LST Mechanical Design Review Utility Routing, Cableways & Crate Locations Peter Kim October 21, 2003.
Advertisements

Module Assembly Update Ohio State University and Princeton University are presently preparing facilities for module assembly. Both universities are fabricating.
Purpose Body Making module is designed for bending the laminated foil film in the shape of a tube, for welding the side seam and for cutting bodies with.
Mu2e Production Target Remote Handling By: Michael R. Campbell, Fermi National Accelerator Laboratory, , System Layout Basic.
OSU meeting, 04/24/2003 Richard Kass1 Limited Streamer Tube Project Overview Richard Kass Ohio State University Introduction (why, who, what….) The big.
IFR-LST status report G. Cibinetto INFN Ferrara Babar Collaboration Meeting, Feb. 21, 2004 Milestones LST production status 1 st module assembled Princeton.
V. Carassiti - Princeton (USA) 9-13/01/ BABAR IFR UPGRADE DETECTOR ASSEMBLING AND MOUNTING.
10/21/03H.J. Krebs1 LST Mechanical Design Review Brass Absorber Design H.J. Krebs October 21, 2003.
2004 BRASS INSTALLATION HARDWARE. BRASS INSTALLATION FOR 2004 TOP AND BOTTOM SEXTANTS ONLY PROCEEDURE AND FIXTURES FOR TOP AND BOTTOM ARE SIMULAR.
The AMS-02 detector is based on a large acceptance (~0.5 m²sr) and high sensitivity spectrometer composed by a super-conducting magnet (0.8 T), cooled.
Senior Design: Validation of Design December 15, 2008.
LCLS-II Magnetic Structure Design Review - Conceptual Mechanical Design: Module Assembly Method Alan Black Steve Marks 7/6/11 1.
Shielding the Weiner PSU 7 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
SHEAR AND BENDING MOMENT DIAGRAMS IN HORIZONTAL BEAMS WITH
October 21, 2003H.J. Krebs1 LST Mechanical Design Review Handling & Installation Fixtures Design and Fabrication Status H.J. Krebs October 10, 2003.
MQXF Cold-mass Assembly and Cryostating H. Prin, D. Duarte Ramos, P. Ferracin, P. Fessia 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Advanced Endplate - mechanics: Development of a Low-Material TPC Endplate for ILD Dan Peterson Laboratory for Elementary-Particle Physics, Cornell University.
VXD Mechanical R&D at the University of Washington H. Lubatti, C. Daly, W. Kuykendall LCRD in conjunction with Fermilab, SLAC.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
1 Fulvio TESSAROTTO the new RICH beam pipe the new RICH beam pipe - pipe production, gluing and tests - measurement and removal of the old pipe - fixation.
LST Upgrade LST Upgrade Readiness Review William Sands, Princeton University,
L0 and L1 Structure Deflections During Installation of Silicon Sensors C H Daly 8/24/2003.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
Ronald Lipton Layer 0 Status PMG Sep Status of the Layer 0 Project – emphasis on hardware status, preproduction, and preparations for shutdown work.
Baby MIND coil modules assembly the aluminium folded strip solution 1 Alexey, Philippe, Gabriella, Helder, Herman Baby Mind Magnet CERN June.
Adrian Bevan Queen Mary, University of London SVT Mechanical Support and Strip Sensors.
Test Tube Activities at Ohio State (8/5/03) Two (very useful) sub-group meetings after last weekly meeting –Mechanics (Bill, Lu, Mark, Jim, Charlie, Klaus)
The Mechanical Structure for the SVD Upgrade
GLAST LAT ProjectMarch 24, B Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS B: EM Mini-Tower Robert Johnson.
Laura Ingalls Huntley Office of Science, SULI Program Franklin & Marshall College Stanford Linear Accelerator Center Menlo Park, California 16 August 2006.
CPA Micarta Based Rahul Sharma / Bill Sands. The present design shown in this document is based on the use of Micarta as the base material this will likely.
Mechanical Designs of The Central Detector Jinyu Fu
Jan. 28, 2014W. Bertl, PSI BPIX Cooling Status W. Bertl, PSI.
Quality Control QC is taken very serious QC Document for Tube Production QC Document for Module Assembly QC Document for Installation.
Walter Sondheim 6/9/20081 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL.
LARP Collaboration Meeting Racetrack Coil Fabrication
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
MQXFB design, assembly plans & tooling at CERN J.C Perez On behalf of MQXF collaboration team MQXF Workshop on Structure, Alignment and Electrical QA.
Wire and Cathode Planes - Current Concept (work in progress) PPD Internal Review – 2 nd Part April 19 th, 2005 Rafael Silva FLARE Fermilab Liquid Argon.
G-10 CPA March 2016 Bill Sands. Design Criteria Structure must support the CPA panels and Field Cage Differential contractions must be identified and.
CPA: Decisions, Issues, Next steps Francesco PIETROPAOLO CERN / INFN-Padova Field Cage CPA and Integration/Installation week, BNL, March 11th, 2016.
All Metal Gate Valve from VAT
B [OT - Mechanics & Cooling] Stefan Gruenendahl February 2, 2016 S.Grünendahl, 2016 February 2 Director's Review -- OT: Mechanics &
Sentek Technologies Joining EnviroSCAN Probes. Probe Components 20-way probe cable connector (special order) Cable spacer (Part No 80015) Probe rods Probe.
SuperB – IFR status of the detector & tooling development 1V. Carassiti - INFN FEINP PAN 07-09/09/2012.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
Basic Aircraft Structure
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
QXF Coil Fabrication & Tooling Reaction / Impregnation
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
BaBar LST Upgrade Mark Convery SLAC 13 Jun 07.
High Order correctors coil manufacturing
FRESCA2 Update on the dipole design and new calculations
SIMPLE LINEAR REGRESSION MODEL
IFR detector mechanics
Pierre-Alexandre Thonet
Material Joining and Beam Bending
BaBar IFR Upgrade Mark Convery SLAC 7 Jun 06.
LST Module Installation
Basic Aircraft Structure
RPC and LST at High Luminosity
Undulator Assembly Procedure
Limited Streamer Tube Project Summary
Wind Turbine Types.
Heat Recovery Steam Generators
BaBar LST Upgrade Richard F Boyce
Combined Cycle Power Plants
CGThermal Umax® Advanced Ceramic Shell and Tube Heat Exchanger
Presentation transcript:

Limited Streamer Tubes Mechanical Design Review William Sands , Princeton University, 10-21-03

Overview The Limited Streamer Tube (LST) has been used in experiments around the world with great success as a particle detector. This is not a new technology and it’s proven effectiveness in other experiments was a leading reason for the LST being chosen for RPC replacement in BaBar. The individual LST will be referred to as a tube and an assembled set of two or more will be referred to as a module. The tube will be built at Pol Hi Tech in Italy and after extensive testing will be sent to the U.S. for assembly at Ohio State University and Princeton University. It will take 1164 tubes to make 564 modules to populate the needed layers in all sextants.

Basic LST Components

Basic Handling The tubes and modules will always be handled out of boxes and fixtures with there x-axis vertical for greatly increased strength against deflection. Although they are very long and made of PVC they are quite robust especially as a module.

Assembly of Modules Modules will be assembled in fixtures such as shown here. The individual parts will be bonded with a 2 part epoxy made by Shell ,using Epon resin 815C and Epi-Cure 3140 as the hardening agent.

Assembly Procedure Diagram The PHI strip is placed in the fixture and epoxy is applied, then epoxy is applied to the inner sides of the tubes and rib prior to being set on the PHI strip and hold downs placed on. After curing the fixture is pivoted vertical for module removal. The stainless rib is placed in the module to assist in the rigidity of the module when the x-axis is in the horizontal position in the magnet. The rib will help overcome any anomalies in the magnet steel.

Shipping ,Testing and Installation Box From the gluing fixture the module is moved to a specialized box deemed the H-box because of it’s shape. The box will be constructed in Italy and shipped to the U.S. with tubes inside and then be able to accept modules for testing and shipping.

H-Box Properties As long as only the top is removed the H-Box remains very resistant to deflection and prop twist. After testing one side the top is replaced and the box is flipped to access the other side. The aluminum foil is in place for testing purposes.

Conclusion Spare tubes and modules will be built but with extensive testing and quality control these should be at a minimum. The overall structure of the tubes and the modules are simple and robust making them a reliable detector for BaBar.