1 SMS – Spares Management Software Overview and Case Studies.

Slides:



Advertisements
Similar presentations
Números.
Advertisements

C) between 18 and 27. D) between 27 and 50.
Spares Management Software
Trend for Precision Soil Testing % Zone or Grid Samples Tested compared to Total Samples.
You have been given a mission and a code. Use the code to complete the mission and you will save the world from obliteration…
AGVISE Laboratories %Zone or Grid Samples – Northwood laboratory
Enron Broadband Services
EuroCondens SGB E.
Worksheets.
Operations Management Maintenance and Reliability Chapter 17
1 Copyright © 2010, Elsevier Inc. All rights Reserved Fig 2.1 Chapter 2.
Addition and Subtraction Equations
By D. Fisher Geometric Transformations. Reflection, Rotation, or Translation 1.
1 Impact of Decisions Made to Systems Engineering: Cost vs. Reliability System David A. Ekker Stella B. Bondi and Resit Unal November 4-5, 2008 HRA INCOSE.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Title Subtitle.
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Addition Facts
Year 6 mental test 5 second questions
Year 6 mental test 10 second questions Numbers and number system Numbers and the number system, fractions, decimals, proportion & probability.
Identifying money correctly 1
Around the World AdditionSubtraction MultiplicationDivision AdditionSubtraction MultiplicationDivision.
Who Wants To Be A Millionaire?
ZMQS ZMQS
突破信息检索壁垒 -SciFinder Scholar 介绍
Solve Multi-step Equations
Slides prepared by JOHN LOUCKS St. Edward’s University.
Operations Management
Reliability McGraw-Hill/Irwin Copyright © 2012 by The McGraw-Hill Companies, Inc. All rights reserved.
The basics for simulations
Water Distribution Systems – Part 1
ABC Technology Project
Mental Math Math Team Skills Test 20-Question Sample.
Capacity Management Planning the resource capacity that a firm will need to meet its demand.
Capacity and Constraint Management
Progressive Aerobic Cardiovascular Endurance Run
Squares and Square Root WALK. Solve each problem REVIEW:
Charging at 120 and 240 Volts 120-Volt Portable Vehicle Charge Cord 240-Volt Home Charge Unit.
Lets play bingo!!. Calculate: MEAN Calculate: MEDIAN
LESSON 4-1 Preparing a Chart of Accounts
Chapter 5 Test Review Sections 5-1 through 5-4.
GG Consulting, LLC I-SUITE. Source: TEA SHARS Frequently asked questions 2.
2011 WINNISQUAM COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=1021.
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
2011 FRANKLIN COMMUNITY SURVEY YOUTH RISK BEHAVIOR GRADES 9-12 STUDENTS=332.
Addition 1’s to 20.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Foundation Stage Results CLL (6 or above) 79% 73.5%79.4%86.5% M (6 or above) 91%99%97%99% PSE (6 or above) 96%84%100%91.2%97.3% CLL.
Subtraction: Adding UP
Test B, 100 Subtraction Facts
1 Atlantic Annual Viewing Trends Adults 35-54, Total TV, By Daypart Average Minute Audience (000) Average Weekly Reach (%) Average Weekly Hours Viewed.
Week 1.
We will resume in: 25 Minutes.
Static Equilibrium; Elasticity and Fracture
A small truth to make life 100%
Resistência dos Materiais, 5ª ed.
A SMALL TRUTH TO MAKE LIFE 100%
1 Unit 1 Kinematics Chapter 1 Day
PSSA Preparation.
Lial/Hungerford/Holcomb/Mullins: Mathematics with Applications 11e Finite Mathematics with Applications 11e Copyright ©2015 Pearson Education, Inc. All.
UNDERSTANDING THE ISSUES. 22 HILLSBOROUGH IS A REALLY BIG COUNTY.
Introduction Embedded Universal Tools and Online Features 2.
Schutzvermerk nach DIN 34 beachten 05/04/15 Seite 1 Training EPAM and CANopen Basic Solution: Password * * Level 1 Level 2 * Level 3 Password2 IP-Adr.
Presentation transcript:

1 SMS – Spares Management Software Overview and Case Studies

2 Interval Stock Reliability Spares Management Software (SMS) Optimal Spares Requirement Optimization criteria Instant. Stock Reliability Availability Cost Minimization Supportability Stock Remaining Life Non-Repairable Spares Repairable Spares

3 # items in service Repair shop repaired units stock time Failures failed units

4 Criteria for Decision Making 1.Instant reliability 2.Interval reliability 3.Cost minimization 4.(Process) Availability

5 Scenario Plant has 62 electric motors on their conveyor systems (Mining company) MTBReplacements of motors is 3000 days (8 years) Planning horizon is 1825 days (5 years) Cost of spare motor is 15,000 $ Value of unused spare is 10,000 $ Cost of emergency spare is 75,000 $ MTTRepair a motor is 80 days Cost of plant downtime for a single motor is 1000 $ per day Holding cost of a spare is 4.11 $ per day (10% of value of part/annum) QUESTION: HOW MANY SPARE PARTS TO STOCK?

6 Results: Repairable Parts Electric motors Interval reliability: 95% reliability requires 7 spares Instant reliability: 95% reliability requires 4 spares Cost minimization: requires 6 spares. Associated plant availability is % Availability of 95%: requires 0 spares. Associated electric motor availability is 97.4% [Note: If availability of 99% was required (rather than the specified 95%) then spares required would be 2]

7 Reference Case Population100 transformers Failure Rate0.005 failures/transformer/yr Repair Time1 yr Replacement Time0.001yr Interval1 yr

8 Repairable Instantaneous Reliability Vary Spares Spares Reliability

9 Case studies: 1.Fume fan shaft, blast furnace in a steel operation: non- repairable part, decision support 2.Power train component, haul trucks: repairable parts, multiple criteria 3.Frigate control system: supportability interval Additional Cases

10 1. Fume fan shaft – steel mill Spares provisioning optimization project Part: fume fan shaft used in a Blast Furnace Decision: should there be 0 or 1 spares? Complication: Part has long lifespan (25-40 years). Long lead time (22 weeks). If part fails, results are catastrophic (loss of almost $6 million per week). Inventories are trying to be minimized. SMS was used to quantify the risk involved in not having a spare Decision support

11 How many spares – Fume fan shaft?

12 2. Repairable components – haul trucks Open pit mining operation in South America Haul truck power train component: COMPONENT X

13 6,600 operating hours per truck per year (average fleet utilization) Preventive replacement policy at 9,000 operating hours in place Repairable components - Data / 1 General Two parameter Weibull distribution, fitted using Weibull events: 86 failures, 85 suspensions (preventive replacements) Beta = Eta = 14,650 operating hours Mean time to replacement = 6,420.3 operating hours Time to replacement

14 Based on estimations provided by maintenance personnel Estimated at MTTR = 452 operating hours Repairable components - Data / 2 Time to repair Downtime: estimated using operational indicators (value of lost production, $2,173.3 / op. hour) Holding: 25% of the value of the part per annum ($1.51/ op. hour) Cost of downtime and holding costs

15 Repairable components - Data Summary SMS can perform the optimization based on four criteria ParameterValue Number of components in operation78 MTBReplacements (μ) (op. hours) Planning horizon (T)6600 (op. hours) MTTRepair (μ R )452 (op. hours) Holding cost for one spare$1.51 per op. hour (25% of value of part/annum) Cost of plant downtime for a single component$ per op. hour

16 Repairable components - Results Case & Optimization criteriaOptimal Stock level Associated Values Interval Reliability (goal = 95%) 15Reliability = 98.05% (for stock=14, Rel.=94.99%) Instantaneous Reliability (goal = 95%) 10Reliability = 97.53% (for stock=9, Rel.=94.75%) Availability (goal = 99%) 6Availability = % Cost minimization14Total cost per unit time = $23 Inst. Reliability = 99.94%

17 4. Frigate control system – supportability intervals (S.I.) Determination of supportability intervals Several electronic components – control system Parts no longer available - discontinued Decision: how long can we support the operation of the system using only the current stock? (achieving the desired reliability of the stock)

18 Case Study – Supportability Interval (S.I.) Summary of Data Supportability interval (RUL of current stock) can be rapidly calculated using SMS – NEWLY ADDED FEATURE

19 Case Study (S.I.) / 2 Results Supportability for the system is influenced by the (shortest) supportability for any of its critical parts

20 Case Study (S.I.) / 3 Informed decisions for: Adequate timing for replacement of current system Placement of final orders for discontinued parts Maximum supportability interval for current stock – procurement planning

21 Thank you