Monday – recovery from MKI flashover

Slides:



Advertisements
Similar presentations
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Advertisements

LHC progress with beam & plans. Of note since last time Transverse damper Beta beating in the ramp Collimation set-up at 450 GeV & validation LBDS – systematic.
Scrubbing Run: TDI, MKI and MKE interlocks Chiara Bracco, Jan Uythoven ABT/BTP Acknowledgments: T. Baer, M. Barnes, E. Carlier.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Wednesday
Wednesday 8.9 External crossing angles:
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 24 March 2012.
Wednesday 21 March 2012.
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Monday :00 Stable beams 9_6_6_6 13:40 Access.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday fill with 1092 bunches (6 h stable beams)
Thursday morning – optics correction
Monday 6th August & night
LHC commissioning Week 38
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Thursday 10th May - morning
Saturday 2/4/ :00-09:00 Problems with SPS:
Week 36 plan Todo’s: And also: 12+b injection.
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
LHC Operations overview Week 28 – Getting back
Week 35 – Technical Stop and Restart
Friday 14th December - morning
Summary of Week 26 Main aims: G. Arduini, B. Holzer, M. Lamont
Monday Morning – recovery from cryo.
Tuesday Loss maps in the night:
Friday morning 10:30 Optics measurements and corrections.
Saturday – Morning 7:36 beams dumped
Finally.... We had to wait a long time.... We had many problems....
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday
Wednesday 09 March …:09:00: beta* measurement (1.5 m) by K-modulation and with AC-dipole excitation. 1/17/2019 LHC 8:30 meeting.
Wednesday 03/11 – The Plan Finish electron-cloud program:
Friday 23rd March 08:00 Access
Aims for the week Recover from technical stop and precycle at 10A/s
Thursday morning 08:45 Stable beams fill 2855 for ATLAS/CMS VdMs.
Monday 24 October hours of 25ns MD
Monday 14:00 beam dump Access:
Tuesday morning 08:30-09:00 Squeeze with probe.
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Scrubbing progress - 08/12/2012
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Sat morning Until 12:40: Loss maps at injection
Thursday 22 September 2011.
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Tuesday – Morning and Evening
RAMP FOR COLLIMATOR SETUP
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday
Thursday 10:00 Fill 1986 in stable beams.
Monday 152 bunch operation summary
Saturday Morning used to complete the loss maps and asynch dumps (with RPs). All loss maps OK (B. Salvachua), but the off-p cleaning for B1 (Lead) was.
Wednesday Following the struggle with the vacuum in IR2 over the night, drop intensity to 1.2E11/bunch. Fill first B1 – pretty quiet – then B2 – quite.
Presentation transcript:

Monday – recovery from MKI flashover Extensive re-conditioning of MKI8 in the morning. Beam back midday. Afternoon: IR8 TDI angular alignment (check). Beam edge defined with TCP. Move one of the TDI jaws into the beam with a given angle until beam is fully absorbed. Repeat different angles. Jaw aligned when the centre given by upper and lower jaw is minimum. Results being analyzed... 11/23/2018 LHC 8:30 meeting

Ramp, squeeze, loss map Evening solenoids on around MKI2/8. Little/no effect. 18:30: Ramp with 2 nominal bunches for loss map. One injection (1 nom) dumped on TDI in IR2 – seems the injection timing event was not sent out, but the SPS extraction event was sent: beam extracted and not injected. ALICE BCM trigger. Ramp with feed-forward of RT trims (to reduce criticality of OFB). ¾ successful…see next slide. Off-momentum loss map (dp/p < 0) – seems OK. 11/23/2018 LHC 8:30 meeting

Ramp, squeeze, loss map H plane not OK in squeeze ?? V plane OK 11/23/2018 LHC 8:30 meeting

Filling for physics Fill 1721, 336 bunches, 36 bunches/inj. Bunch intensities ~ 1.15E11. Dumped by SIS at 00:30. Interlock on HOM powers – lost communication. 1.7 pb-1. 11/23/2018 LHC 8:30 meeting

Ramp and squeeze fill 1721 Again large RT trims in the squeeze Suspicion on parameters for correction (no. eigenvalues for SVD too large [from slowly increasing no. of bad BPMs]?). 11/23/2018 LHC 8:30 meeting

Filling for physics 01:30 TOTEM interlock, crate power off. Fill 1722, 336 bunches, 36 bunches/inj. Bunch intensities ~ 1.15E11. 11/23/2018 LHC 8:30 meeting

Ramp and squeeze fill 1722 Again large RT trims. In the squeeze. 11/23/2018 LHC 8:30 meeting

UFO rates in recent fills T. Baer 11/23/2018 LHC 8:30 meeting

UFO rates versus intensity T. Baer 11/23/2018 LHC 8:30 meeting

Example: Loss at MKI for B1 Loss starts at BLMEI.05L2.B1E20_MKI.C5L2.B1 BLMQI.04L2.B1E20_MQY at 98% of dump threshold (RS5) At 3.5 TeV stable beams.

Example 2: Loss at MKI for B2 Loss starts at BLMEI.05R8.B2E10_MKI.C5R8.B2 During scrubbing (450GeV)

BLMs with highest loss Between 08.04.2010 and 18.04.2010 in total 246 fast loss events around MKIs. (57 around MKI in IP2, 189 around MKI in IP8). Distribution of BLM with highest loss in RS04 (start of losses varies as well): Left of IP2 Right of IP8

Fast losses during scrubbing Typical scenario for fast losses at MKIs during scrubbing: Loss spikes occur in first few minutes after an injection and go away then. (correlation to e-cloud?)

Today 08:30-09:30: Access for PS. New TDI settings, TDI protection check in IR8. Injection of 72 bunches. Physics with 336 b - 72 b/injection but moderate intensities (~ last 2 fills) ? Tomorrow: Ramp and squeeze, loss map dp/p > 0. Switch to 480 bunches – tbc. Wednesday: no beam from 16:00-19:00+ for VIP visit. 11/23/2018 LHC 8:30 meeting