LARP Collimation – Engineering & Analysis

Slides:



Advertisements
Similar presentations
UNIT 13 : HEAT 13.1 Thermal Conductivity 13.2 Thermal Expansion.
Advertisements

Coll Eng E Doyle 1/18 LARP Phase II Secondary Collimator RC1 Prototype Engineering Status 6/21/06 Jaw-hub-shaft concept - continued Permanent.
Longitudinal Expansion of RFQ Vane Ends at Section-to-Section Interface.
MAGSEAL 101. Rotary face seal that utilizes magnetic attraction force to positively mate the optically flat seal faces. Magnetic attraction force variation.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
24/01/08Energy deposition, LIUWG, Elena Wildner1 Upgrade phase 1: Energy deposition in the triplet Elena Wildner Francesco Cerutti Marco Mauri.
April 27-28, 2006/ARR 1 Support and Possible In-Situ Alignment of ARIES-CS Divertor Target Plates Presented by A. René Raffray University of California,
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
SAM PDR1 SAM LGS Mechanical Design A. Montane, A. Tokovinin, H. Ochoa SAM LGS Preliminary Design Review September 2007, La Serena.
SLAC Phase II Secondary Collimators 6 October 2005 LARP Collaboration Meeting-St. Charles, IL Tom Markiewicz SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator.
Beam LARP Rotatable Collimator Mechanical Engineering Discussion 03 October 2008 Phase II CERN ME Video Mtg. Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC.
1 Calorimeter Thermal Analysis with Increased Heat Loads September 28, 2009.
Design of the Photon Collimators for the ILC Positron Helical Undulator Adriana Bungau The University of Manchester Positron Source Meeting, July 2008.
Pixel Support Tube Requirements and Interfaces M.Olcese PST CDR: CERN Oct. 17th 2001.
Calorimeter Analysis Tasks, July 2014 Revision B January 22, 2015.
MARS 2 Design Review-Optomechanical Review 07 Nov 2002 GLW1 MARS 2 Mechanical Design Review.
Ultra-Compact Electrical Machines for Wind Energy DE-FOA : Demo Machine C. L. Goodzeit and M. J. Ball May 1, 2014 Part 1: Design and Construction.
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 06 June 2006 No 1 /17 LARP Phase II Secondary Collimator RC1 Collimator Test Program Plan Forward Revised.
Status of Phase II Energy Loss Studies 1. FLUKA with “simple” CERN-provided input file modeling ~40m around primary collimators used for all SLAC studies.
NML High Energy Beam Absorbers and Dump 29-August-2011 Beams-doc-3928.
The SLAC Phase II Collimator Program 15 June 2005 CERN Team Visit Tom Markiewicz SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
NLC - The Next Linear Collider Project NLC Beam Delivery Lehman Review, May 1999 Vacuum System Cost Model Presentation by Leif Eriksson.
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
Collimator and beamline heating External Review of the LHC Collimation Project CERN Wed 30/6/2004.
1 LARP Collimator Engineering E. Doyle 2/3/05. 2 Review: SS Thermal Simulation 150mm OD 25mm wall Simply supported Heat: 1hr beam life, FLUKA results,
LARP LHC PHASE II SECONDARY COLLIMATOR CD1 REVIEW. - E. Doyle 15 Dec /25 LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 Prototype Engineering.
LARP Coll. Video-conf. May 12, '05Phase II Collimator Engineering - E. Doyle1/20 Adapting the NLC Consumable Collimator to LHC Phase II Secondary Collimation.
Phase II Collimators for LHC Upgrade at SLAC - Material Issues E. Doyle 03 Sept /25 Workshop on Materials for Collimators CERN 2007/09/03 Phase.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP Rotatable Collimators 19 June 2006 ILC R&D Status Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research Program.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 30 Jan 2007 No 1 /13 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 8 Internal flow.
accident deformation – doyle 1/12 Phase II Collimator - Accident Deformation Simulation December 11, 2006.
LARP Phase II Secondary Collimator Status Report SLAC ILC R&D Summary Meeting 24 April 2006 T. Markiewicz/SLAC.
Chopper Beam Dump Thermal Problem 10/27/20101PX Linac FE Technical Discussions.
Halo Collimation of Protons and Heavy Ions in SIS-100.
LARP Collimation – Engineering & Analysis
Hervé Allain, R. van Weelderen (CERN)
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Hervé Allain, R. van Weelderen (CERN)
LARP Phase II Secondary Collimator RC1
Micro-channel Cooling
LARP Phase II Secondary Collimator RC1
Problem: A kicker failure can deposit 9 x 1011 protons on any metallic
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Hervé Allain, R. van Weelderen (CERN)
2th EuCard Col/Mat WP Meeting
Compact and Low Consumption Magnet Design The DESY Experience
Challenges for FCC-ee MDI mechanical design
Status of energy deposition studies in IR3
Recommendations of 12/16/05 review committee & SLAC response
¼ meshed models for Omega3P calculations
Upgrade phase 1: Energy deposition in the triplet
accident deformation – doyle (rev1) 1/8
Phase II Collimators : design status
Cooling aspects for Nb3Sn Inner Triplet quadrupoles and D1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Rotatable Collimators for LHC Phase II Collimation
LARP Phase II Secondary Collimator RC-1
US LHC Accelerator Research Program
Micro Status Report of SLAC Phase II Plan Tom Markiewicz SLAC
RC1 Prototype Conceptual Design Review 15 December, 2005
LHC Collimator – RF Contact Concept (180o wrap)
Engineering Update E. Doyle 5/16/06
LARP Phase II Secondary Collimator RC-0 and RC-1
US LHC Accelerator Research Program
accident deformation – doyle 1/8
Phase II Collimator, Alternative Jaw Simulations
Presentation transcript:

LARP Collimation – Engineering & Analysis Adapting the NLC Consumable Collimator to LHC Phase II Secondary Collimation BEAM 2 BEAM 1 LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

LARP Collimation – Engineering & Analysis Overview Review NLC consumable collimator Compare NLC & LHC requirements Conceptual design: NLC collimator as adapted to LHC Thermal performance of candidate materials Unresolved issues LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

NLC Consumable Collimator BPMs (not shown) at inlet & outlet Aperture is sole internal degree of freedom. Movers align collimator to beam as sensed by BPMs LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

NLC Consumable Collimator Heat dissipated by radiation. DT = 42C @ 10W/jaw Rigid datum structure aligned to beam by BPMs Aperture control mechanism: Thermal effects limited to small region LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Phase II Collimator Engineering - E. Doyle NLC Test Unit Cutaway Aperture support one end of rotor only Dual ball bearings preloaded for tilt-stability LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Phase II Collimator Engineering - E. Doyle NLC Aperture-control Mechanism Located at one end of rotor only. Tilt–stability not well controlled in test unit. LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Phase II Collimator Engineering - E. Doyle NLC Aperture-Defining Geometry One independent variable (stop roller spacing) defines aperture. s = stop roller spacing LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Major Differences - NLC & LHC Specs Specification NLC LHC Comments beam pipe ID 1cm 8.4cm Spatial constraints due to beam spacing jaw length ~10 cm 120 cm jaw tilt-stability gap range 0.2 – 2.0mm 0.5 – 60mm Spatial constraints SS power, per jaw ~1W – 10W ~1kW – 10kW (material dependent) LHC requires water cooling LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Phase II Collimator Engineering - E. Doyle LHC Collimator Mechanism Concept Basic NLC design morphed to fit LHC constraints Jaws hidden to show structure 1.2m long jaws, 150mm diameter Helical coolant supply tubes flex, allow one rev of jaw Aperture supported a both ends for stability, tilt adjustment Also shown: aperture support at jaw center thermal deflection away from beam no tilt control LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Thermal Distortion ANSYS Simulations 10 s apertures beam 150mm OD, 25mm wall, 1.2m long Simply supported FLUKA heat generation for 10x10x24 rectangular grid mapped to similar area of cylinder Steady state: 1hr beam lifetime Transient:10 sec @ 12 min beam lifetime I.D. water-cooled 20C, h=11880 W/m^2/ Various materials: Al, 2219 Al, Be+Cu, Cu, Invar, Inconel Ti, W rejected based on 2-D analysis Variations limit cooling to 45o arc solid cylinder jaw cut in two shorter pieces Cu, 61C support dx=221 um support LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

360o cooling of I.D. 45o cooling arc Note transverse gradient causes bending Note axial gradient 61C 89C Note more swelling than bending support dx=221 mm Spec: 25mm dx=79 mm 64% less distortion support LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Phase II Collimator Engineering - E. Doyle Material Comparison for SS & Transient Thermal Deflection Green: meets alternative spec of 50um (SS) and 200um (transient). Notes: BeCu is a made-up alloy with 6% Cu. We believe it could be made if warranted 2219 Al is an alloy containing 6% Cu Cu/Be is a bimetallic jaw consisting of a 5mm Cu outer layer and a 20mm Be inner layer Cu – 5 mm is a thin walled Cu jaw Super Invar loses its low CTE above 200C, so the 152um deflection is not valid LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Jaw Materials - discussion Only graphite meets the 25um deflection spec for both operating cases. Be-containing jaws meet the spec for the SS case but not for the transient. Be is unacceptable for environmental/safety reasons. Al benefits from the reduced (45o) cooling arc. nearly meets the spec for SS condition Excessive deflection for the transient What next? Divide jaw in shorter sections Use center-of-jaw aperture stops - jaw deflects away from the beam Revisit materials not modeled in 3-D: W & Ti LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Effect of shortened jaws, dense material, carbon pre-radiator Notes: Aperture transition from 10s to 7s 7s cases based on CERN ray files for interactions in TCPV pre-radiator – Phase I carbon collimator concentrates energy deposition toward front of Phase II jaw. LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Shortened jaws/dense material - discussion Dividing jaws beneficial Short front jaws more swelling than bending Cu jaws nearly meet relaxed specs W jaws look good, but: temperatures and power densities very high (cooling system) deflections much greater if referred to jaw centerline What next? Increase cooling arc in W jaws Simulate single 48cm W jaw Calculate cooling system loads LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Conceptual design - coolant channels Limited cooling arc: free wheeling distributor – orientation controlled by gravity – directs flow to beam-side axial channels regardless of jaw angular orientation. Far side not cooled, reducing DT and thermal distortion. 360o cooling by means of a helical channel. Lowers peak temperatures but, by cooling back side of jaw, increases net DT through the jaw, and therefore thermal distortion. Could use axial channels. LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Conceptual design - Stop Roller Details Ball nut (turned by actuator outside vacuum chamber). Ball screw (stationary) Thrust bearing Hole for beam passage As shown in current model: aperture range limited to ~ 10mm. This can be improved but this mechanism will not be able to produce the full 60mm aperture. Auxiliary jaw retracting mechanism needed. Also note vulnerability of mechanism to beam-induced heating. LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Beam’s Eye View of Aperture Mechanism Jaw retracted, aperture ~60mm LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Geometrical limits due to 150mm rotor, 224 mm Beam Axis Spacing 30mm jaw travel (in red) causes jaw to intersect adjacent beam pipe. No space for vacuum chamber wall. Resolution: 1) smaller jaw diameter 2) vacuum envelope encloses adjacent beam pipe 3) less jaw motion 4) reduce diameter of adjacent beam pipe. LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Alternate Stop-Roller Design LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Status of Phase II LHC Collimator Concept Deflection spec will be very hard to meet Relax deflection spec Allow use of Be Reduce jaw length Aperture stop mechanisms vulnerable to beam heating/damage Relocate ball screw outside beam path – like NLC (jaw ends only) Stop rollers unavoidably within region of beam pipe Combine NLC rotary jaws with LHC positioning mechanism Space limitations prevent 60mm max aperture with 150mm o.d. jaws Reduce jaw diameter Will likely increase deflection Adversely affects aperture stop mechanism Reduce opposing beam pipe diameter Include a pass-through for the opposing beam in the collimator vacuum chamber Reduce the maximum required aperture LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle

Status of Phase II LHC Collimator Concept - continued Cooling system loading is problematic for dense jaw materials Other engineering issues Jaws must fully retract in power-off condition Spring load jaws outward. Inward-forcing springs (necessary in any case) sized to overcome outward-forcing springs and grounded on solenoid or pneumatic device which gives way when power is off. Design of flexible coolant supply tubes Manufacturability of jaws (material dependent) How to apply heat loading for testing Rotor indexing mechanism LARP Coll. Video-conf. May 12, '05 Phase II Collimator Engineering - E. Doyle