SAB 3122 CONSTRUCTION TECHNOLOGY AND ESTIMATING CONCRETE AND REINFORCEMENT Dr. Chai Chang Saar.

Slides:



Advertisements
Similar presentations
COST EFFECTIVE MASS HOUSING TECHNOLOGY
Advertisements

FORMWORK Prof Awad S. Hanna.
SHOTCRETING K.V.SUBBA RAO.
2.2 STRUCTURAL ELEMENT Reinforced Concrete Slabs
Copyright © by NCCER, Published by Pearson Education, Inc. Carpentry Fundamentals Level One Module National Center for Construction Education.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
Taking off and ESTIMATING
Prof Awad S. Hanna Concrete Structures Concrete Structures.
Portland Cement and Concrete
CONCRETE MIX-DESIGN ACI
EXAMPLE QUESTIONS According to their sizes, aggregates are divided into 2 main groups, write down the names of these groups and give one example for each.
Concrete
Construction Cost Estimating Class #5 - Concrete Prof. Ralph V. Locurcio, PE.
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
Batching, Mixing, and Handling. Ordering or Specifying Concrete Alternative (1) Common: When the owner requires the concrete supplier to assume responsibility.
Framed Building Structure Lectured By: Ms. Noorhidayah Sunarti 15/4/2010.
Floor Systems and Foundation Support
Pad Foundation Lectured by: Ms. Noorhidayah Sunarti
Building Foundations Foundation Walls.
Topic : MIX DESIGN OF CONCRETE Properties of concrete Submitted To: DR. AYUB ELAHI Submitted By: SOHAIB NASEER 2K9-scet-29/CIVIL M.ZAEEM FAKHAR 2K9-scet-03/CIVIL.
Concrete Dry Quantities examples in class Week 3.
Concrete Construction
CONSTRUCTING A FIVE CABIN LATRINE
Chapter 11 Pricing Concrete Work. Objectives Upon completion of this chapter, you will be able to: –Describe the job factors and the labor and management.
Chapter 8: House Construction
Course No: CE 4000 INVESTIGATION ON THE PERFORMANCE OF BAMBOO REINFORCED CONCRETE BEAMS Supervised By: MUHAMMAD HARUNUR RASHID Presented By: MOHAMMAD TAREQ.
Villanova University Dept. of Civil & Environmental Engineering CEE Capstone II Structural Engineering 1 CEE Capstone II Structural Engineering.
Concrete Construction I Chapter 19. Mehta, Scarborough, and Armpriest : Building Construction: Principles, Materials, and Systems © 2008 Pearson Education,
Chapter 12 Concrete Construction Part 3 1CE 417, King Saud University.
Concrete By John Templeton. What is concrete used for? SidewalksDrivewaysFoundations.
Intro to Concrete 18.0 & 19.0 Class notes.
Plain & Reinforced Concrete-1 CE-313
Concrete One of the major building materials, (along with wood, steel, stone and brick), that can be used to make large and small elements, from parking.
Chapter 32 Floor Systems and Foundation Support. 2 Links for Chapter 32 Slab Construction Reinforcing Concrete Crawl Spaces.
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
CONCRETE TECHNOLOGY LECTURE NOTES PROF. DR. KAMBİZ RAMYAR
Chapter 23: Structural Drafting
PRESENTATION ON WATER COOLING TOWER
BASICS OF UK DETAILING. BS Codes : 1) Design code: BS8110 2) Detailing codes: BS8666 BS4449.
Name ________________ Unit 6/P6 – Concrete Construction Expensive Heavy and dense = strong, sound proof and thermally efficient. Cast in situ or pre-cast.
- LESS CONST. BUDGET - PREMIUM QUALITY - SHORT CONST. PERIOD - RELIABLE SAFETY - NO CRANE REQUIRED - LIGHT & EASY INSTALL Clear AccessManual Transfer Simple.
Mix your own concrete with our sand, gravel, and cement, or choose our ready- mixed concrete. We’ll even deliver it to your site! Low-maintenance bricks.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
SANKALCHAND PATEL COLLEGE OF ENGINEERING,
5. FERROCEMENT.
A Visual about the visit….
How to Make, Use, and Reuse an Arborloo. Step 1: Make the Concrete Slab Create 1 m Diameter ring of bricks and line with plastic and place brick/bucket.
CVL 2407 Faculty of Applied Engineering and Urban Planning Civil Engineering Department 2 nd Semester 2013/2014 Dr. Eng. Mustafa Maher Al-tayeb.
Engineering Technical English
Chapter 16: Concrete Engineering Technical English
Vocabulary fine aggregate الركام الناعم Coarse aggregate الركام الخشن
APPLICATIONS OF TECHNOLOGY
Introduction Used for covering spaces in the form of roof or floor
Table (3.1)- the averages of the 10 models costs
Estimating the Cost of a Concrete Pad & Rebar (Revised: )
FORMWORK DR. Nabil Dmaidi.
Planning and Placing Concrete
(i) proper arrangement of reinforcing bars and
BUILDING CONSTRUCTION 1
Embodied Energy Analysis of a Pre-cast Building System
Building Construction I Sofia Sebastian 1
Batching, Mixing, and Handling
SAB 3122 CONSTRUCTION TECHNOLOGY AND ESTIMATING Excavation
What are the Requirements of an Effective Construction System?
Concrete Structures DR. Nabil Dmaidi.
Building Frame (Column & Beam)
STRUCTURAL TIMBER FRAMING
Concrete A structural material made by combining cement, sand, aggregate, and water.
FBE05 – Mathematics and Statistics
Presentation transcript:

SAB 3122 CONSTRUCTION TECHNOLOGY AND ESTIMATING CONCRETE AND REINFORCEMENT Dr. Chai Chang Saar

CONCRETE WORKS 3 MAIN ITEM concrete reinforcement bar formwork 11/23/2018

Concrete Mixing on Site using Cement, Sand & Aggregate 11/23/2018

MATERIAL 1) CONCRETE Material Material from mixture of cement : sand : aggregate & water Example: 1: 2 : 4 (Concrete Grade 20), 1:3:6 (Concrete Grade 10) Cement Aggregate Sand 11/23/2018 Concrete Mixing on Site using Cement, Sand & Aggregate

MATERIAL Shrinkage - Shrinkage when pour up Wastage - Wastage when placing, mixture Consolidated -Consolidated when compacted Consolidation compacts fresh concrete to mold it within the forms and around embedded items and reinforcement and to eliminate stone pockets, honeycomb, and entrapped air. 11/23/2018 Concrete Mixing on Site using Cement, Sand & Aggregate

LABOUR There are 3 types for concrete mixing on site using cement, sand & aggregate: 1) Mixing, hoisting & placing by hand Average output to mix the concrete 2.00hr/m3 concrete 2) Mixing by plant with hoisting & placing by hand 3) Mixing, hoisting & placing by plant 11/23/2018 Concrete Mixing on Site using Cement, Sand & Aggregate

LABOUR Hoisting & placing by hand (Table 1) 11/23/2018 Concrete Mixing on Site using Cement, Sand & Aggregate

MIXING, HOISTING & PLACING BY HAND Build up rate for 1m3 reinforced in-situ concrete Grade 25 ( 1:1½:3) in isolated column by hand. Assumption Concrete Grade 25= 1:1½: 3 Cement = RM 13.00/bag (1m3=28 bag) Sand = RM 16.50/m3 Aggregate= RM 35.00/m3 Mixing =2hr/m3 Hoist and placing = 8hr/m3 General worker =RM40/day Allow 25% of shrinkage, wastage & consolidated Allow 20% profit and overhead (Applicable to all build up rate) 11/23/2018 Concrete Mixing on Site using Cement, Sand & Aggregate

MIXING BY PLANT, HOISTING & PLACING BY HAND Machinery/plant Mixing by concrete mixer (Table 2) Size of mixer Workers needed Output/hr (m3 Diesel/hour (litre) Lubricator/hour (litre) 5/3½ 1 operator 1 general 1.25 1.10 0.04 7/5 3 general 2.25 1.60 0.06 10/7 4 general 3.25 1.80 0.07 14/10 4.50 2.10 0.08 18/12 6 general 5.50 2.40 0.10 11/23/2018 Concrete Mixing on Site using Cement, Sand & Aggregate

MIXING BY PLANT, HOISTING & PLACING BY HAND Build up rate for 1m3 of reinforced in-situ concrete Grade 25 (1:1½:3) in isolated column. Assumption: Concrete mixer 7/5 Life-cycle = 4 year Purchase value = RM 15,000.00 Scrap value = RM 2,000.00 Interest = 10%/year Maintenance = 10% Mobilization = 5% Diesel = RM 1.90/litre Lubricator = RM 20.00/litre Average working day = 200day/year Operator = RM 50.00/day General Workers = RM 40.00/day To build up the cost for 1m3 concrete, shall include: Material cost Cost of concrete mixer and labours Cost for hoisting and placing by hand 11/23/2018 Concrete Mixing on Site using Cement, Sand & Aggregate

MIXING, HOISTING & PLACING BY PLANT Build up rate for 1m3 reinforced in-situ concrete Grade 25 (1:1½:3) in isolated beams – m3 Assumption: Crane 15 tonne (rental) = RM 400.00/day (inclusive operator & fuel) Crane output for placing = 15m3/day 5 general worker for hoisting & placing Material cost/m3 (as previous) = RM 112.22 Mixing cost by mixer/m3 (as previous) = RM 12.80 Cost for hoisting & placing by crane 11/23/2018 Concrete Mixing on Site using Cement, Sand & Aggregate

Ready Mixed Concrete 11/23/2018

READY MIXED CONCRETE Ready mixed concrete Concrete is ready mixed in the factory and will send to site by supplier 11/23/2018 Ready Mixed Concrete

READY MIXED CONCRETE Build up rate for 1m3 ready mixed reinforced concrete Grade 25 in isolated beams Assumption: Rental crane 15 tonne = RM 400.00/day (inclusive operator & fuel) Crane output to placing = 15m3/day 5 general worker to hoist & placing Ready mix concrete = RM 200.00/m3 (inclusive delivery to site) Allow 5% concrete wastage 11/23/2018

Reinforcement 11/23/2018

Tying bar for 1 tonne (kg) RE-BAR MATERIAL Add 5% wastage for re-bar Allowance for rebar wire Table 3 Diameter (mm) Tying bar for 1 tonne (kg) 6-12 10 16-25 6 32-50 5 11/23/2018

RE-BAR LABOUR Output general worker 1.50 hr for 1 tonne bar Output for cutting, bending (Table 4) Output for placing (Table 5) 11/23/2018

RE-BAR Build up rate for 1 kg of 16mm diameter High Tensile reinforcement in straight and bent bars in foundation Assumption: Cost for 16mm dia = RM 1,800/tonne Cost for tying bar = RM 3.50/kg General Workers = RM 40.00 per day Cutting, bending & placing = RM 60.00 per day 11/23/2018

FABRIC REINFORCEMENT MATERIAL Allow 5 % wastage Allow 10% for tying bar Allow 10% for lapping 11/23/2018

FABRIC REINFORCEMENT LABOUR Output for general worker 0.15hr/m2 Output for cutting, bending, placing Location Barbender-hr/m2 Bed, floor, roof 0.20 Foundation 0.25 wall 0.33 Staircase 0.50 11/23/2018

FABRIC REINFORCEMENT Build up rate for1m2 fabric reinforcement BRC A6 in suspended floor slab Assumption Fabric reinforcement per pcs = RM 70.00 1 pcs of fabric reinforcement = 6.00m x 2.20m General Workers = RM 40.00 per day Cutting, bending & placing = RM 60.00 per day 11/23/2018

Formwork 11/23/2018

MATERIAL Can be used more than once: -Slab and wall can be up to 6 times usage -Foundation, beam and column normally only for 4 times usage Nail is inclusive in the built up rate, 0.35kg/m2 10% of formwork wastage Strutting for formwork 11/23/2018

STRUTTING Strutting Location Strutting (m3) Side of column 0.02 Sides of fdnt & wall 0.04 Sides & soffit of beam 0.05 Sides & soffit of slab 0.06 11/23/2018

LABOUR Determine sawn formwork or wrought/wrot formwork Add 25% for wrought formwork Output to prepare, placing and take out 11/23/2018

FORMWORK Build up rate for 1m2 Sawn formwork to soffit of suspended floor slab. Assumption: 12mm thick board with 2.40m x 1.20m = RM 35.00/piece Timber = RM 900/tonne (1 tonne = 1.40m3) Nail = RM 4.50/kg 11/23/2018 11/23/2018

THE END 11/23/2018