OPA wiring To Scope EHD V 100K 10K.

Slides:



Advertisements
Similar presentations
Amplifying Signals Breadboarding: from a diagram to an actual working amplifier.
Advertisements

Principles of Physics. Ideal Physics World  No energy loss  Resistance only in resistors Real World  Resistance in wires  Resistance causes heat 
Certified Service Training Welcome to Diaphragm Pumps Start.
Dishwasher Rework. Identify Unit Disconnect Power Turn off Breaker… … or unplug power cord.
Cleaning H50/52 Blowers The condition of the blower motor has a direct affect on the operation of an H50/52 fryer.
MOOD LIGHT PCB ASSEMBLY V By Phil Townshend 2008.
How to draw in 1 Point Linear
Teacher/Mentor Institute Hands-On Session: Building a Robot Scott McEwen & Kevin Barrett July 21-22, 2014.
PKI-Anwendungen 6/2/ Base framework. PKI-Anwendungen 6/2/ Bottom frame.
Featurecam Setup Zero.
60 Hz Variations in Pins Plugged probe into temperature controller output pins: pins 1, 2, 3, 4 all show 1V p-p variations Plugged probe into pins at other.
WALTA DAQ. Input 4 BNC Connections for PM signal GPS Connection for Time Signal Serial port for programming.
Nameplate Test Results for 30 Watt Solar Panel Shown in Class, Nov.
Positive and Negative Numbers
Finding Percentages. Profits are up by 97%.
Multiplying Positive & Negative Numbers. -6 x –4 = =
Lab #5 Overview Activity #1 - Simulation of an Op-Amp inverting amplifier Activity #2 - Build and Test the Op-Amp inverting amplifier Activity #3 - Determining.
Teacher/Mentor Institute Hands-On Session: Building a Robot Scott McEwen Chuck Powell.
Electrical Circuits and Ohm’s Law Monroe. There are two main kinds of circuits. 1.Series circuits a. Each part of the circuit is wired to the next b.
Teacher/Mentor Institute Hands-On Session: Building a Robot Carolyn Bauer July 30-31, 2015.
First, let’s review the structure and use of a breadboard.
Representing Integers A12. What integer is represented below? +2.
Elements of a Small Off-Grid 24 Volt Solar System (Installed by Mack Grady at Gary Grady’s cabin, 15 miles north of Silverthorne, CO, in the Gore Range.
ADT490 TroubleShooting Grounds. 2 Prior to Troubleshooting ‣ Before starting to work on the FACP, what do you do? 2.
Wind Energy. How does wind energy work? The wind blows on the blades and makes them turn. The blades turns a shaft inside the nacelle (the box at the.
Applied Physical Science Test – Basic Home Wiring Name: __________________ Section 1 – Switch-Controlled Light Fixture – Power enters Switch Box Directions:
Oregon Robotics Tournament and Outreach Program RCX Basics.
Describe, in German, the following: I live in a house. On the ground floor I have a kitchen, bathroom and living room. On the first floor I have 3 bedrooms.
Natural Sciences and Technology Grade 5 Term 3: Energy and Change Mains Electricity (PPT 2)
Absolute Value -The distance a given number is from zero on the number line Simplify. 1) 2) 3) 4) 5) 6) Objective - To add.
Chapter 1 Replacing Power Supplies Prepared by: Khurram N. Shamsi.
TRIGGER DELAY 100µs. G. Gräwer AB/BT/ECLBDS Trigger Delay2 The trigger delay is a back-up system that generates an asynchronous dump trigger for MKD and.
A cell is like a truck. A nucleus is like a… The nucleus is like the person that drives the truck. The person controls the truck like the nucleus is the.
The monitor The monitor is essentially a computer. The four inputs along the top are: Power, Voltage, Current, and an Ethernet connection.
Vex Robotics Program Two: Using two motors. Program two: using the motors In the last section, you learned how to turn on one motor. Now, you will take.
Basic Stamp OEM module By Wilmer Arellano. 2  The BASIC Stamp 2 OEM is a discreet component version of the BS2 which may be purchased in kit form. 
PLC Front Panel.
Text Talk-Kindergarten – Unit 6 Old Wire Elementary School.
EE101-Lecture 8 Operational Amplifier Basics of amplifiers EE101 Fall 2012 Lect 8- Kang1 Noninverting amplifier & Inverting amplifier.
Building controller with joystick and buttons. put joystick together (keep things in order below)
Installing Branch Circuits Unit #32. What are Wiring Boxes? hold cable or conduit and protect connections attached to building contain all electrical.
How to draw in 1 Point Linear
Trend Lines MGSE8.SP.2 EQ: What is a trend line?
Multiplying Whole Numbers
I CAN READ LONGER PARAGRAPHS PICKING OUT KEY WORDS FOR STEP 3 AND 4
PLC Front Panel.
PCB Design and Construction
Non-linear Op-Amp Circuits Tim. Content 1 Introduction 2 Zero Crossing Detector – 2.1 Non-Inverting Zero Crossing Detector 2.1 Non-Inverting Zero Crossing.
SKYLINE SKYLINE HAS CHANGED THE WAY THE POLEBOX CARD SHOULD BE WIRED AND ALL FUTURE NEW INSTALLS WILL BE DONE THIS WAY. IF YOU GO TO A SITE TO WORK ON.
NEC Wiring Diagrams.
3.4 Mi-com upload if necessary
Electrical Wiring Single Pole Switches.
PLC Front Panel.
NI Data Acquisition (DAQ) Wiring and Connections
בשואה הגיעה ההיסטוריה היהודית לסופה מה מתחיל כעת עדיין איננו יודעים
Peripheral Devices
PLC Front Panel.
Elements of a Small Off-Grid 24 Volt Solar System
How to draw in 1 Point Linear
Represent statement as integers
Module 7: Lesson 7.1 Connecting Intercepts and Zeros
Which of the following would best describe the situation inside the circle?
Building a Foundation.
PLC Front Panel.
Give your answer as a mixed number in its simplest form
Project: Wiring a Building
PLC Front Panel.
Oregon Robotics Tournament and Outreach Program
After service guide for changing PCB
How a Bill becomes a Law.
Presentation transcript:

OPA wiring To Scope EHD V 100K 10K

EHD Shaker shaft OPA Wire from OUT-A to the scope through BNC port Wire connecting the ground on the PCB to the housing Wire connecting the ground on the PCB to the housing. When disconnected the OPA output goes from saturation to zero Wire from OUT-A to the scope through BNC port EHD Shaker shaft Below the floor there is another box where the shaker is. There is a small slit at the floor that connects the shaker to the shaker shaft that holds the EHD The box can be closed