ISO TC64/SC4/WG2 June 2010 status

Slides:



Advertisements
Similar presentations
ISO ESP Systems Task Group Leader, Shauna Noonan
Advertisements

Technical update on ISO 9001:2015 Colin MacNee Duncan MacNee Limited
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Robert Urbanowski Vice-Chair: Mark Trevithick.
2015 Exploration & Production Winter Standards Meeting SC10 & SC13 Updates January 27-29, 2015 Intercontinental Hotel New Orleans, LA.
SUBSEA PRODUCTION SYSTEMS (SC17) Liaison Report
ISCC Report Spring Refining Meeting 2007 Seattle, Washington.
SC8 Liaison Report API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
Kent Grebing, API SC 16 Chair
SC 16 DRILLING WELL CONTROL SYSTEMS API SC18 Report out Session API 2015 Winter Standards Meeting Kent Grebing, API SC 16 Chair.
API SC18 Work Group 2 API Exploration & Production Standards Conference on Oilfield Equipment and Materials Westminster, Colorado June 23, 2009 Ed Durante.
Annual report TC67/SC4/WG3 Wellhead and Xmass tree ISO10423vs API 6A WG Scope:standardisation of wellhead and xmass trees plus valves WG convenor :Ries.
2015 Exploration & Production Standards Conference Subcommittee 10 June 23-25, 2015 Hyatt Regency San Francisco, CA.
Rolling Resistance Standards Work at ISO (TC31 WG6) Prepared for GRB Review 19 Sep 2011 Angela Wolynski WG6 Convenor Informal document GRB (54th.
WG9 Report ISO/TC211 Plenary Meeting Montreal, Canada
API WIWC TG-5   Well Intervention Well Control   Task Group   Winter Conference Update   Alex Sas-Jaworsky P.E   Chairman.
SC 19 Liaison report to SC 18 API Winter Conference 2013 Jimmy Hashem Jan 24, 2013.
API 17P TASK GROUP January 15, BACKGROUND NWI Initiated in 2006 NWI Initiated in 2006 API 17 P / ISO new recommended practice API 17 P.
SC8 Liaison Report 2014 Exploration & Production Standards Conference API SC8 – Subcommittee on Drilling Structures & Equipment Chair: Mark Trevithick.
ISO Current status of development ​ ​ ISO development process ​1​1.
Provenance and Context Content Standard (Emerging) – Status of Activities H. K. Ramapriyan Science Systems and Applications, Inc. & ESDIS Project, Code.
Subcommittee on Oil Well Cements (SC10) Wednesday June 18 th, 2014: General Meeting  Publication of API Specification 10A “Cements and Materials for Well.
SC13 –TG 2 PUBLICATIONS ISO / TC67 / SC3 / WG1 Hyatt Regency – San Francisco 29 Jun 2011 – 8:00 am.
San Francisco, CA. SC8 Liaison Report
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
2016/6/11 1 Liaison Report on ISO/TC215 Hidenori Shinoda 6/29/2007 Berlin.
Page © ASME 2016 Module B – Process B8a. US TAG to International Standards Organization (ISO) Standards Development Standards and Certification Training.
IEC Ed 2 Collaboration IEA Task 32 Round Robin & PCWG Worked Examples NREL, Colorado, US 10 th August 2016 IEC Task 32: Luke J Simmons (DNV GL)
TG Chair: Darren Bane (BHI)
2017 Exploration & Production Winter Standards Meeting Subcommittee 10
Task Group API 19SS Sand Screens
API SC19 HPHT Template (Proposed as SC19TR1)
CEN/TC 12 and ISO TC67 SC4 Plenary meeting
Updates from SC18 Summer Meeting
WG Technical Editor’s Report
WG Technical Editor’s Report
Task Group API 19SS Sand Screens
API 17Q Proposed Technical Changes to Rev 0
API RP 17A - Discussion Points
API 16F June 2017 Specification for Marine Drilling Riser Equipment
ISO Task Group Update Wayne Mabry.
Status Update on API 16Q / 16R / 16F
API SC6 Valves and Wellhead Equipment
Potential Milestones A timeline to finish in one year
Specification on float equipment
ISO TC64/SC4/WG2 May 2011 status
API SC-16 task group for Specification 16D
API 17H TASK GROUP January 15, 2013.
Standards Break Out Session
ANSI REFRESHER COURSE 2018 CHANGES TO THE ISO DIRECTIVES
Presented to the CEOS WGISS October 22, 2018
ISO TC67/SC4 Annual Meeting
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API Summer Standardization Conference
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 16F API Document – API 16F Chair – George Tisdale Co-chair – Dave Dartford Secretary - None Contact Information – cell National Oilwell.
Developing Standards and Linkage to IECEx
API 16D June 2017 Specification for Control Systems for Drilling Well Control Equipment and Controls Systems for Diverter Equipment Chair – Brian Wright.
ISO Current status of development
API 16 AR Specification for Drill-through Equipment Remanufacturing
ISO TC67/SC4 Annual Meeting
A Global Consensus Process
API SC 10 WG15 Stage Cementing Collars
SCG meeting February 22nd DG on CEA: State of play
Float Equipment API Spec 10F
CSOEM Materials Advisory Resource Group
API SC6 Valves and Wellhead Equipment
2018 Exploration & Production Winter Standards Meeting Subcommittee 10
API 17H TASK GROUP June 26, 2013.
API Specification 16D Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment.
Presented to the CEOS WGISS October 10, 2019
Presentation transcript:

ISO TC64/SC4/WG2 June 2010 status

ISO TC67/SC4/WG2 Documents 13624-1 Drilling well control systems - Design and operation of marine drilling riser systems (API RP 16Q) Current status: published Nov 15, 2009 13624-2 Drilling well control systems - Deepwater drilling riser methodologies, operations, and integrity technical report Current status: published Nov 24, 2009 22830 Drilling and production equipment – Control systems for drilling well control equipment and diverter systems (API Spec 16D) Current status: project once more reinstated, CD ballot closes on July 9, 2010 In the meantime, CD sent to Ed to move to DIS stage Project leader somewhat confused between his role with ISO and API

ISO TC67/SC4/WG2 Documents ISO 13354: Drilling and production equipment – Shallow gas diverter equipment (API RP 64) Current status: - NWIP (N417) vote closed on 2009-04-30 - Meeting held in Houston to boost the project - 3 more months required for CD completion (till year end) - 1 more expert nominated by France (Total)

ISO TC67/SC4/WG2 Documents TS 16339: Drilling and production equipment – Well control equipment for HP/HT drilling operations Current status: - Project launched as NWIP N460 on 2010-03-11 - Voting closed on 2010-06-11 - 10 experts nominated by 7 countries - Project leader from GDF-SUEZ (J. Besson)

Future projects to be launched (2010 / 2011) BOP and associated equipment repair and remanufacturing Current status: - At least 2 people have already accepted to take leadership and contribute to the draft - NWIP to be launched by end 2010 Blowout prevention equipment systems for drilling deepwater wells - Already proposed to API last year in Denver… - NWIP to be launched in 2011 Blowout prevention equipment systems for well servicing activities Current status: NWIP to be launched in 2011