EPA Public Meeting Dallas, Texas May 10, 2005

Slides:



Advertisements
Similar presentations
Soil Erosion.
Advertisements

WATER QUALITY ANALYSIS for ANTIDEGRADATION
SW101 The NPDES Industrial Storm Water Program. What Does the Industrial Program Cover? F Storm Water Discharges Associated with Industrial Activity l.
Final Construction Stormwater General Permit Issued November 16, 2005 Jeff Killelea Department of Ecology.
EPA CONSTRUCTION & DEVELOPMENT EFFLUENT LIMITATIONS GUIDELINES Tim Ryan, P.E. Water Resources Engineer Water Resources Engineer Wisconsin Department of.
1 Effluent Guidelines for Construction Greg Davis USEPA
A State’s Perspective of the EPA’s Effluent Limitations Guidelines 40 CFR Part 450 Jeffrey B. Shaver, PE, CPESC AASHTO Subcommittee On Design July 27,
Stormwater Pollution Prevention Plans
What is NPDES? “National Pollutant Discharge Elimination System”
Cameron County Conservation District. Chapter 102 Rules and Regulations  Erosion is natural, so what’s the deal?  Accelerated Erosion is not natural.
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
CHAPTER 102 Plain English Guide to the Erosion and Sediment Control (E&S) Regulations Fulton County Conservation District 216 N. Second Street, Suite 15.
Construction Storm Water Controls CET-3320 Hydrology & Hydraulics.
Chapter 102 Changes and Highlights Municipal Update Coordinating Permits.
Wes Marshall, P.E. University of Connecticut March 2007 CE 276 Site Design Chapter 10 – Soil Erosion & Sediment Control.
Building Green in Bowling Green
Env 247 Overview of Stormwater Management March 1, 2011.
CONSTRUCTION BEST MANAGEMENT PRACTICES (BMPs) CONSTRUCTION GUIDE TO CLEANER WATER Information compliments of: WaterWorks! WaterWorks! Center for Environmental.
BEING READY FOR AN INSPECTION No matter when the inspector shows up.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN DESIGN APPROACH- THE BASICS Issued May 2009.
AZPDES and Construction Sites Greg Wise Environmental Program Specialist Arizona Department of Environmental Quality (602)
Erosion Control/Damage Topic H. Erosion & Sentiment Control Defined by: – Environmental Regulations – State and federal laws – Standard specifications,
Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005.
Erosion Control on Construction Sites David Athey, PE Deputy Public Works Director, Engineering City of Atascadero.
1 ELEMENTS OF AN EFFECTIVE SEDIMENT CONTROL PLAN PLANNING APPROACH Issued May 2009 Level II: Introduction to Design Education and Certification for Persons.
Expedited Settlement Offer Worksheet Deficiencies Form
E&P STORM WATER OVERVIEW Domestic Onshore Energy E&P STORM WATER OVERVIEW Domestic Onshore Energy May 10, 2005.
Introduction to Construction General Permit Inspections.
Stormwater Permitting at Airports Julianne Rantala MPCA, Industrial Division.
A Review of the Hollis Stormwater Management Ordinance Todd H. Dresser, CHMM Cuoco & Cormier Engineering Associates.
Creating a Storm Water Pollution Prevention Plan For Construction Activities.
Module 1: Stormwater Permit Program Robert Pitt Department of Civil and Environmental Engineering University of Alabama Tuscaloosa, AL.
SMALL CONSTRUCTION STORMWATER PERMITTING. STORMWATER GENERAL PERMIT FOR SMALL CONSTRUCTION ACTIVITIES Construction activities regulated under this permit.
EPA’s Stormwater Rulemaking: How Potential Changes in the NPDES Stormwater Regulations Could Impact the Design of Stormwater Controls Rachel Herbert USEPA/OW/OWM/WPD.
Construction Stormwater Rules-2012 Rodney Hendrick, Ph. D. Louisiana Urban Stormwater Coalition.
MDOT Storm Water Management Plan Module 2: Best Management Practices
Stormwater and C.3 Overview Tom Dalziel, Assistant Manager Contra Costa Clean Water Program.
10/03/021 Stormwater Video-conference Department of Environmental Protection Stormwater Videoconference October 3, 2002.
 Storm Water Pollution Prevention Plan (SWPPP)  All dischargers over 1-acre must develop a SWPPP  6 major portions of every SWPPP Site Evaluation and.
New Development and Significant Development 12/21/20151 New Development & Significant Redevelopment.
SW101 Large and Small Construction Denise Hamilton, EPA Region 6 8 th Annual Region 6 MS4 Operators Conference June 26, 2006.
1 Common Issues on Site Re-certification Training For Level IA Fundamentals Certified Personnel Issued May 2009.
1 Structural Control Practices ©2002 Dr. Bradley C Paul.
Legislative Overview  This quick module outlines in more detail the background of the legal requirements.
Storm Water Pollution Prevention Plan Development Todd E. Hubmer PE WSB &
SWPPP: Stormwater Pollution Prevention Plan Creating/Implementing a Plan for Compliance.
1. Wolfeboro’s Tool Kit Implemented tools for water quality protection Municipal Watershed District Ground Water Protection Overlay District Steep Slope.
Pollution Control: For Field Office Construction Sites.
City of Clarksville Storm Water Management Manual Revisions 2014.
Celebrating 40 years of taking care of Missouri’s natural resources. Land Disturbance and the Department of Natural Resources Tina White.
MS4 & Construction Storm Water Permits
Municipal Separate Storm Sewer System (MS4) Permit
Ohio Department of Transportation
For Storm Water Discharges Associated with Construction Activity
Environmental Rule 327 IAC 15-5 to a General Permit
Supervisor, RIDEM RIPDES Permitting Program
Inspector Challenges.
Storm Water Pollution Prevention Plan Development
TPDES Construction Management at the City of Laredo
Stormwater Management Program
John Tinger U.S. EPA Region IX
Stormwater Pollution Prevention Plans
City of Marietta Land Development Permit Basics
INDOT Storm Water Management
Flow chart to determine whether coverage is required
TPDES Construction General Permit Compliance
MS4 = Municipal Separated Storm Sewer System
Stormwater Construction General Pemit (CGP) TXR150000
Erosion & Sediment Control Plan (ESCP)
Rule 5/6/13 Conversion to General Permits
Presentation transcript:

EPA Public Meeting Dallas, Texas May 10, 2005 Storm Water Discharges from Oil and Gas Related Construction Activities EPA Public Meeting Dallas, Texas May 10, 2005

Overview History Rule deferral rationale Regulatory options EPA analysis Q&A

Chronology 1987 Water Quality Act - 2 phase program to control storm water - Oil and gas storm water exempt 1990 Storm Water Phase I 1999 Storm Water Phase II March 10, 2003 Deferral Rule March 9, 2005 September, 2005 Notice of Proposed Rule Making June 12, 2006 Final Action Required

Oil and Gas Exemption CWA §402(l)(2) - The Administrator shall not require a permit … for discharges of stormwater runoff from … oil and gas exploration, production, processing, or treatment operations or transmission facilities, composed entirely of flows which are from conveyances or systems of conveyances … used for collecting and conveying precipitation runoff and which are not contaminated … Construction activity, includes clearing, grading, and excavating Since 1992, EPA has considered construction activity at oil and gas sites to require permit coverage – i.e., not considered to fall under exemption.

EPA as NPDES Permitting Authority Construction and Industrial Federal Facilities Oil and Gas Puerto Rico Virgin Islands Tribes Other Territories

2003 Facts and Figures ~28,000 new well sites in 29 states EPA administers the Storm Water program in AK*, TX, OK, and NM: 48% of the wells are drilled 66% of estimated compliance costs are accrued Permit addresses ESA and NHPA * Vast majority of AK sites are >5 acres and covered by Phase I regulations.

Deferral Rationale Phase II Rule determined that few if any oil and gas sites exist between 1 and 5 acres EPA subsequently deferred requirement for small oil and gas sites to obtain permit coverage EPA performing: Economic impact analysis, including cost/benefit analysis BMP review Industry Standard Operating Procedures BLM Gold Book Guidelines State prescribed BMPs Analysis of regulatory options

Regulatory Options EPA is currently evaluating 2 options (against the baseline) for regulating small oil and gas construction activity: (Baseline) - Regulate consistent with Phase II Rule (Option 1) – Create New Waiver (Option 2) - Non-permitting program [CWA 402(p)(6)]

Regulatory Options (Baseline) Baseline Approach: Requirements include: Coverage under Construction General Permit Develop site-specific Storm Water Pollution Prevention Plan (SWPPP) Perform routine inspections ESA/NHPA considerations (for EPA permits)

Baseline Approach GAO-05-240, February 2005

Baseline – Construction SWPPP Site Description Controls to Reduce Pollutants Erosion and Sediment Controls Stabilization Practices Storm Water Management Maintenance Inspections

Baseline- SWPPP: Site Description Description of construction activity Sequence of major soil disturbing events Total and disturbed area (acreage) Storm water discharges (location) Site map Storm water controls (location) Receiving waters (name, location) Endangered species; historic preservation

Baseline- SWPPP: Erosion and Sediment Controls Properly select and install controls to: Minimize erosion Retain sediment on-site Remove any sediment that accumulated off-site Remove sediment from sediment traps Prevent litter from entering streams

Baseline- SWPPP: Stabilization Practices Temporary Seeding Permanent Seeding Mulching Sod Stabilization Vegetative Buffer Strips Tree Preservation Contouring and Protecting Sensitive Areas

Baseline- SWPPP: Structural Controls Earth Dike Subsurface Drain Silt Fence Pipe Slope Drain Drainage Swales Temporary Storm Drain Diversion Sediment Traps Storm Drain Inlet Protection Check Dams Rock Outlet Protection Level Spreader

Maintenance and Inspections BMPs must be maintained in effective operating condition Any repairs must be performed before next anticipated storm event, if possible. Inspect at least every 14 calendar days and within 24 hours after any storm event of 0.5 inches or greater (or every 7 days) until permit coverage terminated.

Regulatory Option #1- Waiver Sites <5 acres would be waived from permit coverage under certain conditions Sites 5 acres and above would still be required to obtain permit coverage Possible waiver eligibility requirements: Short term (<30 days) construction Proximity to water body Slope, region, and other site-specific considerations BMP implementation

Regulatory Option #2- Non-Permitting NPDES Program Comprehensive program under CWA section 402(p)(6) Develop a program for O&G construction activity Likely similar BMP requirements as baseline and Option 1 Evaluate legal authorities and responsibilities More information to be added when provided by EPA.

Economic Analysis: Purpose Evaluate the costs and benefits of the requirements under the Phase II Storm Water Rule Follow analytical approach using relevant data from the Phase II analysis (1998). Examine the costs and benefits for 3 rulemaking options: Baseline (expiration of deferral after 6/12/06) Waiver Non-permitting program under CWA 402(p)(6)

Economic Analysis: Impacts Direct costs Notice of Intent SWPPPs BMPs Potential ESA & NHPA Considerations Indirect costs Revenue delay Forgone lease bonus payments Idle rig contract payments Project cancellation

Next Steps Questions? Gather additional information Complete Economic Analysis Notice of Proposed Rulemaking (9/05) Comment period Final Rulemaking (6/06) We also added a slides for next steps if you wish to use it. Questions?