API SC6 Valves and Wellhead Equipment TG3 – Wellhead Design in Standards and TRs Kenneth Young 22 Feb 2012 22 Feb 2012 SC6 Winter Meeting - 2012
Work Items API TR PER15K API TR 6AF2 6A / ASME Design Methods Protocol for Verification and Validation of HPHT Equipment API TR 6AF2 Capabilities of API Integral Flanges Under Combination of Loading 6A / ASME Design Methods John Fowler Casting and Forging Study George Hill / Sterling Lewis 22 Feb 2012 SC6 Winter Meeting - 2012
API TR PER15K Ballot #3 closed 18 Nov 2011 17 Affirmative, 1 Negative, 1 Abstained, 8 Did Not Vote Ballot PASSED with 99 comments Negative ballot had only 2 comments Next meeting – 13 Mar 2012 at Conoco to resolve ballot comments Plan to publish by June 2012 22 Feb 2012 SC6 Winter Meeting - 2012
API TR PER15K – Implementation API 17D Activity API 17TR8 HPHT Committee – Brian Skeels Last meeting held Nov 2011 Committee drafting flow charts for verification and validation Pressure containing Pressure Controlling Pressure Retaining Bolting / Closure Mechanism Non-Metallic Sealing Materials Next meeting March 13, 2012 at FMC Plan to meet every 2 weeks 22 Feb 2012 SC6 Winter Meeting - 2012
API TR 6AF2 Ran analysis and revised charts 3-1/8” – 5000 psi 6B flange 4-1/16” – 5000 psi 6B flange Completed report / submitted to API – April 2011 22 Feb 2012 SC6 Winter Meeting - 2012