It is now possible to schedule operations based on their finish time

Slides:



Advertisements
Similar presentations
ProgressBook User Start-Up
Advertisements

Topic: Sales Tax and 1099 Reporting
Using VB with MS Applications R. Juhl, Delta College.
Tutorial EBSCOadmin User Groups support.ebsco.com.
Microsoft Office XP Microsoft Excel
Editing Your Faculty Homepage  This tutorial will go through the steps for editing your Faculty homepage.  Thank you to Ryan Vyborny for letting me use.
How to use a scanner Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic.
DNR-322L & DNR-326.
FASET Refresher Welcome to the FASET Refresher course. The following screenshots will take you through the basic FASET Demo. Because this is a slide show,
Payment History Wizard June 20, Payment History Wizard  Payment history can be entered in ACT 7 for prior years by using the Addback wizard. 
© by Pearson Education, Inc. All Rights Reserved.
© Siemens Product Lifecycle Management Software Inc. All rights reserved Siemens PLM Software Solid Edge ST4 Training Virtual components in assemblies.
Computer Assisted Process Design---HYSYS Bo Hu. Introduction HYSYS is only one process simulation program out of a number. Steady State Processes ASPEN.
Managing Multiple Projects Lesson 9. Skills Matrix SkillsMatrix Skill Manage consolidated projectsCreate a consolidated project plan Create dependencies.
A guide for UICET for using Wikispaces.  A wiki is a web page or collection of web pages that can be linked together as a website.  Wikis are often.
By: Amber Shepard   Microsoft Outlook is an client and personal information manager (PIM) that's available as part of Microsoft's Office suite.
Program Guide v25Q3. Overview » Concepts » Workflow  Press sheet  Linking product  Program guide  Publishing a program guide day » Layout configuration.
MagicInfo Pro Scheduler Now that a template has been created from content imported into the Library, the user is ready to begin scheduling content to.
ACTIVITY : 5 BRIDGE COURSE of INFORMATION & COMMUNICATION TECHNOLOGY WORKING WITH WORD PROCESSING SOFTWARE TO PREPARE / FORMAT LETTERS/DOCUMENTS.
Creating Buttons – Lesson 51 Creating Buttons Lesson 5.
PTT303 /2 PROCESS MODELLING AND SIMULATION SEM 1 (2013/2014) Batch Processing Modelling (Component Registration)
WS09-1 VND101, Workshop 09 MSC.visualNastran 4D Exercise Workbook Belted Cylinder.
LANDESK SOFTWARE CONFIDENTIAL Tips and Tricks with Filters Jenny Lardh.
Equipment Rating & Economic Evaluation. Course outline  Equipment rating  Economic evaluation of a flowsheet Engineering economic review Cost factors.
PestPac Software. Leads The Leads Module allows you to track all of your pending sales for your company from the first contact to the close. By the end.
PestPac Software. Overview: Effective with the release of Version 1.38, all payment entry will be done through the QuickPayment Entry screen. The design.
First Second first second first second third fourth.
Start HYSYS then choose “File, New, Case”. On this screen which opens, which is called the “Basis Environment”, click on the “Components” tab on the left.
Case study 2. Session outline  A sequential modular approach to solve for a moderate complex flowsheet  Some common unit operations in biochemical industries:
Training Guide for Residents
June 17, 2009 Office 2007 Tips & Tricks.
Dynamics NAV 2013 Quick Guide 5-4 Fixed Assets
Using Macros, Switchboards, PivotTables, and PivotCharts
WikID installation/training
Setting up Categories, Grading Preferences and Entering Grades
11 Scheduling.
Software project mgt. session # 3– lab manual.
Microsoft Word 2010.
Kratos 3D Structural Analysis Tutorial
Editing Your Faculty Homepage
Microsoft Windows XP Inside Out Second Edition
Lecture 16 SolidWorks Toolbox; Drawings
Word and the Writing Process
Start HYSYS then choose “File, New, Case”
Process Equipment Design and Heuristics – Heat Exchangers
Exercise 1 HYSYS Review 11/12/ Design & Analysis II.
Optimizing Efficiency + Funding
Assistant lecturer Nisreen A. Jabr
Software project mgt. session # 3– lab manual.
Formatting Cells and Ranges
NextGen Utility Billing
Siebel Open UI Features & Updates
Benchmark Series Microsoft Word 2016 Level 2
Lesson Nine: Granting Patient List (Proxy) Access
Technology ICT Core: Spreadsheets.
Start HYSYS then choose “File, New, Case”
New Perspectives on Windows XP
Delete Comments After corrections have been made or you change your mind about something, you might want to delete the comment. Just highlight the comment.
Learning Objectives: Creating a new Table Style
Microsoft Project 2007 Demo Part 2
Bent Thomsen Institut for Datalogi Aalborg Universitet
Spreadsheets and Data Management
Drupal user guide Evashni Jansen Web Office.
ADVANCED THERMODYNAMICS 8th semester
Word Masterclass By Dan Carline.
New Features in Security Management
eBilling Training Service Provider Administrator
Presentation transcript:

It is now possible to schedule operations based on their finish time It is now possible to schedule operations based on their finish time. This is useful for pre-processing activities that must be completed before other operations that are on the critical path. The mode of scheduling (based on Start or Finish time) is selected using the “Start” or “Finish” option in the Schedule box (top of the dialog). Alternatively, the same can be accomplished through the “Scheduling Dependency Link” drop-down menu at the bottom of the dialog. In the past, users were forced to use negative “Time Shifts” in order to represent the equivalent of scheduling based on finish time.

QUICK SCHEDULING OF SLAVE OPERATIONS In batch processing, it is common to have multiple operations running in parallel. A transfer-in operation in a vessel procedure that represents the eluant collection of a chromatography step is a typical example. The transfer-in operation has the same duration and starts at the same time as its corresponding elution operation. The “same duration” constraint is specified in SuperPro using the “Master-Slave Relationship” option for duration specification in the Oper. Cond’s tab. The “same start-time” constraint is specified in SuperPro through the “Scheduling” tab (see figure below). A new button has been added (Sync. With Master…) to expedite the “Same-Start-Time” specification for slave operations. Clicking on the highlighted button will directly set a 'start-to-start' relationship on the timing of this operation with respect to the (already assigned) master operation.

AUTONOMOUSLY CYCLING PROCEDURES In the batch production of commodity biochemicals for which maintenance of batch integrity is not a requirement, it is common to have batch processing steps operating with a cycle time that is not related to the cycle time of the overall process (typically determined by the production fermentors). This is common with chromatography columns operating in SMB (simulated moving bed) mode, membrane filters that need periodic cleaning, rotary vacuum filters that need periodic pre-coating, etc. Basically, this is the case with cyclical units that macroscopically appear to function continuously in a batch process. This mode of operation for a procedure is specified by checking the “Cycles Independently of Main Recipe” button in the Procedure’s Data dialog. More information on the subject can be found in the ReadMe files of the Citric Acid and Lysine examples of SuperPro as well as in the manual and help facility of the application. Procedures that cycle autonomously display a clock icon on the left of their name (see figure below) that denotes their mode of operation. This icon is part of the procedure’s style and can be hidden by de-selecting the “Independent Cycle Sign” check box in the procedure’s icon style tab (right-click on the procedure’s icon and select Style \ Edit…).

Non-Ideal VLE Models Available Everywhere Use of non-ideal models for VLE (vapor-liquid equilibrium) calculations is now available in all streams and unit procedures. In previous versions that functionality was limited to few selected operations (e.g., flash, condensation, and rigorous distillation). Please note that the old short-cut method (based on normal boiling points) is still the default for most operations and streams. For streams, the rigorous option is selected through the Physical State tab of the stream’s dialog by checking the Overwrite box for Physical State (PS) Calculation Options, selecting the Rigorous option and clicking the Edit Rigorous Toolbox Options button. That displays the window shown below that enables you to make the specification. It is possible to exclude certain components (e.g., non-volatile solids) from the VLE calculations by clicking the “Exclude Components From…” button and then identifying the non-volatile components. Please note that excluded components contribute to the energy balance calculations. VLE options for procedures are specified by right-clicking on a procedure icon and selecting “Default PS Calc. Options…”. Please note that it is possible to specify the default rigorous VLE options at the flowsheet level by selecting “Edit \ Process Options \ Rigorous PS Calc. Toolbox…”. For more information on the subject, please consult the manual and the help facility of the application.

HEAT RECOVERY THROUGH VIRTUAL INTEGRATION It is now possible to match operations that require cooling at a high temperature (e.g., the condenser of a distillation column) with operations that require heating at a low temperature (e.g., heating of a raw material stream) without using explicit heat exchangers. That eliminates the utility requirement of one of the two operations and reduces the utility requirement of the other. In addition, it is possible to match a hot operation with a heating utility. This virtual integration is accomplished through the Energy Recovery Opportunities window (Edit \ Process Options \ Energy Recovery…). This functionality enables users to account for energy recovery without creating over-complicated flowsheets (the typical result of using many heat exchangers) that are difficult to converge and understand. Please note that the matching is done between operations or between an operation and a utility. If the objective is to match a hot operation with a cold stream, a heater (not a heat exchanger) must be inserted in the cold stream and then the heater (which represents the heating of the cold stream) can be matched with the hot operation. For more information on the subject, please consult the ReadMe file of the BioDiesel example of SuperPro as well as the manual and the help facility.

Small improvements 1) Remember to mention display of averaged continuous flow for streams in batch processes.