Maximo extension to worldwide Suppliers for complete data integrity

Slides:



Advertisements
Similar presentations
Managing Hardware and Software Assets
Advertisements

SCO 3 Crewing Optimization As-Is Processes January 9, 2006
04/16/ Time & Expense Project State of Michigan Time & Expense Project NASC/NSAA Middle Management Conference April 16, 2008.
HIV Drug Resistance Training
QLM ® CAPS CAPITAL ASSET PLANNING SYSTEM. QLM ® CAPS The focus should be on getting it right the first time. QLM Capital Asset Planning System (CAPS)
International Civil Aviation Organization TECHNICAL CO-OPERATION BUREAU PROCUREMENT SECTION Procurement of Civil Aviation Goods and Services.
Contents Introduction and Background The Objective Recommendations
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
“The Honeywell Web-based Corrective Action Solution”
SOGAT 2012 The Shah Gas Development Project
C MKT Overview of CH2M HILL US Civil Nuclear Industry Programme in Romania September 2009.
A Company Overview. Who are KG Enterprises Specialising in Logistics Review – Process Re-engineering – Sub-contract selection & management – Working within.
The New GMP Annex 11 and Chapter 4 Deadline for coming into operation: 30 June 2011.
Web Enabled Vendor Data Collection on BP Angola Block 18 Project Howard Chipperfield, Information Manager BP c o n t e n t e n g i n e e r i n g.
TabWare Overview for NetSuite
Product lines: 1. Integrated Fire and Gas Detection Systems. 2. Gas, Fire and Flame Detection Systems. 3. Portable Gas Detectors. 4. Lifecycle Healthcare.
Introduction to Integrated Library Systems
International Civil Aviation Organization Aviation System Block Upgrades Module N° B0-30/PIA-2 Service Improvement through Digital Aeronautical Information.
Generation Business Line
 Meaning: Establishment of an industry at a particular place.  It refers to the choice of region and the selection of a particular site for setting.
Plant Information Model (PIM) Breakout N1 – (1:00pm – 2:30pm), Monday, June 16, 2014 Russell Adams – EPRI Consultant Laurent Perkins, Bentley Kent Freeland,
TS&SD Transmission Business Experience in Unification of Engineering Standards & Specifications 27 October 2008 LASTPREVIOUS NEXT.
Delaware Valley Chapter
Introduction to Management Information Systems Chapter 8 E-Commerce and Supply Chain Management HTM 304 Fall 07.
EE1: Procurement Updates
Pertemuan 15 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Umbrella Corp Practica 9 – English Group E-commerce Resources.
Project Centric Solutions Page 1 Swaziland Electricity Board Magsoft e-Tendering Solution Magsoft International LLC
Summary Maximo is an Enterprise Asset Management System used by Cornell University Facilities Services. Many of Cornell's physical assets found across.
Top Tactics for Maximizing GMP Compliance in Blue Mountain RAM Jake Jacanin, Regional Sales Manager September 18, 2013.
©2009 HP Confidential TUNGSTEN NETWORK AND PAPER INVOICING.
Automating your Business Processes Using Oracle Workflow Therron Hofsetz Logical Apps, Inc.
1 TOKYO STOCK EXCHANGE’s XBRL project AOSEF Market Data & Technology Collaboration Workshop 2007 Nov. Ver.1.0.
Tango Asset Management Capabilities Presentation 1.Desktop & Web Architecture 2.Equipment Management 3.Condition Management 4.Data Mining 5.Parameter Trending.
AMR Deployment Managing All That Data The Typical Process Buy Meter Test Meter Ship Meter Issue Install Setup Account Start Billing Remov e Meter.
Leveraging Oracle Data for Web- Based Reporting Northern California Oracle Users Group May 2001.
From Research Prototype to Production
1 Life after Implementing ERP In Pennsylvania Presented by: Harvey C. Eckert Commonwealth Comptroller Commonwealth of Pennsylvania For: Annual NASACT Conference.
Systems Analysis And Design © Systems Analysis And Design © V. Rajaraman MODULE 13 ELECTRONIC COMMERCE Learning Units 13.1 What is E-Commerce? 13.2 Electronic.
Press the F5 key to continue Project Manager is a web based Project Management Tool. All your work is done and information stored on the internet cloud.
Federal Acquisition Service U.S. General Services Administration Brandy Untalan Customer Service Director August 28, 2013 GSA Schedules Program.
Computer Scoring Le Grand Concours 2011 and beyond.
E.Matias Canadian Light Source. Where is Saskatoon?
Florida Fish and Wildlife Conservation Commission.
PAGE 1 New Plant - CM Configuration Management For The Next Generation Of Nuclear Facilities Joseph Burack Consulting Engineer Configuration Management.
10th Configuration Management Benchmarking Conference June 15-18, 2003 Hershey, PA 2003 CONFERENCE " A Decade of Sharing" Configuration Control of Parts.
E-Cruitment Ash Patel, M.Ed., CHRP, CTDP, PHR
Electronic Design Change Process Paul Tobin Jr.- PKMJ Technical Services.
Clarification Meeting: Supply and Delivery of performance and testing equipment for Boiler, Turbine and Auxiliary equipment at Kusile Power Station Project.
State of California Suppliers. What is eProcurement eProcurement's goal is to provide suppliers with a more streamlined and efficient approach to doing.
EC&O – BUSINESS Business Benefit Due to OMNI. OMNI – Complete EC&O Solution What is EC&O stands for… Real Estate Developer Developer plus contractor Core.
Vendor Managed Inventory Bar-Coded Multi-Bin Automatic Stock Replenishment System With GSM Technology Designed, Supplied and Operated by, ISO 9001:2008.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Alfa Electrochlorination Specialists. Alfa Electrochlorination Specialist LLC was established in Abu Dhabi, United Arab Emirates on July 2004, founded.
Services Capabilities “A Different Approach” Neil Taylor.
TUNGSTEN NETWORK AND PAPER INVOICING
SPO Overview and Power Template
Electrochlorination Alfa Electrochlorination Specialists Electrochlorination
Service reference ABU DHABI, United arab emirates IND 36 months
Document Handover Training Session
Topics of Discussion Who Are We? What do we do? How Do We Do It?
Paper vs. E-Invoicing November, 2015
CDRL E003 CFAT REPORT TEMPLATE
Electronic Products Workshop Division of Air Resource Management -DEP
InLoox PM Web App product presentation
Standard Design Process (SDP) Software Tom Czerniewski Entergy Nuclear
Final Design Authorization
Paper vs. E-Invoicing November, 2015
Presentation transcript:

Maximo extension to worldwide Suppliers for complete data integrity Dasdasd gfsrf By: Nabil Ghaleb ADNOC Group (Gasco) ADNOC GROUP (GASCO)

Content Major Oil and Gas Plants Expansions Importance of data Origin of data Original process for collection and input of data Problems Solutions Data control and systems support Benefits Questions and Answers Dasdasd gfsrf ADNOC GROUP (GASCO) 2

1-Major Oil and Gas Plants Expansions ADNOC Group is currently going through multibillion dollars expansion projects for many of its oil, gas and petrochemical facilities in Abu Dhabi, UAE. Assets and Inventory will be more than double in the coming five years. Need for accuracy and completeness of Commercial and Engineering data since they are critical for the timely completion of Projects and for the Plants operations. Dasdasd gfsrf ADNOC GROUP (GASCO) 3

2-Importance of data Suppliers: Need for a wide range of approved Vendors/Contractors to procure quality products and services at optimum costs (In Billions of US$). Assets: Need for accurate Assets information, specification, Inventory Catalogue, Bill of Materials, Parts lists, Drawings, etc for effective maintenance in order to keep high Plants Reliability and Availability at optimum costs. Dasdasd gfsrf ADNOC GROUP (GASCO) 4

3-Origin of data Vendors and EPC Contractors. Large volume of data originating from many different sources is difficult to handle accurately in a limited project duration. Dasdasd gfsrf ADNOC GROUP (GASCO) 5

4-Original process for collection and input of data Various electronic formats and some in hard copies. Scattered incomplete information. Manual input into Maximo that have a great impact on accuracy and completeness of data. Electronic downloads (Back end) into Maximo tables that have a great impact on accuracy and integrity of data. Dasdasd gfsrf ADNOC GROUP (GASCO) 6

5-Problems Incomplete and inaccurate information. Ineffective procurement of Assets. High Inventory levels. Inaccurate Inventory Catalogue (Buying Description, etc). Inaccurate sourcing of materials. Ineffective operation and maintenance of Assets. Low Plants Reliability and Availability. High Plants operations costs. Dasdasd gfsrf ADNOC GROUP (GASCO) 7

6-Solutions Extend Maximo to worldwide Vendors and EPC Contractors for direct input of base Commercial and Engineering data. Suppliers on line registration and pre-qualification system (E-Registration). On line input of Projects Assets and Spare Parts system (G-SPIR). Systems are based on Maximo 5 and available on the Company’s Internet web site. Note (Inventory Data Sharing system (IDS)) Dasdasd gfsrf ADNOC GROUP (GASCO) 8

Internet User SOLS SPIR MAXIMO Production Register and Evaluate Suppliers Internet User SOLS Collect Project related Spare Part data SPIR Upload Approved Supplier data Upload Location, Assets and Spare Part Data MAXIMO Production ADNOC GROUP (GASCO)

7-Data Control and System Support Ensure that a clear scope and business process is in place (Part of EPC Project Tender Document). Assign dedicated Materials Engineers to review data entered by Vendors/EPC Contractors. Ensure that Training is conducted for the EPC Spare Parts Coordinators. Ensure that User Manual is available on CBT ON LINE. Ensure reliable IT infrastructure. Ensure effective proactive support (Business and IT) Dasdasd gfsrf ADNOC GROUP (GASCO) 10

8-Benefits Direct input of data by respective Assets Vendors and EPC Contractors into Maximo Defined Applications and Templates thus maximizing accuracy and completeness of data. Data analysis and control using Maximo reports and KPIs. Interchangeability made on line with existing stock and against other Projects spares. Non stock items are also catalogued. Assets Bill of Materials are ready before Plants commissioning. Systems are interfaced with Maximo Production thus reducing input errors. Dasdasd gfsrf ADNOC GROUP (GASCO) 11

9-Questions and Answers Dasdasd gfsrf ADNOC GROUP (GASCO) 12