Run coordination Summary

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

19 March 2012Muon Week - Operations1 Muon Week Muon Operations Session Introduction Status and LHC Schedule Detector Readiness + Preparation for Physics.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
Zhen YAN, Muon Offline DQ meeting, 05/10/2015 Signed off runs(express stream) since last Friday meeting Default defects:  MS_RPC_BA_ROD_PROBLEM_1  MS_RPC_BC_ROD_PROBLEM_1.
L1Calo Operations Summary
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Risultati del run di integrazione M4
Last 24 hours RQ4.L1 Lost going into collision Test ramp Storm
Machine Coordinators: G. Arduini, J. Wenninger
MD2036: UFO dynamics studies and UFO fast detection
Luminosity lifetime – fill 2932
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Summary Friday h38: Ramp down and pre-cycle.
L1Calo Operations Summary
Monday 11/07: Recovery Plenty of accesses.
Last 24 hours RQ5.L1 RQ4.L1 RF trip Line4B LHC status.
Summary of ion week 48 Last beam OP summary of 2010 Week 48
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Saturday 12:00 Fill 1992 in stable beams.
Thursday morning – optics correction
Tuesday 22nd January - morning
Power cut 18kV cable for EMD404/E9 is heating
Summary of Week 11: 14 – 21 March
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
LHC commissioning Week 38
Bernhard Holzer, Joerg Wenninger
Friday 31st August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Tuesday 28th September Fill 1375 ongoing 09:00 Move in Roman Pots
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
04-05/08/2010 End of physics at ~11:00 after 18.5 hours ~120 nb-1.
Yesterday’s morning’s controls issues
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Wednesday 10/5 Cryo recovery until 18:30
Sunday/Monday & :30 Stable beams. Fill #1851.
Thursday Physics fill 1250 (with 13b) dumped at 10.30
Run coordination Summary
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Saturday Wire scans at end of fill 1253 B1H : 4.2 B1V : 4.3 B2H : 5 B2V : 7.2 Beams dumped (after ~14h of collisions) Some issues during refill.
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
07/08/2010 Fill #1264 dump at 02:14:38.
Thursday 22 September 2011.
Friday morning 08:00 Stable beams with 840b.
Friday 28 October 2011.
Fri :52 Stable beams fill #2536
Thursday
Saturday 24 September 2011.
Saturday 2nd October BLM threshold follow-up - Bernd Dehning and Joerg Wenninger Following MPP approval, Bernd Dehning has increased the BLM thresholds.
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova,
Friday 15th February - morning
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Wednesday 26 October 2011.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
31/3/2010 Difficult day… but at the end stable beams.
Wed 12/10 09:30 – 10:30 Ramp down of ALICE solenoid to 50% nominal field on request of ALICE. Increase of the vacuum (e-cloud in this area that has not.
Wednesday 6.10 Morning: Quench test at 450 GeV
Tuesday
Friday 1st October : Van der Meer scans
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Run coordination Summary C. Gemme – INFN Genova August 16th, 2016 5197 2172b 5181 2076b 5183 2173b 5199 2220b 5187 2172b 5194 3b 5198 2172b

LHC LHC Cardiogram

LHC dipole

LHC More bunches on Sunday!

Daily Operations - AC & AO LHC Last 24h Plan No beam in the morning. Then: new scheme with 2220b, 225ns spacing Aim to push to 1.2e11 bunch intensity in the coming days. Friday, November 23, 2018 Daily Operations - AC & AO

Daily Operations - AC & AO LHC status A31L2 Thursday: analysis of measurements No sign of changes in short Two “quenches” while ramping down RB.A12 from 6 kA with -10 A/s High current quenches must be avoided: would destroy the magnet 10 June 2016 @ 547 A FPA would trigger QPS heaters  destroy magnet 3 Aug 2016 @ 295 A The second event triggered detailed investigations. Leave diagnostic tools in Mitigation measures: Could be explained with inter-turn short Remove “global protection mechanism” [link with FPA in other circuits in the same sector] present at high current and absent at lower currenttransition triggers QPS Follow-up (Wednesday) Reduce UFO-induced quenches: BLM thresholds to end of Run 1 values additional instrumentation Measurement campaign Increase QPS thresholds to minimise quench heaters intervention during FPA Various types of cycles evening and overnight. Friday, November 23, 2018 Daily Operations - AC & AO

Daily Operations - AC & AO LHC Plans Remove global protection mechanism: implemented on Thursday and validated Reduce BLM thresholds on complete MB and MQ arc families: thresholds changed on Thursday and changes to be continued on Friday Increase QPS thresholds on A31L2: new board installed on Thursday and successfully validated PS recovering from the vacuum leak More news at 10 am (hopefully the sector valves can be opened by midday) Cryogenic system: Pt 4 and Pt 6 were back around midnight RB.12 cycled to 6.5 TeV as of 21:30 on Thursday: no trips or other abnormal behaviour observed Two scenarios: PS is back in operation before the change of BLM thresholds is completed LHC can be safely operated and injection  tests carried out (in view of p-Pb run) Once BLM changes are ready, resume physics with the same filling scheme used before the stop The LHC is back in operation before the PS While waiting for beam, access might be given Friday, November 23, 2018 Daily Operations - AC & AO

ATLAS One slide eachfor Data Quality and TDAQ Trigger L!calo L1topo e new item Id, Lar, Tile, Muons NCB/BCM/BLM/DBM/RADMON

Details C’e’ il run di domenica notte che forse non e’ stato ancora detto con casino sulle TGC??

Daily operations Peak lumi: 1.02x1034cm-2s-1 Lumi Ready Rec: 322 pb-1 Stable: 13h 24m 2076b_2064_1692_1765_96bpi_23inj Fill 5181 – Run 305777 [02:13] Stable beam Smooth running [15:30] Programmed dump Interfill and LHC injection tests [17:38]  Quick Test to configure/unconfigure L1CTLatencyChecker for CTP on-call. [17:46]  Combined quick L1Calo/L1topo [18:05]  Start of Run: FATAL thrown by L1CTLatencyChecker, CTP on-call enquired. [18:17] Several attempts to restart  L1Muctpi and LatencyChecker unsuccessful; Rebooting the L1muctpi machine fixed it.

Fill 5183 – Run 305811 Peak lumi: 1.04x1034cm-2s-1 INDIV bunch added for IBL timing scan. [19:15] Stable beam 20:07 TGC busy for several seconds, in coincidence with exception from TGC-RCD-C05. Such error appeared later on repeatedly with no busy. 22:07 LAR HEC A HV (Not at Optimal voltage) 22:28 TGC HV A M2 Sector 12 tripped and recovered 23:05 IBL timing test begin: Go from 2BC to 3BC readout. Trigger with special keys to keep the rate < 65 kHz and enhance individual bunch. 01:08 Reverting at 3 BC and to standard keys. 04:15 SCT Busy [05:37] Beams dumped Peak lumi: 1.04x1034cm-2s-1 Lumi Ready Rec: 273 pb-1 Stable: 10h 22m 2173b_2161_1838_1916_96bpi_25inj SCT is still 100% busy despite the sct-rod-removal and sct-rod-recovery. Expert called. 04:28 SCT expert enabled data taking again. However, one SCT ROD now missing. Expert working on recovering it. 04:38 SCT ROD back again. SCT RC called back and said that a link was being very problematic, but it was not showing up as a link error. Interfill Calibrations Problems in starting the run  HLT expert informed. Access until 12

Peak lumi: 1.06x1034cm-2s-1 Lumi Ready Rec: 260 pb-1 Stable: 9h 33m 2172b_2160_1855_1948_96bpi_24inj Fill 5187 – Run 305920 [20:28] Stable beam 01:35 ERROR TGCFE RCD_ECA03  TTC restart on TGC needed according to the expert. Successful. 03:19 DCS alarm: TRT ENDCAPC LV Stack26 … LV has been switched off in this FE board. expert called, performing intervention. Solved. Few occurrences for IBL causing 100% deadtime [06:03] beam dump, trip of RQ4.L5 DQ: InDet-Eff: Hit efficiency in EA and EC are 1% lower than reference similar in yesterday's run. InDet-Tracking: Hot spot in eta-phi tracks with no IBL hit but a hit Is expected in eta~-2.5, phi~3: also appeared in previous runs, inform the ID shiftershould not be a problem Trigger: Many Histograms in DQMD are flagged red (see summary previous shifter), becomes difficult to spot if a new issue pops up.

Weekend Summary Friday Saturday Sunday C. Gemme, INFN Genova, RM report 15 August Weekend Summary Friday Saturday Sunday

Weekend summary: Friday Beam recovery LHC not available yet in the morning PS problem (fixed at noon) LHC implementing protections for the faulty dipole ATLAS calibrations CTP sw tests (very quick), not done the longer test announced in the morning; CSC test: From now on, CSC will NOT give "LatenctMismatch" error, and will just set the latency correctly without any expert intervention. CTP + L1 topo test Afternoon standalone long tests for several subdetectors: Tile, CSC, TGC, MDT (testing recovery of the chambers in standalone) ATLAS data taking LHC planning a first full round with 3b only  Defining keys as STANDBY [~19] a first injection but beam dumped  21:35 New access needed to fix beam dump system at point6 [00:38] Stable beam for 3bunches Fill 5194, just few minutes [05:51] Stable beam for 2722b Fill 5196  just few minutes

Fill 5194 – Run 306247 – Single_3b_2_2_2_with_nc_probes [00:00] Switch to standby keys for 3b. However L1_RD0_UNPAIRED_ISO went up to ~2 kHz since prescale of ~65000 got set to 1 when moving to 3b standby keys  activate FFTV protection for IBL and cause 100% IBL busy. [00:20] Need a TTC reset of IBL was issued. [00:39] Stable beam 3 bunches 7’ with stable beam [00:43] Beam dump Fill 5196 – Run 306252 - 25ns_2172b_2160_1855_1948_96bpi_24inj 05:51 stable beams 05:55 beam dump due to electrical perturbation

Weekend summary: Saturday Physics 08:30 Stable beam for 2722b Fill 5197 16:43 Stable beam for 2722b Fill 5198

Fill 5197 – Run 306269 Peak lumi: 1.06 x 1034cm-2s-1 Lumi Ready Rec: 159 pb-1 Stable: 5h 15m 2172b_2160_1855_1948_96bpi_24inj Fill 5197 – Run 306269 [08:34] Pixel: noticed by chance during ADJUST that the PPC of ROD_L1_S10 was stuck. Tried to recover before declaration of stable beams Ready for physics delayed by ~3’. PPC status should be checked routinely until an automatic monitoring can be established. [08:38] Stable beam Enabled several additional L1Topo items. The L1 rates all seem fine and the stream rate is around 40 Hz. Trigger shifter noticed that some Predictions need to be updated. L1_3J50 looks wrong to be followed up. [13:52] Beam lost due to BLM UFO Some busy by RPC, TGC, Pixel, SCT

Fill 5198 – Run 306278 Peak lumi: 1.08 x 1034cm-2s-1 Lumi Ready Rec: 392 pb-1 Stable: 16h 23m 2172b_2160_1855_1948_96bpi_24inj Fill 5198 – Run 306278 16:35 noticed in adjust some delay (1-2’) between the ATLAS pref lumi and the ‘same’ information in page1. It is correct in ATLAS toLHC tab [16:43] Stable beam 21:45 LAR EMEC HV TRIP - recovered 01:12 power cycle of Tile Module LBC44 DQ In histogram "Eta-phi of tracks with no IBL hit but hit is expected, ratio to total tracks" in OHP, there are some hits expected (but without IBL hit) around (eta,phi)=(-2.5 , -1.5). MDT got 50% busy on and off around 07:42 for 5 minutes. The offending channel was BC-0 and it was fixed by itself at 07:48. [09:02] Beam dumped Some busy by IBL, SCT, MDT

Weekend summary: Sunday Data Taking Changed EMECA HV Module as 4 channels do not work LHC raising to 2220b

Fill 5199 – Run 306310 Peak lumi: 1.04x1034cm-2s-1 Lumi Ready Rec: pb-1 Stable: 25ns_2220b_2208_1940_2036_96bpi_24inj Fill 5199 – Run 306310 25ns_2220b_2208_1940_2036_96bpi_24inj [13:01] Stable beam [] Beam lost