ابزار مدیریت ریسک : Risky Project

Slides:



Advertisements
Similar presentations
Project Management Techniques and tools Move mouse over arrow to enter presentation End Show.
Advertisements

RiskyProject Project Risk Management Software
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
CS3500 Software Engineering Project Management (1) In 1986 one well-known software engineer (Tom DeMarco) made the simple but important observation: “You.
Intaver Institute Inc. Comparison of RiskyProject Professional vs Lite versions Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved SECTION 12.1 PROJECT MANAGEMENT.
What is a project? Project Management Institute definition
A tutorial on MS Project James Burns. Outline  Setting up MS Project  Defining Tasks (activity definition)  Activity Subordination (WBS)  Activity.
Project Management March 9, 2001 Dr. Richard Chung Dept. Chemical & Materials Engineering San Jose State University.
Project Portfolio Management Technology Analysis Russ Hopler IBM Rational Software.
Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada
Hotel Management Point of Sale System Adelyn T. Balubal Rosemarielyn C. Dacuyan John Carlo R. Iringan Jennilyn B. Moratalla Jake T. Revelo.
Gantt and PERT charts. Representing and Scheduling Project Plans Gantt Charts Useful for depicting simple projects or parts of large projects Show start.
Project Management Chapter 3 BUSI 2106 – Operations Management.
Critical Path Analysis By: Troy Gonsalves. Motivation  The typical reason for failure is poor project-planning  Poor planning can result in missed deadlines,
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
GANTT Charts. What is a GANTT chart? A Gantt chart is a type of bar chart that illustrates a project schedule. Gantt charts illustrate the start and finish.
Project Management A project is an undertaking whereby a problem or a series of problems are solved. The project must be completed on time and within.
07 – Project Management Software
Project Management Software
Unit4-IT Project BTEC NATIONAL – UNIT 4 Project Management.
Project Time Management J. S. Chou, P.E., Ph.D.. 2 Activity Sequencing  Involves reviewing activities and determining dependencies.  A dependency or.
Managing the Design Process Project must  Accomplish the goals - scope  Be done within resources - spending  Be done on time - scheduling.
1 Project Software Version of March Small Projects: Less than 50 Activities 1.STORM for Windows – Version 4.0 (Project Management Module) Crown.
1 Project Software. 2 Small Projects: Less than 50 Activities 1.STORM for Windows – Version 4.0 (Project Management Module) Crown Custom Publishing, (330)
Year 11 Info Tech Project Management Overview. Project management overview identifying tasks, resources, people and time scheduling tasks, resources,
1 Project Software. 2 Small Projects: Less than 50 Activities 1.POM-QM for Windows – Version 3 (Project Management Module) Pearson Publishing, (215) ,
CPAN 410 & GAME 410 Project Management
TA. MARAM AL-KHAYYAL NET481 MS Project Overview. Outline Introduction to project management.  Project 2007 can help you manage project time, resources,
Unit4-IT Project BTEC NATIONAL – UNIT 4 Project Management MS PROJECT.
Unit 9.2_Lesson 2_CD Resource 2f_Plenary Gantt charts From the Gantt Chart answer the question.
TEAM MEMBERS: AHMAD AL-SALEH ( ) FAISAL AL-ESHIWY ( ) MOHAMMAD AL-DULAIJAN ( ) OpenProj Tool Presentation.
How to Perform Project Risk Management for Oil and Gas Projects
Risk Event Modeling Risk event modeling in part of Intaver Institute’s presentations on project risk management and risk analysis Intaver Institute Inc.
A tutorial on MS Project James Burns. Outline  Setting up MS Project  Defining Tasks (activity definition)  Activity Subordination (WBS)  Activity.
PLUG IT IN 6 Project Management. 1.Project Management for Information Systems Projects 2.The Project Management Process 3.The Project Management Body.
Quantitative Project Risk Analysis 1 Intaver Institute Inc. 303, 6707, Elbow Drive S.W., Calgary AB Canada T2V 0E5
A2 Technology Product Design Systems and Control Notes DT4 - Exam.
Project Scheduling Software
RiskyProject Enterprise Project Portfolio Risk Management Software Intaver Institute Inc. 303, 6707, Elbow Drive S.W, Calgary, AB, Canada Tel: +1 (403)
Chapter 6: Project Time Management Information Technology Project Management, Fourth Edition Using Critical Path and MS Project 2003 Tuesday, February.
Chapter 7 – PERT, CPM and Critical Chain Operations Management by R. Dan Reid & Nada R. Sanders 4th Edition © Wiley 2010.
Project Time Management Ashima Wadhwa. Schedule Development – Determining start and finish dates for project activities – Without realistic dates, project.
Project Scheduling Class 7.
Project Management Concepts Gantt Chart – shows tasks as bars whose length indicates timing. PERT* chart (Network Diagram) – shows relationships between.
Harnessing Your Projects: Using Project Management Techniques and Basecamp in Libraries Presented by: Barbara Lewis Coordinator for Digital Collections.
Event File System A Sample Scenario for Distributed Project Management Takashi Okumura Department of Computer Science, University of.
Project Planning Ing. Athanasios Podaras, Ph.D Faculty of Economics Department of Informatics Technical University of Liberec.
Windows Version 3.1
Project Management & Project Management Software
Chapter 11 Project Management.
Project Management and Information Security
How Organisations Use IT Continued
Project management.
This presentation uses a free template provided by FPPT.com Software Project Management
(b) (ii) Project Plan.
CIS 517 Education for Service-- tutorialrank.com
A tutorial on MS Project
RiskyProject Enterprise Project Portfolio Risk Management Software
What’s New in SEER-H The Galorath Team.
Quantitative Project Risk Analysis
SE Tasks for a Concept Development Project
Project Time Management
Risk Event Modeling Intaver Institute Inc.
Project Management Anirudh Reddy Agasti 4/25/2011 CSCI 577b.
Project Time Management
Asset Capture Workflow Process
Project Time Management
Project Time Management
Project Time Management
Presentation transcript:

ابزار مدیریت ریسک : Risky Project مهدی گرکانی “Risk management is project management for adults.” – Tim Lister درس هوش تجاری (http://ceit.aut.ac.ir/islab)

آزمايشگاه سيستم هاي هوشمند (http://ce.aut.ac.ir/islab) Risky Project چیست ؟ یک نرم افزار مدیریت ریسک windows-based است و تعیین می کند که بر سر برنامه پروژه چه خواهد آمد، اگر ریسک مشخصی اتفاق بیافتد. قابلیت ها: تعیین برنامه پروژه آنالیز کمی ریسک با استفاده از مدل های شبیه سازی Monte Carlo اندازه گیری کارایی پروژه آنالیز ریسک به صورت event-based انجام می شود راحتی استفاده ردیابی پروژه به همراه ریسک ها و عدم قطعیت ها آزمايشگاه سيستم هاي هوشمند (http://ce.aut.ac.ir/islab)

آزمايشگاه سيستم هاي هوشمند (http://ce.aut.ac.ir/islab) شبیه سازی Monte Carlo متد های مونت کارلو برای مدل کردن پدیده هایی با ورودی های غیر قطعی مانند محاسبه ریسک در کسب و کار، به کار می روند ( منبع: ویکی پدیا ) یک تکنیک شبیه سازی که اجازه ترکیب پارامتر های مختلف برای احتساب احتمال خروجی در مورد یک نتیجه نهایی را می دهد. ( منبع: http://www.decisionoptions.com/html/glossary.htm ) شبیه سازی مونت کارلو هزاران نتیجه خروجی محتمل را ( سناریو ها ) که ممکن است در آینده اتفاق بیافتد را تولید می کند. این روش مناسب عدم قطعیت و کارایی های مختلف که در بازار های مالی بسیار متداول است، می باشد. ( منبع: http://apps.finra.org/Investor_Information/Smart/401k/401KGlossary.asp ) آزمايشگاه سيستم هاي هوشمند (http://ce.aut.ac.ir/islab)

Risky Project Workflow آزمايشگاه سيستم هاي هوشمند (http://ce.aut.ac.ir/islab)

تهیه برنامه پروژه وارد کردن WBS مانند سایر نرم افزار های مدیریت پروژه قابلیت import برنامه پروژه از MS Project و Primavera وارد کردن WBS مانند سایر نرم افزار های مدیریت پروژه تعیین منابع، هزینه و درآمد مربوط به هر فعالیت

تعیین ریسک های عمومی نام ریسک ریسک های عمومی مربوط به کلیه فعالیت ها اختصاص دادن ریسک ها به منابع و فعالیت ها تعیین تاثیر احتمالی ریسک احتمال وقوع ریسک

تعیین ریسک های هر Task ریسک های مختص به فعالیت و منبع مشخص انتخاب و وارد نمودن ریسک های مربوطه

شبیه سازی Monte Carlo پس از انجام مراحل قبلی با کلیک کردن اینجا شبیه سازی مونت کارلو انجام می گردد RiskyProject employs convergence monitoring to ensure fast calculation

به علت وقوع ریسک مدت انجام پروژه به شکل قابل ملاحظه ای افزایش می یابد Gantt Chart خط های سفید نشان دهنده برنامه اولیه پروژه بدون در نظر گرفتن ریسک ها می باشد خط های آبی نمایانگر برنامه پروژه همراه با در نظر گرفتن ریسک می باشد به علت وقوع ریسک مدت انجام پروژه به شکل قابل ملاحظه ای افزایش می یابد

قابلیت دیدن جزییات بیشتر با کلیک بر روی نمودار ها نتایج آنالیز ریسک خلاصه وضعیت پروژه: مدت، هزینه و زمان اتمام با در نظر گرفتن و بدون در نظر گرفتن ریسک نتایج آنالیز مدت زمان، هزینه و زمان اتمام پروژه به صورت جداگانه قابلیت دیدن جزییات بیشتر با کلیک بر روی نمودار ها

نتایج ریزتر آنالیز مشخص کردن احتمال اینکه پروژه با بودجه در نظر گرفته شده انجام پذیرد دریافت جزییات داده های آماری قابلیت دریافت فایل خروجی با فرمت های مختلف مورد نظر و هماهنگ با سایر نرم افزار ها

آنالیز گردش مالی قابلیت مقایسه گردش مالی در دو حالت با در نظر گرفتن ریسک و بدون در نظر گرفتن آن گردش مالی بر اساس هزینه های ثابت و متغیر و همچنین درآمد های حاصل از فعالیت ها و منابع سیستم محاسبه می شود

فعالیت های حیاتی فعالیت های بحرانی که بیشترین تاثیر را بر روی برنامه ریزی پروژه می گذارند خط های سبز نشان گر فعالیت هایی هستند که خیلی حیاتی نیستند و بر روی برنامه ریزی پروژه تاثیر چندانی ندارند فعالیت های بحرانی ممکن است روی زمان یا روی هزینه و یا هر دو تاثیر بگذراند

مشخص شدن ریسک های مهم ریسک های با تاثیر بالا باید زودتر مدیریت شوند در این قسمت ریسک ها بر اساس میزان تاثیرشان مرتب و نشان داده می شوند

نتایج مهم آنالیز ریسک به ویسله داشبورد 3 × 3 نمایش داده می شود Project Dashboard 3x3 نتایج مهم آنالیز ریسک به ویسله داشبورد 3 × 3 نمایش داده می شود سه پارامتر مهم پروژه ( هزینه، مدت اجرای پروژه، زمان اتمام پروژه ) سه فعالیت مهم بحرانی سه ریسک مهم بحرانی

Risk Chart این فعالیت دارای مدت زمان اجرای کم ولی ریسک بالا می باشد این فعالیت ها دارای نسبت مدت زمان اجرا به اثر ریسک متعادلی می باشند

نرخ موفقیت بر اساس تعداد دفعاتی Success Rate این فعالیت تحت تاثیر ریسکی با درجه تاثیر گذاری لغو فعالیت قرار گرفته است نرخ موفقیت بر اساس تعداد دفعاتی که یک فعالیت cancel نمی شود تعیین می گردد

Project Tracking این فعالیت 100% انجام شده است ( خط های سبز ) این فعالیت نیمه کاره است و هنوز به اتمام نرسیده است ( خط های زرد ) این نرم افزار به صورت اتوماتیک احتمال وقوع ریسک برای فعالیت های نیمه کاره را محاسبه و به روز رسانی می کند

Tracking Results پیش بینی های پایین، مبنا و بالا مدت زمان واقعی اجرای پروژه زمان بندی اولیه پروژه

Risk Templates پنچ مدل قالب ریسک استاندارد در این نرم افزار تعبیه شده است قالب های ریسک استاندارد برای سازمان مورد نظر قابل اضافه کردن هستند

Integration With PM Software برنامه زمانی تولید شده توسط این نرم افزار قابل تبدیل به درخت تصمیم می باشد قابلیت هماهنگی با دیگر نرم افزار های مدیریت پروژه از جمله MS Project برنامه پروژه قابل تبدیل به WBS , PERT می باشد