Building Construction I Sofia Sebastian 1

Slides:



Advertisements
Similar presentations
ROOFS.
Advertisements

BUILDING CONSTRUCTION
Enzyme Stabilized Mud (Earthen) Construction using DBV-1
ROOF SLOPES.
Roofs are one of a building’s primary elements and play a major part in giving a building its character. There are several different types of roof in.
NGfL CYMRU GCaD FLOOR COVERINGS.
Timber Framed Structures
Materials used in the external walls. Brick Bricks are probably the oldest manufactured material we have today. Although the method of production has.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
INAR 243 FLOORS.  Structural element  Proper ground for functions.
Floors construction After the foundations have been completed and the external walls constructed the construction of the floors commences.
Ground-Supported Slabs • Exterior Flatwork
Walls Ron Gatepain constructionsite.
Building Methods Types of Structure.
Fire Behaviour Elements of Structure and Fire Development.
The development of floors After the foundations have been completed and the external walls constructed the construction of the floors commences. There.
Masonry. Terms –F > 15-5 –Go thru all figures –Joints between brick = ¼ inch.
EXTERIORS FOR WOOD LIGHT FRAME CONSTRUCTION
Chapter 20 Roof Plan Components.
After the foundations have been completed the walls are set out and construction commences. wall structures.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Roof Parapet Details.
Chapter 18 Foundations.
Concrete Over site 300mu DPM / 1200 gauge (Tape all joints with Polythene Tape) Floor finish 50mm Gvylon screed 250mu DPM -clear plastic (Tape joints with.
Concrete Construction
Topic C3 Superstructures - roofs. Flat roof pros and cons Flat Roofing – Advantages Good for smaller structures, such as garages and extensions. Flat.
Exterior Wall (Masonry)
Prefabricated Timber Frame Construction
Unit 26. Sizes 7-5/8” high 15-5/8” long Common depths – 8”, 10”,12” 3/8” mortar joints Walls usually stand 7’-4”
Construction of a Traditional Mongol Ger. The ger is perfectly adapted to the Mongol nomad lifestyle. The ger has been in use for centuries with little.
Btec Construction Unit 5 Methods of construction for domestic buildings.
Unit 1003 Building methods and construction technology © Pearson Education 2010 Printing and photocopying permitted Learning Outcome 2 Know about the construction.
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
SOME COMMON RELATIONS USED IN BUILDING ESTIMATES
FLOORS CONSTRUCTION After the foundations have been completed and the external walls constructed the construction of the floors commences.
Roof types. Roofs are part of the external envelope that spans the building at high level. They also have structural, weathering and insulation functions.
Learning Outcome Lesson Objective
Causes of fire &precaution: The variouscauses of fire are as follows: 1. Careless smoking. 2. Faulty electrical wiring or short circuiting. 1.
Carpentry & Joinery Diploma Level 1 Flash Cards.
Building construction Prepared by : Rall no : : Nayani Paril : Patel Nikunj : Parmar Mihir : Patel Adarsh : Patel Bhavin.
Today where cost of land and expenses of building material are touching new heights, buying a home is just like a dream for common man..
Substrate Identification Floors. Principal Substrates T & G floorboards Flooring grade boards Concrete Screeded concrete Tile Backer Boards Under Floor/Under.
Cavity Wall Construction
CONCRETE AND SUSPENDED TIMBER
Warm-up 9/20/16 What is the underlayment called below the shingles?
OBJ: SWBAT create a CAD Rendering of a Utility shed.
Prefabricated Timber Frame Construction
Timber Framed Buildings
Prepared By: Alka Shah Civil Engineering Department
UPPER FLOORS TIMBER AND CONCRETE.
Types of ground floors.
Construction Technology
Floors.
CEN 180: Civil Engineering Drawing II
DAMP-PROOFING AND WATER-PROOFING COURSE
Warm-up 9/19/16 What template are we using?
BUILDING CONSTRUCTION 1
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
MATERIALS AND CONSTRUCTION I
Building Construction I Sofia Sebastian 1
International Building Materials and components
Arch205 building construction wall systems- Masonry
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
Building Construction I Sofia Sebastian 1
Components of Construction
MATERIALS AND CONSTRUCTION I
Building Construction I
Building Construction I Sofia Sebastian 1
Common Components of a Traditional Wood Framed Building
Presentation transcript:

Building Construction I Sofia Sebastian 1 Roofs Building Construction I Sofia Sebastian 1

Building Construction I Sofia Sebastian 2 Flat RC Roof Flat roofs – timber or reinforced concrete Advantages of flat roofs Easy to put up Create extra usable space if they are accessible Easily maintained They lose heat A reinforced concrete roof is built exactly like a reinforced concrete floor slab Solid or hollow pot construction Disadvantages of flat roofs They are not as weather proof as pitched roofs The finishes do not last as long as roof tiles Building Construction I Sofia Sebastian 2

Building Construction I Sofia Sebastian 3 Flat RC Roof The top of the structural slab for a flat reinforced concrete roof is laid level Fall – 1:80 The falls are provided by a cement and sand screed that has the correct slope Finishing off a flat reinforced concrete roof The edges of a flat reinforced concrete roof can be finished off by constructing An overhanging roof that takes the edge of the roof over the surface of the external wall A parapet roof that extends the edge of the external wall higher than the roof Building Construction I Sofia Sebastian 3

Building Construction I Sofia Sebastian 4 Finishing off a flat reinforced concrete roof Overhanging roof Building Construction I Sofia Sebastian 4

Building Construction I Sofia Sebastian 5 Finishing off a flat reinforced concrete roof Parapet roof Building Construction I Sofia Sebastian 5

Building Construction I Sofia Sebastian 6 Flat RC Roof Finishing off a parapet roof Copings – short sections of concrete fitted together, finish off the top of the exposed external wall of a parapet roof and shed rain Coping are bedded in a dpc of bituminous felt to improve their water resistance Copings should be wide enough o overhang the wall by at least 50mm The tops of the copings slope in one or two directions to shed rain Building Construction I Sofia Sebastian 6

Building Construction I Sofia Sebastian 7 Water proof roof finishes – Laying a bituminous felt roof Building Construction I Sofia Sebastian 7

Building Construction I Sofia Sebastian 8 Flat RC Roof - Water proof roof finishes 1. Bituminous felt – sheet material with a fibrous base soaked in bitumen. Usually laid on timber roofs 2. Mastic asphalt as laid on roof – is a mixture of graded limestone bonded with asphaltic cement to form water proof material that is plastic when heated. Mastic asphalt – material containing bitumen that is laid as a hot elastic covering. As it cools, it hardens to form a joint less cover that is usually put on concrete roofs. Building Construction I Sofia Sebastian 8

Building Construction I Sofia Sebastian 9 Insulated concrete flat roof detail Building Construction I Sofia Sebastian 9

Building Construction I Sofia Sebastian 10 Insulated metal roof detail Building Construction I Sofia Sebastian 10

Building Construction I Sofia Sebastian 11 Construction detail of an Insulated flat roof on a cavity wall Building Construction I Sofia Sebastian 11

Building Construction I Sofia Sebastian 12 Green roof detail Building Construction I Sofia Sebastian 12

Building Construction I Sofia Sebastian 13 Roof surface Building Construction I Sofia Sebastian 13