ISO TC64/SC4/WG2 June 2010 status
ISO TC67/SC4/WG2 Documents 13624-1 Drilling well control systems - Design and operation of marine drilling riser systems (API RP 16Q) Current status: published Nov 15, 2009 13624-2 Drilling well control systems - Deepwater drilling riser methodologies, operations, and integrity technical report Current status: published Nov 24, 2009 22830 Drilling and production equipment – Control systems for drilling well control equipment and diverter systems (API Spec 16D) Current status: project once more reinstated, CD ballot closes on July 9, 2010 In the meantime, CD sent to Ed to move to DIS stage Project leader somewhat confused between his role with ISO and API
ISO TC67/SC4/WG2 Documents ISO 13354: Drilling and production equipment – Shallow gas diverter equipment (API RP 64) Current status: - NWIP (N417) vote closed on 2009-04-30 - Meeting held in Houston to boost the project - 3 more months required for CD completion (till year end) - 1 more expert nominated by France (Total)
ISO TC67/SC4/WG2 Documents TS 16339: Drilling and production equipment – Well control equipment for HP/HT drilling operations Current status: - Project launched as NWIP N460 on 2010-03-11 - Voting closed on 2010-06-11 - 10 experts nominated by 7 countries - Project leader from GDF-SUEZ (J. Besson)
Future projects to be launched (2010 / 2011) BOP and associated equipment repair and remanufacturing Current status: - At least 2 people have already accepted to take leadership and contribute to the draft - NWIP to be launched by end 2010 Blowout prevention equipment systems for drilling deepwater wells - Already proposed to API last year in Denver… - NWIP to be launched in 2011 Blowout prevention equipment systems for well servicing activities Current status: NWIP to be launched in 2011