Water Quality Rulemaking in Response to S.L

Slides:



Advertisements
Similar presentations
1 Shale Gas Development and Production Activities Understanding Air Quality Impacts Mike Abraczinskas, Deputy Director North Carolina Division of Air Quality.
Advertisements

1 Project Plan for Baseline Ambient Air Monitoring near Potential Hydraulic Fracturing Zones in Lee County, NC Mike Abraczinskas, Deputy Director North.
Technical Requirements for Site Remediation Backbone of New Jerseys Site Remediation Program.
Natural Gas Drilling Activities - A State Perspective Ryan Benefield, P.E. Deputy Director, Arkansas Department of Environmental Quality
Environmental Regulation and Hydraulic Fracturing in California
1 Hydraulic Fracturing Regulatory Processes in Louisiana James H. Welsh Commissioner of Conservation.
EMC Review of Groundwater Corrective Action and Compliance Boundary Rules EVAN KANE NC DIVISION OF WATER RESOURCES.
GAS DRILLING & HYDRAULIC FRACTURING In the Tidewater Region Photo credit: R.W. Dawson.
SHALE PLAYS IN THE INTERMOUNTAIN WEST: LEGAL AND POLICY ISSUES Development of Shale: Water Resource Concerns & Policy Considerations Katy Dunlap, Esq.
Davis Graham & Stubbs LLP DGSLAW.COM Dave Neslin Davis Graham & Stubbs LLP Former Director of the Colorado Oil & Gas Conservation Commission Environmental.
Michael A. Skiffington Program Support Manager Virginia Department of Mines, Minerals and Energy W&M ELPR Spring Symposium Williamsburg, VA – March 28,
Virginia Department of Mines, Minerals and Energy
1 An Assessment of Marcellus Shale Environmental Issues in West Virginia By: David M. Flannery Kathy G. Beckett Jackson Kelly PLLC Presented at: Marcellus.
New Stormwater Regulations “C.3” Provisions in effect Feb. 15, 2005.
DEVELOPMENT OF THE HYDRAULIC FRACTURING REGULATIONS FOR NEVADA PRESENTATION TO MINING OVERSIGHT AND ACCOUNTABILITY COMMISSION ( MOAC) September 24, 2014.
Michael A. Skiffington Program Support Manager Virginia Department of Mines, Minerals and Energy Regulatory Advisory Panel – Meeting #5 Dahlgren, VA –
Adem.alabama.gov ADEM Land Division Update Chip Crockett Chief, Industrial Hazardous Waste Branch Air & Waste Management Association Southern Section Pine.
Ch WAC Geologic Sequestration of Carbon dioxide John Stormon Hydrogeologist Washington Department of Ecology Seattle, WA October.
1 Shale Gas Development/Production Activities and Air Quality Mike Abraczinskas, Deputy Director North Carolina Division of Air Quality Shale Gas Development/Production.
W w w. j a c k s o n k e l l y. c o m Kathy G. Beckett, Esquire 500 Lee Street East, Suite 1600, Charleston, WV Phone: Fax:
NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES Pete Doorn Special Remediation Branch Superfund Section Division of Waste Management
Water Quality Rulemaking in Response to S.L
David K. Paylor Virginia State Board of Health March 17, 2016.
North Carolina Department of Environment and Natural Resources 2013 Environmental Legislation Trina Matta and Layla Cummings North Carolina Department.
RICK COOPER DIRECTOR OF THE DIVISION OF GAS AND OIL VIRGINIA DEPARTMENT OF MINES, MINERALS AND ENERGY Gas and Oil Well Drilling Requirements for the Tidewater.
Overview of the NC Mining and Energy Commission Presented to the Environmental Management Commission January 10, 2013 Presented by: Tracy E. Davis, PE,
Regulating Shale Gas Well Development in New York State Libby Ford, QEP Sr. Environmental Health Engineer * Photo from
Evan Kane, DWR Ken Pickle, DEMLR Jon RisGAARD, DWR
Department of Environmental Quality
Department of Environmental Quality
Hydraulic Fracturing in Virginia
Water Quality Division Updates
An Update on DENR’s Shale Gas Study
Jon Risgaard, Wastewater Branch Rick Bolich, Raleigh Regional Office
Final Rulemaking Nonattainment Source Review 25 Pa. Code, Chapter 121
State and Local Regulation in Oil & Gas
Division of Waste Management
July 13, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
September 8, 2016 Department of Environmental Quality Proposed Amendments to UST Rules 15A NCAC 02N and 02O Ruth Strauss.
Regulating Injection and Fracking In Oil & Gas Operations
Arsenic Acceptable Ambient Level Revision
Environmental Management Commission July 13, 2017 Jeff Manning, DWR
Natural Gas A Maryland Perspective
Department of Environmental Quality
Department of Environmental Quality
Groundwater and Waste Management Committee November 9, 2016
Department of Environmental Quality
Department of Environmental Quality
Department of Environmental Quality
Wastes from Oil & Gas Extraction Activities - All wastes prohibited by comprehensive ordinances passed by 49 CT towns & cities & 5 NY County Legislatures.
Rulemaking and Readoption of 15A NCAC 02T .1500
Julie Woosley, Division of Waste Management
Department of Environmental Quality
Report of Proceedings Surface Water Quality Standards Triennial Review Environmental Management Commission November 13, 2014 Steve Tedder – EMC Hearing.
Evan Kane Division of Water Resources
Temporary Rulemaking for 15A NCAC 02L Section .0400
Department of Environmental Quality
Water Quality Rulemaking in Response to Senate Bill 820
Department of Environmental Quality Scott Bullock
Committee Update: Review of Groundwater Standards/IMACs
Julie Woosley, Division of Waste Management
Department of Environmental Quality
Dr. Jim Thomas Desert Research Institute
Department of Environmental Quality
Environmental Management Commission, March 9, 2017
Regulatory Reform Act (SL ) Periodic review and expiration of existing rules NC Environmental Management Commission March 13, 2014 Jeff Manning.
Julie Woosley, Division of Waste Management
Environmental Management Commission January 2014
Wastewater Permitting Updates
Wastewater Permitting Updates
Presentation transcript:

Water Quality Rulemaking in Response to S.L. 2012-143

Background - Location From Reid and Milici. 2008. “Hydrocarbon Source Rocks in the Deep River and Dan River Triassic Basins, North Carolina”

Technically Recoverable Undiscovered Unconventional Resources Background - Volume Technically Recoverable Undiscovered Unconventional Resources Assessment Unit Natural Gas (mean, BCFG) Natural Gas Liquids (mean, MMBNGL) NC Triassic Basins1 1,709 83 Marcellus Shale (PA, NY, WVa, OH)2 84,198 3,379 Barnett Shale (TX)3 26,228 1,049 Sources: (1) USGS Fact Sheet 2012-3075 (2) USGS Fact Sheet 2011-3092 BCFG: billion cubic feet of gas (3) USGS Fact Sheet 2004-3022 MMBNGL: million barrels of natural gas liquids

Major Provisions of S.L. 2012-143 Creates Mining & Energy Commission Authorizes hydraulic fracturing and horizontal drilling Prohibits issuance of drilling permits until legislature acts Updates statutory regulations of oil & gas activities Directs EMC, Commission for Public Health, and Mining & Energy Commission to adopt necessary rules by October 1, 2014

Mining & Energy Commission Rulemaking Responsibilities Drilling permit application requirements Baseline sampling rules Oil and gas well construction standards Siting standards for oil & gas wells and other production infrastructure Limits on water use and establishment of water management plans Management of wastes (onsite)

Mining & Energy Commission Rulemaking Responsibilities (cont’d) Prohibitions on use of certain chemicals Disclosure of chemicals used Blowout and spill prevention and response Well closure and site reclamation

EMC Rulemaking Responsibilities Stormwater control for oil & gas exploration and development sites; Regulation of toxic air emissions from drilling operations; “…matters within its jurisdiction that allow for and regulate horizontal drilling and hydraulic fracturing for the purpose of oil and gas exploration and development.”

Water Quality Rule Development Process for SL 2012-143 May 2012 DENR Study Report Staff review of all EMC water quality rules Staff level coordination with DEMLR staff & MEC members Rules presented to MEC Oil & Gas Stakeholder Group Participation in MEC Coordinated Permitting Study Group Presentation to MEC’s November 2013 meeting March 2014 EMC Water Quality Committee review & action Tentative EMC Information Item - November 2013

Recommended EMC Water Quality Rule Revisions Adopt: 15A NCAC 2H .1030 – New Stormwater rule Amend: 15A NCAC 2T – Wastes not discharged to surface waters 2T .0113 – Permitting by Regulation 2T .1001 – Closed-loop recycle 2T .1501 – Soil Remediation 15A NCAC 2U – Reclaimed Water 2U .0113 - Permitting by Regulation Tentative EMC Information Item - November 2013

Stormwater Oil & Gas operations exempt from federal NPDES stormwater requirements until after a release or water quality standard violation State stormwater regulations recommended by STRONGER and DENR study; required by SL 2012-143

Stormwater Stormwater discharges and major pollutant concerns: Initial grading – sediment Initial drilling – sediment, trace hydrocarbons, brines Production, stimulation, and maintenance – sediment, peak flow, brines, residuals

Stormwater

Stormwater & Spills

New Stormwater Rule (15A NCAC 2H .1030) Site stabilization: similar to the current NPDES Construction Stormwater permit elements Structural BMPs: extend existing rules in 15A NCAC 2H .1000

New Stormwater Rule (15A NCAC 2H .1030) Design Rainfall criteria: Control and treat runoff from the 1” rainfall OR Control and treat the difference in pre- and post- development runoff for the 90th percentile storm

Non-Discharge Rule Amendments (15A NCAC 2T) 2T .0113 – Permitting by Regulation On-site disposal of drilling muds, cuttings and produced water should not be permitted by rule

Non-Discharge Rule Amendments (15A NCAC 2T) 2T .1001 – Closed-loop recycle Clarify that reuse of flowback water or drilling fluids is not a “closed-loop recycle system” 2T .1501 – Soil Remediation Clarify that soil remediation permits are not appropriate for spreading of oil and gas drilling muds and cuttings

Reclaimed Water Rule Amendments (15A NCAC 2U) 2U .0113 – Permitting by Regulation Reuse of flowback water in oil and gas operations should be permitted by rule under conditions approved by DEMLR

Executive Orders, Certifications & Fiscal Notes No fiscal note required OSBM certification per G.S. 150B-19.1(h) required to publish in register (pending)

Rulemaking Targets EMC Action - send rules to public comment: May 8, 2014 NC Register filing deadline: May 9, 2014 Start of Comment period: June 2, 2014 Public Hearing: July 1, 2014, (Sanford - Wicker Center) End Comment period: August 1, 2014 Adoption: by October 1, 2014

For More Information Evan Kane, Groundwater Planning & Environmental Review Branch Supervisor Division of Water Resources 919-807-6461 evan.kane@ncdenr.gov Jon Risgaard, Non-Discharge Unit Supervisor 919-807-6458 jon.risgaard@ncdenr.gov Ken Pickle, Stormwater Program Engineer Division of Energy, Mineral, and Land Resources 919-807-6376 ken.pickle@ncdenr.gov