The Proposed TT2A Target Experiment

Slides:



Advertisements
Similar presentations
WP2: Targets Proposed Outline Work Programme Chris Densham.
Advertisements

MERIT Pump/Probe Data Analysis Outline  The pump/probe program  Particle detector response correction  Pump/probe analysis results NFMCC Collaboration.
Harold G. Kirk Brookhaven National Laboratory The CERN Target Experiment Schedule and Budget MERIT Review BNL December 12, 2005.
Harold G. Kirk Brookhaven National Laboratory Targetry Plans and Status MUTAC Review FNAL March 17, 2006.
Target & Capture for PRISM Koji Yoshimura On behalf of PRISM Target Group Institute of Particle and Nuclear Science High Energy Accelerator Research Organization.
Harold G. Kirk Brookhaven National Laboratory MERIT Experiment Status NFMCC Collaboration Meeting FNAL March 17-20, 2008.
Harold G. Kirk Brookhaven National Laboratory The MERIT High-Power Target Experiment Muon Collider Design Workshop BNL December 3-7, 2007.
Collaboration meeting, Ocotober 2005A.Fabich, CERN AB-ATBResponse from the APC, 1 MERIT beam request A.Fabich CERN AB-ATB
13 March MERcury Intense Target (MERIT) Experiment Layout A.Fabich for CERN AB-ATB.
MERIT review, Dec. 2005CERN AB-ATB1 CERN Installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Optical Diagnostics Thomas Tsang tight environment high radiation area non-serviceable area passive components optics only, no active electronics back.
NFMCC Meeting - 13 March 2006 I.Efthymiopoulos, A.Fabich, CERN AB-ATB-EA1 MERcury Intense Target (MERIT) Experiment Installation Issues I. Efthymiopoulos.
Harold G. Kirk Brookhaven National Laboratory Target System Update IDS-NF Plenary Meeting Arlington, VA October 18, 2011.
Harold G. Kirk Brookhaven National Laboratory Target Baseline IDS-NF Plenary CERN March 23-24, 2009.
2.April 2004A.Fabich, H.Kirk Summary for proposal of TT2A target test H.Kirk, A.Fabich March 2004 week 9 morning: Cryogenics,
K. McDonald Muon Collaboration Meeting 19 Mar 2008 Future Target System R&D Analysis (and simulation) of MERIT data is ongoing, but the success of the.
30.July 2004A.Fabich, CERN1 Target R&D A.Fabich, CERN.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos – CERN, AB Dept. Thanks to: A.Fabich, H.Haseroth,
MERcury Intense Target (MERIT) Experiment – or nTOF-11 Mercury System Safety Review Ilias Efthymiopoulos Adrian Fabich (CERN - AB-ATB-EA) Hg-system Safety.
High Power Hg Target Conceptual Design Review Design Requirements, Interfaces, and Schedule P.T. Spampinato V.B. Graves T.A. Gabriel Oak Ridge National.
Videoconference, 3rd May 2005A.Fabich, CERN1 Nitrogen release from the TT2A cryogenic solenoid systems A.Fabich CERN AB-ATB, Switzerland Videoconference,
Harold G. Kirk Brookhaven National Laboratory Recent Results from MERIT NUFACT09 Illinois Institute of Technology July 22, 2009.
The MERIT experiment at the CERN PS Leo Jenner MOPC087 WEPP169 WEPP170.
16.Feb.2005MC meeting, LBNL1 CERN infrastructure A.Fabich, CERN AB-ATB All information available at
Solid Target Options NuFACT’00 S. Childress Solid Target Options The choice of a primary beam target for the neutrino factory, with beam power of
Target Design Meeting Nozzle & Hg Collection Tests, Design Requirements, Instrumentation, Containment, Windows, Diagnostics, Controls, Base Support Structure,
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Muon Collaboration Meeting LBNL February 16, 2005.
Harold G. Kirk Brookhaven National Laboratory The High-power Target Experiment at CERN NUFACT’04 Osaka, Japan July 27, 2004.
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory EMCOG Meeting CERN November 18, 2003.
EURISOL DS Target Meeting, CERN, CHY.KADIMarch 10-11, EURISOL DS PROJECT Task#2: MULTI-MW TARGET 1st year planning Y. Kadi (AB/ATB) European Organization.
KT McDonald MAP Spring Meeting May 30, Target System Concept for a Muon Collider/Neutrino Factory K.T. McDonald Princeton University (May 28, 2014)
Target & Capture for PRISM Koji Yoshimura Institute of Particle and Nuclear Science High Energy Accelerator Research Organization (KEK)
Harold G. Kirk Brookhaven National Laboratory Targetry Concept for a Neutrino Factory Muon Meeting BNL January 26, 2004.
16th March 2005, ENG target A.Fabich, CERN AB/ATB 1 Status of the TT2A target experiment Status of the TT2A target experiment A.Fabich CERN AB/ATB ENG/BENE.
1.Sep.2004A.Fabich, CERN AB/ATBORNL target workshop Workshop on high power targets at ORNL A.Fabich CERN AB/ATB 1. August 2004 message from the research.
KT McDonald MAP Tech Board Meeting Oct 20, The MAP Targetry Program in FY11 and FY12 K. McDonald Princeton U. (Oct 20, 2011) MAP Technical Board.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
10.March.2004, phone A.Fabich 1 Technical drawings of TT2A and adjacent galleries Detail – CDD number Overview surface, ----PDP Overview TT2/TT2A/ISR,
Target and Pion Collection System and Support Facility
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
High Rate Tracking Test Beam Area David Christian & Richard Coleman.
Harold G. Kirk Brookhaven National Laboratory The High-Power Target Experiment at CERN Report to MUTAC LBNL April 25, 2005.
July 2005A.Fabich, CERN AB-ATB1 MERIT (ntof11) experiment: Diagnostics A.Fabich CERN AB-ATB July 2005.
RSVP AGS Upgrade Projects MECO RSVP Preliminary Baseline Review Brookhaven National Lab April 6-8, 2005 D. Phillips.
Risk Analysis P. Cennini AB-ATB on behalf of the n_TOF Team  Procedure  Documents in preparation  Conclusions Second n_TOF External Panel Review, CERN,
MERIT review, Dec. 2005CERN AB-ATB1 CERN installation I. Efthymiopoulos, A. Fabich, J. Lettry CERN AB-ATB MERIT review, Dec.
Harold G. Kirk Brookhaven National Laboratory The E951 Targetry Program Targetry Meeting CERN September 19, 2003.
A. Herlert, CERN PH-IS ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008 ISOLDE scientific coordinator’s report INTC meeting, May 19, 2008.
Target Proposal Feb. 15, 2000 S. Childress Target Proposal Considerations: –For low z target, much less power is deposited in the target for the same pion.
PRESENT AND FUTURE TEST FACILITIES FOR HIGH- INTENSITY TARGETRY CERN I.Efthymiopoulos, CERN with input from Jacques Lettry & Rende Steerenberg.
Harold G. Kirk Brookhaven National Laboratory Muon Production and Capture for a Neutrino Factory European Strategy for Future Neutrino Physics CERN October.
March 2006I.Efthymiopoulos, CERN1 MERcury Intense Target Experiment Installation Issues I. Efthymiopoulos Thanks to: A.Fabich, H.Haseroth, F.Haug, J.Lettry,
The ESS Target Station Eric Pitcher Head of Target Division February 19, 2016.
Target R&D A.Fabich, CERN 30.July 2004 A.Fabich, CERN.
MERcury Intense Experiment Experiment Layout
MERIT Scientific goals and importance
Tungsten Powder Test at HiRadMat Scientific Motivation
News and brief overview of Beamline plans for the next few months
Target and Horn status report
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
Outline: Why now ? What ? How ?
Accelerator R&D for Future Neutrino Projects
The Proposed TT2A Target Experiment
Magdalena Kowalska, CERN PH-SME-IS
Optical Diagnostics tight environment high radiation area
MERIT beam request A.Fabich CERN AB-ATB
Present and Future test facilities for High-intensity Targetry CERN
Advanced Research Electron Accelerator Laboratory
SLHC-PP kick-off meeting, CERN 9 April 2008
Nitrogen release from the TT2A cryogenic solenoid systems
Presentation transcript:

The Proposed TT2A Target Experiment A.Fabich CERN AB/ATB 25.Nov 2004 A.Fabich, CERN AB/ATB

Contents Physics goal Liquid target concept Experiment in TT2A layout subsystems Safety Time schedule Budget http://proj-hiptarget.web.cern.ch/ 25.Nov 2004 A.Fabich, CERN AB/ATB

Target conversion tool withstand the power of multi-MW proton machines Target melting Target vaporization Beam-induced pressure waves Radiation damage Today we use/study solid and liquid targets. Solid targets not viable beyond 1MW proton power. 25.Nov 2004 A.Fabich, CERN AB/ATB

Primary Target Configuration Contained SNS, ESS, MegaPie, … Hot issues: - cavitation - corrosion - beam window Free Surface Super-beam, -factory, … Hot issues: - violent explosion - mechanical challenge - Less experience R&D at Oakridge (US), Juelich (D), Villigen (CH), … 25.Nov 2004 A.Fabich, CERN AB/ATB

Liquid Targets with free surface jet avoid beam window Mercury increased meson yield for high-Z materials, liquid at ambient temperature v~20 m/s live with target rupture and replace target at 50 Hz D= 1-2 cm Optimized for re-absorption of mesons B=20 Tesla collection of secondary mesons ??? What is the impact on the jet by 4 MW proton beam 20 T solenoidal field 25.Nov 2004 A.Fabich, CERN AB/ATB

Experimental results CERN/BNL/GHMFL Magneto-fluid-dynamics Proton induced shocks At B=0 T At B=19.3 T Jet smoothing At B=19.3 T Tip shaping PSB/ISOLDE GHMFL BNL/AGS PS/TT2A NuFact p+/pulse 3 1013 ---- 0.4 1013 2.5 1013 B [T] --- 20 15 Hg target Static 15 m/s jet 2 m/s jet 20 m/s jet status DONE OPTIONAL NOMINAL So far no nominal test: 25.Nov 2004 A.Fabich, CERN AB/ATB

Experimental Site Nufact Study 2 Beam Parameters: Exp. area: E951 16 TP (1012 Protons) per bunch 24 GeV, 1 MW Scenario 32 TP per bunch (x2 rep rate) 24 GeV, 4 MW Scenario BNL AGS capabilities 4 TP per bunch E951 experience 6 to 8 TP foreseen (with bunch merging) No multi-bunch single turn extraction (g-2 rebuild) CERN PS capabilities 5 TP per bunch normal operation 7 TP multi-bunches foreseen (for CNGS) Multi-bunch single turn extraction available 4 bunch flexible fill of PS from booster available (Pump-Probe capability) Exp. area: E951 Exp. area: TT2A provides needed space for in beam and peripheral installation smallest impact on other beam users 25.Nov 2004 A.Fabich, CERN AB/ATB

Installations Solenoid Mercury circuit Diagnostics LN2 supply PS beam nToF target Solenoid Mercury circuit Diagnostics SAFETY Control room Power supply 25.Nov 2004 A.Fabich, CERN AB/ATB

TT2A tunnel 25.Nov 2004 A.Fabich, CERN AB/ATB

High Field Pulsed Solenoid Peter Titus, MIT collecting device for mesons 80 K Operation to optimize for costs 15 T with 4.5 MW Pulsed Power 15 cm warm bore (L=1m) 4.5 ton 25.Nov 2004 A.Fabich, CERN AB/ATB

Power Supply Concentrates on evaluating a solution “available” at CERN (C.Martins): power supply Alice/LHCb 950 V, 7200 A size: ~10 m x 4 m x 3m, 40 tons installed in six pieces transformer (TRASFOR, IT), converter (Schneider Elec., FR) price/piece: 400 kChF to be installed in ISR Recently “old” WA power supply found, which needs refurbishment - evaluation ongoing 25.Nov 2004 A.Fabich, CERN AB/ATB

Cryogenics Solution studied towards TT2A and “permanent” LN2 supply (fixed dewar) , F.Haug Currently designing general layout and flow scheme General safety memo on LN2 use already available Upcoming: first iteration with SC on flow scheme and operation 25.Nov 2004 A.Fabich, CERN AB/ATB

Routing of transfer lines + vent lines magnet dewar warm vent cold vent About 60 m from target place to surface F.Haug, CERN AT/ECR 25.Nov 2004 A.Fabich, CERN AB/ATB

Mercury target System contains Mercury loop Motor optical diagnostics Double containment Pump Reservoir Motor optical diagnostics 25.Nov 2004 A.Fabich, CERN AB/ATB

Diagnostics Optical System Particle detector Direct observation of jet behavior Particle detector Interaction efficiency Primary Proton Beam intensity Beam position Magnetic field 25.Nov 2004 A.Fabich, CERN AB/ATB

Optical diagnostics Fiber panels provide illumination Optical fiber bundles transport the image to a high speed camera 25.Nov 2004 A.Fabich, CERN AB/ATB

Cavitation in Liquid targets Cavitation was already “observed” at ISOLDE Unfortunately only indirect observation by splash velocity No observation of sec.particle yield Does it reduce the secondary particle yield? Most probable not an issue for American NuFact design, but for facilities using “longer” pulses 25.Nov 2004 A.Fabich, CERN AB/ATB

Pump-probe method momentum p = 26 GeV/c 4 bunches within 8 PS buckets at our discretion tpulse= 0.5-2 microseconds tbunch=50ns full length, peak-to-peak 250 ns spot size at target: ~1 mm r.m.s. Pump-Probe method for cavitation studies measure interaction efficiency by Disappearance of primaries Appearance of secondaries 25.Nov 2004 A.Fabich, CERN AB/ATB

Varied parameters parameters to vary: Magnetic field (0-15 T) Pulse intensity (1-2530 1012 p.o.t.) Pulse length (0.5-2 s) Spot size Beam position (5 mm) Total number of protons on target (no tuning): < 3 1015 (~100 pulses) Needs ~2 weeks of beam time Does not include time for beam tuning 25.Nov 2004 A.Fabich, CERN AB/ATB

Other installation items Peripheral layout around TT2A Transport Connection to power network Interlocks, control, timing PS beam control room … 25.Nov 2004 A.Fabich, CERN AB/ATB

Safety Radiation Mechanical safety Mercury LN2 cooling SAFETY CONTACT PERSON FOR ALL MATTERS: Herve Buret Tel.: 160013 (replacement since Oct.2004, former Bruno PICHLER tel: 16 0889 or 73362   Responsible DSO of AB Paolo CENNINI General Safety Bruno PICHLER Radiation Thomas OTTO Gas and Chemicals Jonathan GULLEY Electricity Fritz SZONCSO Emergency stops Magnetic Field Laser Fire Fabio CORSANEGO (material also J.Gulley) Material Mechanical safety Alberto DESIRELLI -- --- --- --- --- also Maurizio BONA Cryogenics Gunnar LINDELL Radiation Mechanical safety Mercury LN2 cooling High magnetic field “Waste” management ----------- Memos available ------------- 25.Nov 2004 A.Fabich, CERN AB/ATB

Safety Radiation (T.Otto) Mechanical safety (A.Desirelli) Integrated number of protons < 3 1015 (minimized) Mercury loop according to ISO2919 Mechanical safety (A.Desirelli) Double containment According to international standards of CODAP2000 or ASME Beam dump (T.Otto) protect nToF target Activation of area and mercury Access to TT2A during PS operation LN2 cooling High magnetic field “Waste” management Mercury returned to ORNL Solenoid shipped to US or Japan Power supply goes with solenoid Contaminated jet loop … and more 25.Nov 2004 A.Fabich, CERN AB/ATB

Issue “solved” yesterday? Safe access to TT2A Close this gap? or install wall? beam stopper to be added to existing two? Issue “solved” yesterday? Interlock sufficient? 2 beam stopper only? dipoles Proposed shielding already installed: Iron z=1.6 m, h=3 m 25.Nov 2004 A.Fabich, CERN AB/ATB

Approval LOI (Nov03) and proposal (May04) submitted to INTC http://cdsweb.cern.ch/search.py?p=intc-2004-016 perform a proof-of-principle test NOMINAL LIQUID TARGET for a 4 MW proton beam in solenoid for secondary particle capture single pulse experiment COMBINE PREVIOUS TEST SERIES Participating Institutes BNL CERN KEK MIT ORNL Princeton Univ. RAL INTC (spring) and research board (July): “… recommended for approval, but … … further information on the support for the proposed test from the relevant scientific community, on the safety issues, and on the resources requested from CERN.” Collaboration has answered and waits for RB 2nd December. 25.Nov 2004 A.Fabich, CERN AB/ATB

Budget kChF Solenoid 1183 Power Supply 611 Cryogenic System 390 Hg Jet System 169 Beam Diagnostics 98 Support Services 234 TOTAL 2700 kChF Spent to date 1000 kChF Including local manpower: 1 man*month=10kChF 25.Nov 2004 A.Fabich, CERN AB/ATB

Time schedule 2003 2004 2005 2006 2007 April final run at PS start-up Autumn LOI 2004 March detailed study at CERN (ongoing) Spring solenoid constr. launched Spring proposal to INTC 2005 January solenoid delivered to MIT Spring purchase of power supply Summer solenoid test finished 2006 January Construction of mercury loop Winter installation at CERN during shut-down 2007  April final run at PS start-up 2 weeks of PS beam time Does not include beam tuning 2 weeks of removal and reinstallation for nToF operation 25.Nov 2004 A.Fabich, CERN AB/ATB

Summary Studies on solid targets are ongoing, but these are not suitable for a beam power >1.5 MW Step-by-step R&D on liquid jet targets has been very successful. needed proof-of-principle test jet target in a magnetic field exposed to a proton beam B = 0 Tesla corresponds to target option for e.g. super-beam, Eurisol, …. TT2A is a highly suitable location Major technical and safety issues have been discussed and positively concluded Waiting approval of research board 2nd December 25.Nov 2004 A.Fabich, CERN AB/ATB

discussion Access during PS operation Beam parameters NO access would be a show-stopper Beam parameters Spot size Maximum beam momentum Maximum beam intensity Maximum pulse length Temporary modification of beam line Remove some beam elements Installation/reconnection of a quadrupole outside FODO Displace quadrupoles Control room space in ISR 25.Nov 2004 A.Fabich, CERN AB/ATB

25.Nov 2004 A.Fabich, CERN AB/ATB