EWRC-RAE MUTUAL PROJECTS

Slides:



Advertisements
Similar presentations
1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
Advertisements

Implementation of the Network Code Balancing in the Netherlands Marcel Neef 28 November 2013.
The role of ACER In the Regional Initiatives Steve Gordon Head Of the Gas Department North West Regional Initiatives 2011.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
How the Implementation of the Network Code Does Help Infrastructure Users Vasile FLOREA Director of Commercial Balancing SNTGN TRANSGAZ SA Medias.
1 South Gas Regional Initiative Work Plan Raúl Yunta Huete, South GRI Chairman 20 th Madrid Forum Madrid, 26 September 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
EUROPEAN COMMISSION Heinrich Hick, DG TREN C 2 3rd IEM Package and relevance of GRI GRI NW stakeholder Conference, London, 14 November 2008.
1 The regulators’ view on the Central West REM: Emphasis on the completion of existing initiatives Presentation for the Mini-Forum 20 June 2006.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 1 October, 2010 Jurmala ACER and regulatory empowerment.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
European Developments Transmission Workgroup 3 rd May 2012.
1 XVI Madrid Forum, 29 May 2009 XVI Madrid Forum Jose Sierra Madrid, 29 May 2009 Chair, RIG ERGEG Gas Regional Initiative Update & Progress.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Gas Regional Initiative South South-East
Geert Van Hauwermeiren Workshop, Ljubljana, 13 Sept 2011
Enagás and REN Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
19th GRI Coordination Group meeting
21st IG Meeting South Gas Regional Initiative
Capacity allocation in natural gas transmission networks Pilot framework guideline - Public consultation results and new content of guidelines - Dr.
New transparency guidelines
Enagás and TIGF Coordinated implementation of the Network Code on Capacity Allocation Mechanisms 15 November th SG meeting.
6/3/2018 Second ACER-ENTSOG Report on the status of the implementation of the Balancing Network Code Dennis Hesseling Head of the Gas Department Bucharest,
EU Tariffs Code Update Based on Refined Draft as of 30th October
GRI-S : Infrastructures The Union list of projects of common interest
Harmonization of Cross Border Transmission Tariffs between
20th April 2016 Teleconference
26th IG meeting 23th January 2014
Gas Regional Initiative South South-East CAM Implementation Group
43th IG Meeting South Gas Regional Initiative
2009 TSO Transparency Gas Regional Initiative North-West
Background and Process
ERGEG GRI South South East – , Maribor
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
2°Questionnaire for the assessment of the main features of
STATE ENERGY AND WATER REGULATORY COMMISSION
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
Roadmap for the early implementation of the CAM Network Code (CAM Roadmap) Main achievements to date and lessons learned Violeta Bescós, Market Adviser.
20th April 2016 Teleconference
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
26th February 2015 Teleconference
37th IG Meeting South Gas Regional Initiative
2016 and beyond Ukrtransgaz.
Transparency in the Energy Community Contracting Parties
20th April 2016 Teleconference
29th April 2014 Teleconference
18th July 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
24th January 2017 Teleconference
37th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, REN and TIGF
Implementation of the Network Code Balancing in the Netherlands
2°Questionnaire for the assessment of the main features of
Gas Regional Initiative Update on progress and latest developments
26th February 2015 Teleconference
Implementation of the Network Codes: ACER monitoring and SSE GRI state of play Dennis Hesseling, Riccardo Galletta, ACER 21st Stakeholder Group meeting,
DRAFT DG TREN Staff Working Paper on LNG
2/23/2019 Second ACER-ENTSOG Report on the status of the implementation of the Balancing Network Code Dennis Hesseling Head of the Gas Department Bucharest,
12th December 2014 Teleconference
Gas Regional Initiative South South-East
EWRC-RAE MUTUAL PROJECTS
EWRC-RAE MUTUAL PROJECTS
Gas Regional Initiative South South-East CAM Implementation Group
Gas Regional Initiative South South-East
Presentation transcript:

EWRC-RAE MUTUAL PROJECTS ENERGY AND WATER REGULATORY COMMISSION EWRC-RAE MUTUAL PROJECTS PROGRESS UPDATE IN CAM AND BAL NC IMPLEMENTATION

ENERGY AND WATER REGULATORY COMMISSION HISTORY The two common Bulgaria-Greece projects were introduced in SEE GRI working plan in 2015 - 2018. PROJECT IV: Common capacity allocation procedures and bundling of capacity products between Bulgaria and Greece. PROJECT VI : Harmonization of the procedure for the exchange of the Interim Measures Reports between Greek and Bulgarian TSOs and NRAs.

Main purposes of the projects ENERGY AND WATER REGULATORY COMMISSION Main purposes of the projects The projects are aimed to implement the CAM and BAL NC at the common GR-BG interconnection point (Kulata-Sidirokastro). Continuation of common useful cooperation between the Bulgarian and Greek NRAs (EWRC and RAE) and relevant TSOs (Bulgartransgaz and DESFA).

CAM NC finalized actions ENERGY AND WATER REGULATORY COMMISSION CAM NC finalized actions Both TSOs have decided to choose Regional Booking Platform (RBP). Joint method for the optimization of the technical capacity, including the assessment of the pressure commitments, demand/supply scenarios. Definition of bundled capacity products on both sides of the IP.

CAM NC finalized actions ENERGY AND WATER REGULATORY COMMISSION CAM NC finalized actions Definition of unbundled capacity products on both sides of the IP. Bulgartransgaz and DESFA signed an Interconnection agreement in 25 of June 2016. This provides for possibility for reverse virtual gas flow (backhole) for the users on the territory of Bulgaria.

ENERGY AND WATER REGULATORY COMMISSION CAM ACTIONS UNDER WAY Definition of interruptible capacity products at the IP. Joint decision on minimum interruption lead times. Establishment of a communication procedure between the TSOs concerning the notification of capacity interruption.

ENERGY AND WATER REGULATORY COMMISSION CAM ACTIONS UNDER WAY Establishment of a joint procedure for the definition of interruption sequence. Definition of data exchange formats. Alignment of information systems. Definition of communication procedures to be developed for the implementation of CAM.

ENERGY AND WATER REGULATORY COMMISSION BAL NC IMPLEMENTATION Development of the draft Interim Measures Report by each TSO, as foreseen by article 46 of BAL NC. Beginning of Public Consultation period, during which, each TSO shall communicate the draft report under consultation to the stakeholders (adjacent TSOs and market participants).

ENERGY AND WATER REGULATORY COMMISSION BAL NC IMPLEMENTATION Each TSO having taken into consideration possible comments from the stakeholders (adjacent TSOs and market participants) proceeds to submit to the respective NRA the complete Interim Measures Report. Consultation between NRAs on each TSO complete annual interim measure report. Each NRA approves the report according to the provisions of BAL NC.

BAL NC IMPLEMENTATION IN BULGARIA ENERGY AND WATER REGULATORY COMMISSION BAL NC IMPLEMENTATION IN BULGARIA Energy and Water Regulatory Commission has approved a report on the application of interim measures developed by Bulgartransgaz in accordance with Art. 46 of Regulation (EU) №312 / 2014 of 26 March 2014 laying down the Network code for balancing the gas transmission networks.

BAL NC IMPLEMENTATION IN BULGARIA ENERGY AND WATER REGULATORY COMMISSION BAL NC IMPLEMENTATION IN BULGARIA The following interim measures approved: An alternative to a balancing platform: - Bulgartransgaz has announced non-discriminatory and transparent procedures for purchase of gas for balancing in accordance with Art.8 of the Regulation; - Linepack (within acceptable tolerance); - Underground gas storage „Chiren“. Interim imbalance charge Tolerances +/- 5%

ENERGY AND WATER REGULATORY COMMISSION BAL NC IMPLEMENTATION The exchange of the interim measures by Bulgartransgaz and DESFA will help to harmonize balancing schemes applied in Bulgaria and Greece and lead to market integration and efficient gas market operation.

THANK YOU FOR YOUR ATTANTION! ENERGY AND WATER REGULATORY COMMISSION THANK YOU FOR YOUR ATTANTION! Contact: Victoria Jermanova – Chief expert „Prices,licence and markets – natural gas “department „Natural gas “division Energy and water regulatory commission (EWRC) Bulgaria E-mail:vjermanova@dker.bg Victoria Jermanova Chief expert “ Natural gas“ Division EWRC e-mail:vjermanova@dker.bg