Sheung Li Task Group J Chairperson January 17, 2003

Slides:



Advertisements
Similar presentations
Doc.: IEEE /854R3 SubmissionSlide 1 July 2004 Sheung Li, Atheros Section 21 Procedure (formerly Procedure 10) Request for P802.11j Conditional.
Advertisements

Doc.: IEEE /0460r1 Submission March 2015 Slide 1 IEEE ah Closing Report for March 2015 Date: Authors: Yongho Seok (NEWRACOM)
Doc.: IEEE /0696r0 Submission May 2014 Slide 1 IEEE ah Closing Report for May 2014 Date: Authors: Yongho Seok (LG Electronics)
Doc.: IEEE /759r0 Submission November 2002 Bruce Kraemer, Intersil TK Tan, PhilipsSlide 1 Proposal to Amend a to address Japanese bands.
Doc.: IEEE /2263r1 Submission July 2007 Peter Ecclesine, Cisco SystemsSlide 1 TGy July Closing Report Date: Authors:
Doc.: IEEE /0377r2 Submission March 2005 Adrian Stephens, Intel CorporationSlide 1 Ballotting Process Improvements Notice: This document has been.
TGv Closing Report March 2008
Relevant Rules on Recirculation
TG 1 March Session Closing Report
Liaison Report Date: Authors: January 2012
IEEE aj January 2016 Closing Report
IEEE TGa Project Timeline
IEEE P Working Group for Wireless Personal Area NetworksTM
Matthew B. Shoemake Task Group G Chairperson November 15, 2002
IEEE Task Group G Status Update
TGn Closing Report Jacksonville, FL, US 802 Plenary – May ‘08
Sheung Li Task Group J Chairperson September 19, 2003
SG4a Project Timeline January 2003 doc.: IEEE /056r0
TGaf Waikoloa Closing Report
March 2002 November 2002 SEC Overview of WG Proposal to Amend a to address Japanese bands and rules PAR and 5 criteria Bruce Kraemer, Intersil.
Title: LE TG Closing Report for Session #61
Sheung Li Task Group J Chairperson May 14, 2004
TGn Closing Report Waikoloa, HI, US 802 Plenary – 8-12 September ‘08
IEEE TGmb Sept 2010 Agenda Date: Authors:
TGae Closing Report – May 2010
Motions and Supporting Material for EC Meeting Agenda Items
doc.: IEEE <doc#>
Task Group G Report March 10, 2003
Executive Committee Meeting
Submission Title: [TGn Liaison Report] Date Submitted: [20Jan2006]
Sheung Li Task Group J Chairperson March 14, 2003
TGn Closing Report Vancouver, BC, Canada 802 Plenary
Task Group J Midweek Report
MIMO Standardization Sheung Li September 15, 2004 September 2004
Proposed TGv Selection Process
802.11e Monterey meeting 09/13/02 September, 2002
TGn Closing Report – March ‘06
TGn Closing Report Los Angeles, CA, US 802 Interim
IEEE P Working Group for Wireless Personal Area Networks
TGaf Waikoloa Closing Report
IEEE Session #39 San Diego, California Closing Plenary
TGu Motions Authors: March 2010 Date: March 2010
Sheung Li Task Group J Chairperson January 16, 2004
Liaison Report Date: Authors: January 2012
January 2010 doc.: IEEE < > January 2010
IEEE SGa Project Timeline
802.11e Vancouver Report January 16,2004 January 15, 2004
Sheung Li Task Group J Chairperson July 16, 2004
TGu Teleconference Motions
TGn Closing Report Vancouver, BC, Canada 802 Plenary
Sheung Li Task Group J Chairperson March 19, 2004
TGn Closing Report Denver, CO, US 802 Plenary – July ‘08
Result: Yes - ; No - ; Abstain - .
TGg Report to the IEEE Working Group
TGm Closing Report – May 2010
Motion via Ballot IEEE motion Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot.
Motion via Ballot Motion for Approval to Start the Sponsor Ballot for IEEE P Revision Draft 5.0 Motion via Ballot Motion Start: May.
Proposed TGv Selection Process
TGaf Orlando Closing Report
TGae Closing Report – January 2011
January 2000 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Study Group Summary and Motion for .15WG.
Sheung Li Task Group J Chairperson March 19, 2004
EHT SG formation Motion
IEEE Task Group G Report to the IEEE WG
IEEE P Wireless Personal Area Network
TGg Report to the IEEE Working Group
Title: LE TG Closing Report for Session #61
EHT SG formation Motion
P802.11j Sponsor Ballot Procedure 10
TGaq Closing Report Date: Authors: March 2015 March 2015
Presentation transcript:

Sheung Li Task Group J Chairperson January 17, 2003 Task Group J Report Sheung Li Task Group J Chairperson January 17, 2003 Sheung Li, Atheros

Actions by TGj Selected Task Group Leadership January 2003 Actions by TGj Selected Task Group Leadership Reviewed PAR, 5 Criteria, Issues in J-band Reviewed Presentations addressing Issues Motion to instruct editor to incorporate material from presentations into candidate draft text 12 affirmative, 1 negative, 1 abstain Sheung Li, Atheros

TGj Working Issues Contained Complete January 2003 TGj Working Issues Contained While mechanisms may be used in other geographies, primary criteria for evaluation is 4.9 and 5.0 band operation in Japan as noted in PAR Complete As noted in PAR and presentations leading to it, will define standards for all modes defined by Japanese rules Sheung Li, Atheros

January 2003 Working Group Motions None Sheung Li, Atheros

Objectives for March 2003 Further Technical Presentations January 2003 Objectives for March 2003 Further Technical Presentations Review and Approve Draft 1.0 Issue a WG Letter Ballot Sheung Li, Atheros