Port of Long Beach DARRIN LAMBRIGGER, P.E., CCM DIRECTOR, CONSTRUCTION MANAGEMENT DIVISION CONSTRUCTION MANAGEMENT ASSOCIATION OF AMERICA SOUTHERN CALIFORNIA CHAPTER PORT NIGHT– SEPTEMBER 27, 2018
Construction Management Division Leadership Team Cesar Larios Deputy Chief Harbor Engineer Middle Harbor Ramanjit Brar Assistant Director Lincoln Lo Deputy Chief Harbor Engineer Civic Center/Rail/CM Technology Adriana Ramirez Manager, Labor Compliance and Administration Peter Forsythe Deputy Chief Harbor Engineer Fire/Bldg/Land/On-Calls Vacant Deputy Chief Harbor Engineer Infrastructure Projects Rick Benson Chief Inspector
LEADING GATEWAY FOR U.S.-ASIA TRADE PORT OF LONG BEACH . LEADING GATEWAY FOR U.S.-ASIA TRADE
WORLD’S 10TH BUSIEST PORT COMPLEX PORT OF LONG BEACH PORT OF LOS ANGELES WORLD’S 10TH BUSIEST PORT COMPLEX *BASED ON 2016 CONTAINER CARGO VOLUMES
AMERICA’S 2ND BUSIEST SEAPORT $180 billion in cargo SUPPORTING 1 IN 8 JOBS IN LONG BEACH AND 300,000 REGIONAL JOBS
HIGHEST IN PORT HISTORY 7.5 MILLION TEUs 2017 2006 2007 2015 2014 2016 2013 2008 2010 2011 2012 2009
E-COMMERCE REVOLUTION
TODAY, CUSTOMERS EXPECT TO GET WHAT THEY WANT, WHEN THEY WANT IT AND WHERE THEY WANT IT.
Most direct BETWEEN ASIA AND MOST OF AMERICA CHICAGO SHANGHAI Most direct BETWEEN ASIA AND MOST OF AMERICA
BIG SHIP READINESS PIER A/SSA PIER C/SSA PIER T/TTI PIER E/LBCT 3 BERTHS 10 CRANES 50’ DOCKSIDE PIER C/SSA 1 BERTHS 3 CRANES 42’ DOCKSIDE PIER T/TTI READY FOR 20,000-TEU SHIPS BY 2020 3 BERTHS 14 CRANES 55’ DOCKSIDE PIER E/LBCT READY FOR 22,000-TEU SHIPS BY 2019 3 BERTHS 14 CRANES 55’ DOCKSIDE PIER G/ITS READY FOR 14,000-TEU SHIPS NEAR TERM 3 BERTHS 17 CRANES 52’ DOCKSIDE BIG SHIP READINESS PIER J/PCT READY FOR 18,000-TEU SHIPS NEAR TERM 5 BERTHS 14 CRANES 55’ DOCKSIDE
CONTAINER VESSELS 52 FT DRAFT
LIQUID BULK VESSEL DRAFT 70 ft.
$4 BILLION CAPITAL PROGRAM
$456.5 MILLION CAPITAL BUDGET FY2018 ($millions)
$709 MILLION DRAFT CAPITAL BUDGET FY2019 ($millions)
LONG BEACH CONTAINER TERMINAL State-of-the-Art, Greenest
= 10 FOOTBALL FIELDS! FINAL PHASE – Under construction
Investment in Rail Improvements $1 BILLION Investment in Rail Improvements
PIER B ON-DOCK RAIL SUPPORT FACILITY
NEW LANDMARK $1.467 Billion Budget
15% of U.S. Imports Cross by Truck BRIDGE REPLACEMENT 15% of U.S. Imports Cross by Truck
PREDICTABLE RELIABLE EFFICIENT FAST
CLEAN AIR ACTION PLAN
2035 ALL PORT TRUCKS ZERO EMISSIONS
ENVIRONMENTAL AND OPERATIONAL LEADERSHIP
Terminal Island Wye Rail Project Gerald Desmond Bridge Demolition NRG Intake Demolition Terminal Island Wye Rail Project Gerald Desmond Bridge Demolition Fireboat Station 20 Construction Material Inspection On-Call Pier B On-Dock Rail Support Facility www.polb.com “Contractor/Vendor” Tab “Future Work” Link
2018 Harbor Cup Welcome Home!
Director, CONSTRUCTION MANAGEMENT DIVISION DARRIN LAMBRIGGER Director, CONSTRUCTION MANAGEMENT DIVISION