10th MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE

Slides:



Advertisements
Similar presentations
IHB Report on IRCC-2HSSC-2. IRCC-2 Establish, coordinate and enhance cooperation in hydrographic activities amongst States on a regional basis, and between.
Advertisements

IHO INTER-REGIONAL COORDINATION COMMITTEE IRCC-6 Agenda item 10 Input from HSSC-5 IHB.
CBSC May 2015 (Mexico City, Mexico) Progress Report on the IHO GIS including C-55 IHB.
SEVENTH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE INTER-REGIONAL COORDINATION COMMITTEE (IRCC7) WEND WG REPORT.
MACHC WENDWG 4 4 rd Meeting held March 18-19, 2014 Highlights Review of WEND principles and governance ENC Issues (Gaps and Overlaps) WEND Database.
SEVENTH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE INTER-REGIONAL COORDINATION COMMITTEE (IRCC7) ANNUAL REPORT 2014.
Hydrographic Services and Standards Committee 7th MEETING OF THE IHO HYDROGRAPHIC SERVICES AND STANDARDS COMMITTEE (HSSC) Busan, Republic of Korea,
MACHC WENDWG 5 4 rd Meeting held March 3-5, 2015 Overlay Services (AIO) Update report on the study for overlapping ENCs Review of the WEND Principles.
Inter Regional Coordination Committee Revision of the IHO Strategic Plan and Input to the Long-term Work Programme /22 IRCC8-11.
Worldwide ENC Database Working Group
9TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
9th MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Hydrographic Services and Standards Committee
Standards” and by the Council key Priorities
Proposed IHO Work Programme for 2018
Report on IRCC9 Key Issues Relating to EAHC
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
Outcomes from the IRCC-9
IRCC work is guided by the IHO Work Programme 3
REPORT AND PROPOSALS FROM IRCC Reference Doc: C2-4.2A
THE IHO INTER-REGIONAL COORDINATING COMMITTEE IHO-IRCC 10 Goa, India
Development and future provision of S-100 based Products
Meso-American - Caribbean Sea Hydrographic Commission (MACHC)
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
International Centre for Electronic Navigational Charts
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
8TH MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Overlapping ENC data: IC-ENC Policy and progress IC-ENC Chairman – Capt Marc Van Der Donck IRCC9, June 2017.
Council-2 Readout MACHC19 November 29, 2018
Add Commission and date Sept 17, 2018
IRCC 10 Outcomes Complete IRCC report available on the IHO website
Draft procedure for ENC overlaps (IRCC6-08b)
BRIEF SUMMARY OF THOSE ITEMS FROM THE 2nd MEETING OF THE IHO COUNCIL
Worldwide ENC Database Working Group (WENDWG) Report
Arctic Regional Hydrographic Commission
EAtHC Seminar Lagos, Nigeria, October 2018 Capacity Building
WORLDWIDE ENC DATABASE WORKING GROUP
Arctic Regional Hydrographic Commission 8th Conference
France Application of the IHO Resolution 1/2018 Comment on IRCC report
MesoAmerican and Caribbean Sea Hydrographic Commission
WEND Update.
MesoAmerican and Caribbean Sea Hydrographic Commission
SWPHC – 27 February 2015 Rarotonga, Cook Islands ---
Report from the 7th Meeting of the IHO Hydrographic Services and Standards Committee (HSSC7) to NCWG April 2016, IHB, Monaco.
Council-2 Readout SWPHC February 13, 2019
Hydrographic Services and Standards Committee
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
Worldwide ENC Database Working Group (WENDWG) SWPHC16 Update
Operation of the Organization under IHO Convention and its supporting Basic Documents
IHO Secretariat, Monaco, November
IRCC work is guided by the IHO Work Programme 3
IRCC-7 Agenda item 10 Input from HSSC-6 IHB
WORLDWIDE ENC DATABASE WORKING GROUP (WENDWG)
What is Capacity Building?
IRCC-8 Agenda item 10 Update on the development of the IHO GIS IHB
Hydrographic Services and Standards Committee
Status Report of the SPRWG of the Council Future Strategic Plan
Status Report of the SPRWG of the Council
WENDWG – WENSWG Progress Report
NORDIC HYDROGRAPHIC COMMISSION (NHC)
Mediterranean and Black Seas Hydrographic Commission (MBSHC)
Dr. Mathias JONAS, Secretary-General (IHO Secretariat)
Status Report of the SPRWG of the Council
MBSHC-21, Cadiz, Spain (11-13 June 2019)
11th MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE
Dr. Mathias JONAS, Secretary-General (IHO Secretariat)
Report and Proposal from IRCC
Report and Proposal from IRCC
Presentation transcript:

10th MEETING OF THE IHO INTER-REGIONAL COORDINATION COMMITTEE INTER-REGIONAL COORDINATION COMMITTEE (IRCC10) WENDWG REPORT

WEND Terms of Reference To advise IRCC and to assist in facilitating a worldwide consistent level of high quality, updated official ENCs through integrated services that support chart carriage requirements of SOLAS Chapter V and the requirements of the IMO Performance Standards for ECDIS

8th WENDWG meeting Buenos Aires - Mar 18 WG ToRs Elimination of Overlapping ENCs IHO ENC Catalogue & Performance Indicators RENC Harmonisation & Distribution

8th WENDWG meeting Buenos Aires - Mar 18 (cont’d) Full Implementation of the WEND Principles Industry & Stakeholders Session Review and Update of the WENDWG Work Programme

WENDWG8 Report to IRCC10 Detail at IRCC10-07D1

Minor editorial changes implemented following IRCC9 endorsement. Key Aspects ToRs Minor editorial changes implemented following IRCC9 endorsement. Subsequent discussion on expansion of WENDWG’s role which will require IRCC10 direction and guidance (see later).

Key Aspects Elimination of Overlapping ENCs VAR and Distributor feedback: overlapping ENCs create confusion onboard ships. Little source data criteria means mariners forced to decide what ENC to display. Exacerbated by different ECDIS manufacturers having different rules for displaying overlapping data A very unsatisfactory situation

Key Aspects Elimination of Overlapping ENCs (cont’d) The IHO community needs to do much more to manage, and wherever possible eliminate, overlapping data. IHO Resolution on elimination of overlapping ENC Data in areas of demonstrable risk to safety of navigation. MS approved Feb 18

Key Aspects Elimination of Overlapping ENCs (cont’d) WENDWG consensus: One-year “clock” to resolve overlaps should begin once the overlapping issues, starting with the potential highest risk cases, have been reported to ENC producers. Management of overlap cases should be implemented by RHCs, reporting to IRCC and keeping WENDWG informed.

Key Aspects Elimination of Overlapping ENCs (cont’d) WENDWG consensus (cont’d): RHCs should make own assessment of level of navigational risk for ENC overlaps using IC ENC Policy on Risk Assessment as a first step where applicable.

Key Aspects IHO ENC Catalogue & Performance Indicators Catalogue now well publicised by IMO. ECDIS Guidance for Good Practice (MSC.1/Circ1503/Rev1 dated June 2017) More user-friendly version next. Ongoing work to link to INT Chart Web Catalogue and AIS traffic density database. Performance Indicators in abeyance pending outcome of Strategic Planning Review Working Group (SPRWG).

Key Aspects RENC Harmonisation & Distribution RENCs remain in period of maturity and stability High-quality support to HOs & EUSPs continues   PRIMAR R&D - future S-101 ENC validation/ distribution.  Aspiration for RENCs to access all ENC data for QC & overlap risk assessment. Harmonization should include exchanges with newly established EAHC Regional ENC Coordination Centre (EAHC RECC)

Key Aspects Full Implementation of WEND Principles At IHO level, need to better understand,, coverage & overlaps issues across regions RHCs reports on implementation of ENC Schemes are a crucial management information Existing IHO ENC Coverage catalogue used as initial mechanism to build ENC Schemes database within INToGIS II. Once system commissioned, RHCs should define and adopt ENC schemes for submission.

Key Aspects Stakeholders Session Last held at WENDWG6 and again at WENDWG8 Hugely informative, generating much discussion & and debate.

Key Aspects Stakeholders Session Outputs RENCs might consider offering S-57 licence management service to support safety of navigation for all classes of vessels.

Key Aspects Stakeholders Session Outputs (cont’d)  Explore options to support GEBCO Seabed 2030. initiative. US and NO to resubmit their paper to IRCC, seeking guidance on the possible expansion of the WENDWG scope.

Key Aspects Stakeholders Session Outputs (cont’d)  Subsequently WENDWG8, a wider MS Proposal submitted to IRCC. Seeks to expand WENDWG ToRs to accommodate intent within IHO Convention (IHO Publication M-1) that notes mission of the IHO to create global environment in which States provide adequate & timely hydrographic data, products & services & ensure their widest possible use. IRCC10 guidance is sought (later discussion)

Key Aspects WENDWG Work Programme Work Programme for 2019/19 submitted for IRCC approval WENDWG still has role to play within IHO

IRCC Action Requested Direct any WENDWG ToR changes based on the outcome of the IRCC10 Proposal regarding the widest possible use of hydrographic data, products and services. Reinforce the fact that the one-year “clock” to resolve overlaps should begin once the overlapping issues have been reported to ENC producers (as stated in paragraph 5 of the new adopted IHO Resolution 1/2018 – IHO CL 19/2018 refers).

IRCC Action Requested (cont’d) Endorse that the management of overlap cases should be implemented by RHCs. Note that RHCs should make their own assessment of the level of navigational risk for ENC overlaps using the IC ENC Policy on Risk Assessment as a first step where applicable. Note with concern that overlapping ENCs create confusion onboard ships and that IHO community should work to eliminate overlapping data; and note that this issue is worthy of further discussion at IRCC10 and C2.

IRCC Action Requested (cont’d) Commend the RENCs on their high-quality support to hydrographic offices and end-user service providers and for their contribution to Joint-RENC technical meetings to which the EAHC RECC is invited to participate. Note the WENDWG conviction that all ENC data should be made available to the RENCs not only for ensuring QC in general but also importantly for risk assessment of overlapping ENCs.

IRCC Action Requested (cont’d) Encourage RHCs to provide updated reports on the implementation of ENC Schemes to the WENDWG in advance of the yearly WG meeting. Note the recommendation that RENCs might consider offering a S-57 licence management service to support safety of navigation for all classes of vessels. Approve the proposed updated WENDWG 2018-19 Work Programme as given at Annex A and the continuity of WENDWG activities (WENDWG ToRs Art. 4.3 refers).  

Any Questions?