Project Planning Please construct Gantt Charts based on… Today is

Slides:



Advertisements
Similar presentations
Gantt Chart.
Advertisements

Project Management System SharePoint Application Designed for 2010, 2013, Office365.
CPA A house is to have new carpets fitted throughout. The work involved has been divided into a number of tasks, as shown in the table.
ASSIGNMENT 1 Model Answers. Question 1 Q1) Consider building a garden shed project, which involves designing the shed, figuring out what materials are.
This section of our subject requires you to manage a project in which you will plan, design and develop a podcast of an interview with the designer of.
Mary Lou Maher University DECO2005, Semester 2, 2005 Project Management.
Project Management The Gantt Chart. What is a Gantt Chart? Gantt charts are a type of bar chart used to monitor the progress of a project. Each element.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 03.
SchedulingProducingControllingSchedulingProducingControlling.
The West London Free School Palingswick House Update.
3/25 4/2 4/9 4/16 Community (Rachael) Identify Dataset Questions for Peer Interviews Connect with Students / Surveys Genre Analysis Report Formulate Suggestion.
A Division of Broadway Furniture Group (212) Complete Office buildout including Glass Walls, Carpet, Wiring, Furniture and Installation.
TextMonTuesWedThursFriSatSun Text example GANTT CHARTS Example text Text.
Unit 9.2_Lesson 2_CD Resource 2f_Plenary Gantt charts From the Gantt Chart answer the question.
2009 CDBG/CHIP Recipients’ Workshop Project Interface with DCA Basic procedures for communicating with DCA on project (unit by unit) basis.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 04.
NOTE: REFERENCE PROJECT MANUAL DATED 12/20/14 FOR THE BALANCE OF PROJECT REQUIREMENTS & SPECIFICATIONS (THIS NOTE APPLIES TO ALL PHOTO SHEETS). PHOTO.
Gantt chart A graphical representation of the duration of tasks against the progression of time. Used for effective time management Lays out the order.
Actual Site Photo Price List Type Of VillasSuper AreaC.L.P 2 bhk (100 sq.yard)1050(sq.feet) bhk (200 sq.yard)1550(sq.feet) At.
PRJ566 Project Planning & Management Dependencies, Network Diagrams & Critical Path.
Monthly progress report So far we have completed the following:  weighted decision matrix  scope statement  Business case analysis  team contract 
GROUND ZERO. The condition of the old factory was bad and worse, chaos and unorganization a daily agenda. Old factory.
Project: Renovation Works at Ricci Hall at 93 Pok Fu Lam Road C Sub-basement Level VIEW 5 VIEW 3 VIEW 4 VIEW 2 VIEW 1 VIEW 6 PROGRESS PHOTO REPORT - 02.
Gigabit Ethernet PMD Opto-Link, Inc. – Status Report 7 Andrew Meyerson March 24, 2005.
Buy Trucks in Greenville NC
Tools to Help  Product flow Dependencies and relationships of deliverables  Work breakdown structure The parts  PERT charts Program Evaluation and.
Project Management & Project Management Software
Network analysis Homework:
Call For Columbia Mobile Homes SC
Prepared by Kim Randall Development Officer Hastoe House Association
Gantt Chart Presentation Name Course Name
PERT & GANTT CHARTS An Introduction.
Stepping stones Equipment
Gantt Chart Project Timeline
Furniture Liquidators -
Progress Charts.
Project management.
The UK Tier 1 Entrepreneur Visa and the UK Representative of Overseas Business Visa - SmartMove2UK
Week Today SECTION 1 Sub-task Sub-task 2
GANTT CHART Text Text Example
GANTT CHARTS Example Example Example Example text Tasks Example 1
(b) (ii) Project Plan.
May Jun Jul Aug Sep Oct Nov Dec Material Available
ENGINEERING MANAGEMENT (GE 404)
Today 8 days 24 days 34 days 23 days 35 days 31 days May Jun
ENGINEERING MANAGEMENT (GE 404)



Team member1 Team member2 Team member3 Team member4 17 September 2009

Tools for Visualization
Project Name – ID # 7/1/2009 Current Project Status Project Issues
This Presentation Pack is brought to you by
Gantt Chart.
Project Management Scenario Overview


Lecture 7 PROJECT SCHEDULING Ferdinand Fassa.
GANTT CHART can be used for scheduling generic resources as well as project management. They can also be used for scheduling production processes and.
Industrialization & The Gilded Age
Progress Report (October 2 - 9, 2002)


Label: Horizon, Vanishing Point, Vertical, Horizontal
Manufacturing Production Planning

Network analysis Homework:

Pentagon Chart Enter your subheadline here Description 1 Description 2
Presentation transcript:

Project Planning Please construct Gantt Charts based on… Today is 13 Sep 2018 Project Planning Please construct Gantt Charts based on… Task Description Responsible Start End Dependency Progress 101 Confirm the order for floor finishing Alex 3/9/2018 Nil 100% completed 102 Floor finishing: replace the existing tile by wooden strips Kwong Kee 4/9/2018 17/9/2018 revised 60% completed DELAYED 201 Confirm the order for tailor-made wooden furniture 202 Factory built: ordered wooden furniture built in factory Ming Wah 10/9/2018 301 Delivery of wooden furniture SF courier 18/9/2018 20/9/2018 102, 202 Not yet started 302 On-site wooden work: touch-up wooden furniture after delivery 21/9/2018 24/9/2018

Task 102: Floor Finishing (DELAYED) Today is 13 Sep 2018 Gantt Charts September 2018 3/9 – 7/9 8/9 – 9/9 10/9 – 14/9 15/9 – 16/9 17/9 – 21/9 22/9 – 23/9 24/9 – 28/9 Task 101: Confirm Order of Floor Finishing Task 102: Floor Finishing (DELAYED) Task 201: Confirm Order of Wooden Furniture Task 202: Factory Built of Wooden Furniture Task 301: Delivery Task 302: On-site Work