Project Coordination Group (PCG) for the implementation of the MSFD

Slides:



Advertisements
Similar presentations
MARINE STRATEGY FRAMEWORK DIRECTIVE (MSFD) STRUCTURE OF PRESENTATION Summary of MSFD Requirements; EU project management arrangements; Descriptors of most.
Advertisements

The integrated management of human activities under the Marine Strategy Framework Directive Carlos Berrozpe Garcia European Commission (DG ENV) Greenwich,
The Marine Strategy Framework Directive 17th March 2010, Newcastle North Sea Stakeholders Conference Leo de Vrees European Commission (DG Environment,
Implementation process at EU level Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – submitted to EMECO meeting -
Stela Barova, senior expert, “Marine environmental protection and Monitoring” Department, “Plans and Permits” Directorate State of play of MSFD implementation.
Moving away from the fish-eye view Integrating Surveys for the Ecosystem Approach 29 May 2013, Ingeborg de Boois (WGISUR)
Regional experiences, case of the Mediterranean Sea
Project Coordination Group (PCG) for the implementation of the MSFD
Marine Strategy Framework Directive (MSFD)
DG Environment, Unit D.2 Marine Environment and Water Industry
Revision of Commission Decision 2010/477/EU
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD CIS SCG meeting of 11 March 2009.
JRC’s Follow-up work to improve GES assessment
Marine Strategy Framework Directive Common Implementation Strategy
Marine Strategy Framework Directive Competence Centre
CGBN Co-ordination Group for Biodiversity and Nature
Technical guidance for assessment under Article 8 MSFD
Marine Strategy Status
European Commission DG ENV Unit C1 Water
Draft CIS work programme
Draft CIS work programme
19th meeting of the WG GES 22/03/2018
Proposal for MSFD risk-based approach project in OSPAR region
European Commission DG Environment
MSFD list of criteria elements
DG ENV/MSFD 2018 call for proposals
Marine Strategy Framework Directive (MSFD)
Technical Subgroup on Marine Litter
Francesca M. SOMMA - EC - DG JRC MSCG Meeting – Brussels,
Preliminary methodology for the assessment of Member States’ reporting on Programme of Measures (Article 16) WG DIKE Sarine Barsoumian (12/10/2015, Brussels)
WFD, Common Implementation Strategy   Water Scarcity and Droughts Expert Network Brussels, July 2, 2009.
DG Environment, Unit D.2 Marine Environment and Water Industry
MSFD list of criteria elements
Information on projects
WG GES, 6 December 2016, Brussels
DG Environment, Unit D.2 Marine Environment and Water Industry
Marine Strategy Framework Directive: implementation process at EU level Gert Verreet – WFD WG Reporting - 31 March 2009.
WG GES: Decision review progress
Marine Litter DG ENV C2 direct projects Progress report
Green Paper on Adaptation and
DG Environment, Unit D.2 Marine Environment and Water Industry
A Sea for Life The Marine Strategy Framework Directive
MSFD - Technical Group on Marine Litter Progress and future work
DG Environment, Unit D.2 Marine Environment and Water Industry
A Sea for Life MSFD related projects under Integrated Maritime Policy
Working group on data & information sharing DIS under CIS of WFD
Reporting Working Group, 25 March 2014
European Commission, DG Environment, Marine Unit
Project Coordination Group (PCG) for the implementation of the MSFD
Draft CIS work programme
Finalisation of study report
Scene setter European Commission DG Environment
DG Environment, Unit D.2 Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
WG GES Drafting Group June 2013 Berlin
DG Environment, Unit D.2 Marine Environment and Water Industry
Marine Environment and Water Industry
DG Environment, Unit D.2 Marine Environment and Water Industry
Joint meeting of WG’s DIKE, GES, POMESA 27 April 2017, Brussels
WG A ECOSTAT Draft Mandate
DG Environment, Unit D.2 Marine Environment and Water Industry
WFD Expert Group on agriculture A new mandate for
Assessment scales and aggregation
Marine Environment and Water Industry
Date and venue: 23 September, MSFD PCG, DG Environment, Brussels
Finalisation of study report
Preparatory meeting for the establishment of the Project Coordination Group (PCG) for the implementation of the MSFD 13 November :00-13:30 European.
Marine Strategy Framework Directive Strategic discussion on the future role of WG GES WG GES, 5-6 March 2013 European Commission, DG Environment, Marine.
Item 4 b) Marine Strategy Framework Directive and CIS WFD
Project Coordination Group (PCG) for the implementation of the MSFD
Presentation transcript:

Project Coordination Group (PCG) for the implementation of the MSFD 11 March 2013 10:30-17:30 European Commission, DG Environment, Marine Unit © iStockphoto

Agenda: 1. Establishment of PCG (approval of terms of reference by Marine Directors, nominated PCG members) 2. Latest information on Projects under IMP (progress on specific contracts under the three IMP framework contracts) and new ideas 3. Thematic clustering: Marine Litter - on going and finalised projects 4. Ongoing and future work/projects in contribution to the MSFD: a) JRC b) EEA c) ICES 5. Developing science/policy interface: Presentation of "STAGES" Project and JPI "Oceans" 6. Dissemination of finalised projects: how to improve dissemination 7. Next steps and planning for 2013 8. Any other business

3 Framework contracts (FRAs) 2. Latest information on projects under IMP 3 Framework contracts (FRAs) FRA on services related to coordination between the different marine regions in implementing the ecosystem approach FRA on support for the development of methodological standards in relation to good environmental status of the seas under the MSFD FRA on emerging pressures, human activities and measures in the marine environment (including marine litter) Technical work starts through specific assignments within each FRA. Several contracts have been launched or are in the pipeline (see next slides)

Marine Conference in the beginning of 2014 (signed) 2. Latest information on projects under IMP Within FRA on services related to coordination between the different marine regions in implementing the ecosystem approach Analysis of RSC needs ensuring better coherence of approaches under the MSFD (signed) Analyse RSC needs for support in relation to MSFD implementation, and make recommendations on future areas of work where support may be needed, including on the practical means to be used, up to 2020, with a focus on the next four years; consider needs of each individual RSC and coherence among different RSCs Marine Conference in the beginning of 2014 (signed) Preparation of a conference (two days maximum) on work undertaken under MSFD, paying specific attention to RSC work and their contribution to MSFD implementation. Presentation and discussion of the results of the Commission's Article 12 report with representatives from all contracting parties of the four RSCs, their secretariats and experts from organisations working closely with them. Approximately 300 participants are expected. The event will take place in Brussels.

2. Latest information on projects under IMP Within FRA on support for the development of methodological standards in relation to good environmental status of the seas under the MSFD Conceptual document on coherence scales and aggregation rules for assessment and monitoring of GES (in evaluation process) Analyse and compare the national approaches per descriptor regarding scales for assessment of state, determining GES and setting environmental targets. Comparison with regional approaches and methods applied in research projects Identify issues that require further consultation by MS, RSC and the EC. Develop a conceptual document for coherent geographic scales and aggregation rules in assessment and monitoring of GES. This work will feed into WG GES and will be carried out in close collaboration with the WG GES (in particular their co-leads) as an input to the work mandated by the Marine Directors.

2. Latest information on projects under IMP Within FRA on emerging pressures, human activities and measures in the marine environment (including marine litter) Administrative, organisational and logistic support for the Technical Sub-Groups on Marine Litter and Underwater Noise. Implementation started This task includes the successful preparation and organisation of 9 events (meetings of the TSG Noise and TSG Litter and workshops) including all necessary reports to WG GES/MD. EU baseline and target setting for marine litter including Cost-Benefit assessment (under consideration) The results of this contract shall be presented for each region, including an analysis of sub-regions and per Member State in the region, as appropriate. A final report should be presented following the consultation and verification phase.

Guidelines for sustainable aquaculture development(under preparation) 2. Latest information on projects under IMP Within FRA on emerging pressures, human activities and measures in the marine environment (including marine litter) Guidelines for sustainable aquaculture development(under preparation) The objective of the contract is to provide background information and support for the development of EU broad guidance on aquaculture development addressing sustainability and environmental protection, in particular the requirements of the WFD and the MSFD and organize a debate with MS on this. This activity will be a follow up to the Sustainable Aquaculture Guidelines which the Commission will present shortly, as part of the Blue Growth actions.

2. Latest information on projects under IMP Other initial ideas for topics for FRA contracts to be explored in a second phase (2013) could include: IT management sharing information flows between RSCs; PCG coordination , information exchange platform, Modelling of impact and pressures – toolbox for marine policy, Invasive species, Identification inventory of marine pressures, Cost effectiveness of measures, Information platform for cost effective measures for marine pressures, Impacts from climate change on European seas. Feedback and additional ideas from PCG welcome.

C. Progress on other relevant DG ENV projects: 2. Latest information on projects under IMP C. Progress on other relevant DG ENV projects: Support action by the Joint Research Centre – under finalisation Support action by ICES – under finalisation IMP project: "Sharing of best practices on integrated coastal zone management (ICZM), in a context of adaptation to climate change in coastal areas" –contract signed Parliamentary Pilot project — new knowledge for an integrated management of human activity in the sea (proposals under evaluation) Parliamentary Pilot project — marine litter removal (pilot project on assessing best practices and starting business cases for litter removal, incl. ghost nets): Implementation started.