THE ROLE OF THE PLANSET IN CONTRACT DOCUMENTS

Slides:



Advertisements
Similar presentations
Audit. Types Scheduled Audits Programmatic Assurance >Field Monitoring, Annual Reviews Reviews of Partners Financial Records > Spot Checks > Special Audits.
Advertisements

Metro Muncipal Agreement Program
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
Construction Contracting
Presented by: Fouad Al-Malazi ID No.: Managing Construction Contracts By Robert D. Gilbreath Chapter 1 CONSTRUCTION CONTRACTS: Roles and Relationships.
CON 4003 CVE 4073/5073 The Estimating Process Prof. Ralph V. Locurcio, PE.
Construction Cost Estimating Class #2: Bidding Process Prof. Ralph V. Locurcio, PE.
NOTE TAKING One method of taking notes is called Cornell Notes. Divide the paper into 3 sections.
Overview of the Federal Aid Process for Transportation Projects.
CONSTRUCTION QUALITY MANAGEMENT CI Seminar Los Angeles January 19, 2007.
Standards of Practice Course
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT August 21, 2014.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
MURK Presented By Awni Alsous, MURK Engineer 2010.
A Virtual Seminar. Purpose of This Workshop: Informed Decisions.
Construction Construction is a discipline. It is a combination of Art Science S.W. Nunnally, Construction Methods and Management, 7th Edition, Pearson.
Building Your Response Team AND GUIDING THEM TOWARD A SUCCESSFUL SITE VISIT.
Texas Turnpike Authority Division AASHTO Right of Way & Utilities Committee Conference Wednesday – April 22, 2009.
Topic1b: Project Life Cycle
IDM Chapter 104 Utility Coordination Joe Gundersen Senior Utility Engineer, INDOT November 19, 2013.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Roles & Responsibilities Project Biologist.
Genesee County Road Commission Fred Peivandi, P.E. County Highway Engineer MTPA July 15, 2011 TIP Project Administration.
CONSTRUCTION CONTRACTS PRIME CONTRACTS Format and Major Components CHAPTER - 4.
OREGON DEPARTMENT OF TRANSPORTATION Practical Design Decision Matrix.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Mass Highway Department (MHD) Design Process Anticipate possible use of MHD funds Anticipate possible use of MHD funds New Design Guide for Project Development.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specification-Show how project.
We know partnerships. NCPPP P CONNECT BOOTCAMP July 20, 2015 Barney Allison, Esq.
1 PS&E Plans, Specifications and Estimate. 2 Contract Letting Plans-Show what is being built Plans-Show what is being built Specifications-Show how project.
Britannia Village Flood Control Project Report Back to RVCA Board of Directors – Dec 16, 2010 after attendance at Community Meeting of November 30, 2010.
Project Delivery Performance Improvement Report to the Oregon Transportation Commission Hal Gard, Technical Services, Geo-Environmental Dee Jones, Technical.
The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.
Engineering a Good Project Drew Seaman. Engineering: the work of designing and creating large structures (such as roads and bridges) or new products or.
Request For Proposals. Request for Proposals Book 1 Contract Book 2 Project Requirements Book 3 Applicable Standards Reference Information Documents (RID)
2010 Environmental Change Orders. Tom Harris, PE Field Engineer Division of Construction Management.
A New Paradigm for Utility Coordination Kenny Franklin VP of SUE Development Blood Hound.
Stephanie Norris Partner, Purcell ‘Getting Building Work Done’ HRBA/Purcell event 09 June 2016.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
RISK MODULE 7. Risk Identification and management of project risks throughout the life of the project.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Municipal Class Environmental Assessment
Subrecipient Monitoring
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Design process.
Transportation Engineering Business Development Workshop Department M
Project Project Objective Component 1 Component 2 Component n …
BIM EXECUTION PLANNING PROCESS
Technical Specifications & Employer's Requirements
Huntington Convention Center of Cleveland &
Welcome Screen 2013 Educational Session 1 What is New With the Consultant Selection Process FAA AC 150/ e CHANGE 1 Jon Faucher Vice President.
Technical Scope of Work
RTK Contractor Management Process Book
Winchester Lift Station Odor Control Project
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
PLANS, SPECIFICATIONS AND ESTIMATES
9/18/2018 Bids CONTRACTING Khamis…..
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Pre-contract Planning and Practice
BIM EXECUTION PLANNING PROCESS
Administrator of Construction Todd Wilson Senior Project Manager
Technical Scope of Work
CVE 4070 Construction Engineering
Design process.
Introduction DEFINATION :-
Controlling Project Cost and Schedule
Relationship between World Bank and Romanian EA requirements
Environmental Commitments
A Paradigm for Utility Coordination
Allocation of Risk Arising from Subsurface Conditions
Athletic Field Improvements
Presentation transcript:

THE ROLE OF THE PLANSET IN CONTRACT DOCUMENTS APWA STREETS & TECHNOLOGY CONFERENCE APRIL, 19, 2017

How Do Plans Fit Into Contract Documents? Definition of Contract Documents Relevance of Plans in Contract Documents Precedence of Plans in Contract Documents

Preliminary Steps in Preparing Plans Envision the Project Control Surveys – Horizontal & Vertical Utility Investigations/Coordination Field Reviews Geotechnical Investigations Environmental Documentation Permit Requirements Compliance with Mitigation Plans

Plans, Specifications & Estimates Plan Preparation Requirements/Layout - Preliminary – 30%, 60% & 90% - Final – 100% Relationship of Plans to Specifications, General & Special Provisions Public & Private Contracts Engineer’s Estimate of Probable Construction Cost Quality Control

Consultation During Construction Clarify Intent of Plans Provide Technical Consultation As-Built Drawing Recordation Liability Considerations

Key Points to Remember Clearly Defined PS&E Package Put Yourself in the Contractor’s Place Avoid Redundancy Utilize Standard Plans & Specs Constructability Reviews Partnering for Success