSU (2h) investigations Thu 31.5 3 Accesses: CMS (1 h), QPS, Cryo, ALICE, BIC, RQS.A67.B1 replacement (2 h) Fri 1.6 1.5 RQTF.A81.B2 replacement Sat 2.6 Sun 3.6 16 Accesses: QPS Sector 67 (6.5 h), QPS Sector 45 (4.5 h), Vacuum controls (3.5 h) Collimator (TCLIB.6R2.B1 – LVDT – 1 h), TI2 BLM Power supply (0.5 h) Mon 4.6 Collimator controls, LBDS power supply Total 45.5 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Main faults by system System Time [h] Comments QPS 13 WorldFIP connectors, resets of old QPS PC 9.5 Radiation damage on auxiliary power supplies? RF 6.5 CPU replacement, Failure of long. blow-up not understood. Not appeared since. Collimators 5 Controls+LVDT failure Vacuum 3.5 Experiments OFSU 2 Not understood. Added monitoring. Not appeared since. LBDS Power supply Injectors 0.5 Could have been longer….(SPS interlock problem) Total 43.5 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Lost ramps Event Timestamp Beam Energy [MeV] Fill Number Comment 28-May-12 18:47:48 3492360 2672 BPMS out of limits - drifting readings 29-May-12 03:16:28 1497360 2674 OFSU crash – 240 CMW applications from LabView applications 30-May-12 06:19:48 3180240 2678 Longitudinal blow-up B1 didn't work. Collimator temperature interlock (TCTVB.4L8) 30-May-12 13:16:47 450120 2681 OFSU crashed just after mode change 01-Jun-12 03:09:07 3999960 2688 RQTF.A81B2 tripped after the end of ramp. Clean dump. 01-Jun-12 05:20:52 513720 2689 Same power converter tripped as for previous fill. RQTF.A81B2 tripped after starting the ramp at 514 MeV. Losses on TCDQ very low (due to the low energy and the ramp). Clean dump. c/o Post-Mortem DB 23 November 2018 Week 22 Summary - G. Arduini

Losses in adjust Event Timestamp Fill Number Mps Expert Comment 29-May-12 15:42:19 2676 beams dumped due to trip of ROF/ROD.A81.B1 (ROF.A67.B1 was also not available since 15/5) leading to instabilities at the end of the squeeze 01-Jun-12 01:17:29 2687 Test ramp with low intensity after LHCb polarity change. Clean dump. 01-Jun-12 11:01:40 2690 Incoherent beam losses for beam 2, during 4 sec with 75 kW the beams were dumped, by the BPM in IR6 at MQY.4L6. Clean dump. Probably not optimum tune. Beam 1 was ok. Clean dump 04-Jun-12 02:25:30 2695 BLM HV SW intlk – loss of communication c/o Post-Mortem DB 2676 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Losses during squeeze Event Timestamp Fill Number Comment 30-May-12 04:07:06 2677 QPS trigger intercepted by PIC. Clean dump. 31-May-12 03:10:39 2685 Corrector trip intercepted by PIC, small ~ 30 um rms orbit change for a short time before dump. Clean dump. c/o Post-Mortem DB 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Performance 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Performance 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Performance 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Performance 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Energy matching trims of -2.5x10-4 on B1 and -1x10-4 on B2. Tunes trim in parallel Check 144b injection – looks good Incorporate into ramp – phase tweaked by Philippe First turn B1 Synchro Loop 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Energy Matching 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini ADT results Wolfgang Hofle, Daniel Valuch ADT damping time 4 TeV measured by kicking non-colliding batch and colliding batch (12 bunch batches). Damping time as expected 30-70 turns approximately for centre of batch with faster damping for the colliding bunches with beating of sigma/pi modes as expected, pending detailed analysis. Gains V normalised gains at 0.04 H normalised gains at 0.08 --> increase from 0.04 to 0.08 in collision beam process does not change much anymore the damping time as we are saturating the gain knob just above 0.04  corrected yesterday At 4 TeV: maximum available is for H.B1 a normalised gain of 0.05 H.B2 a normalised gain of 0.0402 V.B1 a normalised gain of 0.05 V.B2 a normalised gain of 0.09 Stronger damping possible for V.B2 is mainly a result of higher beta functions compared to the others. 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini LHCb polarity switch Procedure to verify the LHCb settings implemented with test ramp with 3x12 bunches Offset of 50 mm found in the horizontal plane and corrected Still not completely transparent: 1 fill lost likely for independent reasons (wrong tune settings due to problem with the tune feedback during the ramp) Losses on some bunches when going in collision due to residual separation at the end of the collision process in IP5 28 mm (~1.5 sigmas full separation V) and In IP1 by 14 mm (full separation H) Procedure to be further improved 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini LHCb polarity switch LATLAS LCMS BBQ-B1H BBQ-B2H Instability developing in collision (B1 H). Managed to optimize point 5 and 1 and to go in stable beams. Results of optimization incorporated. 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini BPMSB.A.L6.H Drift in the position reading, not compatible with corrector settings in that area  Instrumental error Offset adjusted in the reference for position interlock at TCSG TCSG alignment to be verified for Beam 2 23 November 2018 Week 22 Summary - G. Arduini

Week 22 Summary - G. Arduini Plan and Pending Plan: TCSG alignment verification in point 6 (B2) (1 hour) Physics Pending: Scan up to 3 sigma (CMS). Propose to do that with reduced damper gain at the end of the fill. Verification of impact of TETRA and GSM transmission on the tunnel (30 mins with pilot beam at injection) Accesses: TCLIB.6R2.B1 electronics and LVDT sensor MAD PM15: motors of inner doors not working RQTL11.R7B2 temp DFBAN spikes affecting cryo start but not CM (~3 to 5 hours) 23 November 2018 Week 22 Summary - G. Arduini