Publish Daily Schedule Prior to Work Execution

Slides:



Advertisements
Similar presentations
Planning Your web content
Advertisements

© 2009 Eventure Events. All rights reserved. Best Practices in SAP PM Greg Olynyk Catalyst Paper Inc.
© 2009 Eventure Events. All rights reserved. Best Practices in SAP PM Greg Olynyk Catalyst Paper Corporation Ltd.
MAINTENANCE PLANNING AND SCHEDULING
Intracompany Stock Transfer Scenario Overview
SE429 Maintenance Planning and Control.
eRecruit Focus Group – September 2010
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
MATERIALS STAGING AND TRACKING Session 3605 Gary Zien Bayer Corporation Pittsburgh PA.
©© 2013 SAP AG. All rights reserved. Scenario/Processes Make-to-Stock Scenario Overview Planning Supply Initiating Production Executing Production Processing.
Trusted IT Group. The challenge: 40 active, concurrent IT projects  Unsatisfactory Project Delivery.
CASE STUDY EXAMPLE Work Process Flow Charts. WORK IDENTIFICATION / WORK ORDER PROCESSING Review Notification Asset Coordinator Notification complete and.
By: Catherine Mendoza. Evaluate Implement Develop Analyze Design.
INSPECTION OF SCHEMES. PROCESS OF EARLIER INSPECTIONS INSPECTION TEAM VISITS GRAM PANCHAYATS. ASKS FOR SCHEMATIC DOCUMENTS. FILLS THE INSPECTION FORMAT.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
Crew Scheduling By Jeff Fisher. CREW SCHEDULING Project priorities: Get the job done and done right Effectively Quality Efficiently Economically Safely.
Plant Display Operational & Admin Procedures Present PracticeAdditional Safeguards and Measures 01 Sales give quote through or by hand. Sales to.
Texas Nodal Program ERCOT Readiness Update TPTF June 23, 2008.
Transportation Planning EIN 5346 Enterprise Systems Optimization Fall, 2015.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
7-1 Copyright © 2005 Prentice-Hall Chapter 7 Planning and Goal Setting Management: A Skills Approach, 2/e by Phillip L. Hunsaker Copyright © 2005 Prentice-Hall.
Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS.
Project Management Techniques for Efficient Audit Projects Shanda Miller County Performance Auditor Lane County, Oregon October 2015 ALGA Regional Training,
Production Planning and control – ME 1009 Unit 1 Introduction.
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Hour Savings Calculator Cost Savings Calculator
Chapter 9 Production Planning and Control
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Make-to-Stock Scenario Overview
Causal Analysis & Resolution (CAR) Support Category
CONTRACT ADMINISTRATION
Maintenance Scheduling
Commit and Adapt with Whole Mine Schedules (Weekly, Daily, Shiftly)
Small Sites Planning & Scheduling
Intracompany Stock Transfer Scenario Overview
Instructional Design Gibran Carter.
Make-to-Stock Scenario Overview
ESAC 2017 JWST Workshop NIRSpec MSA Planning Tool (MPT)
Intracompany Stock Transfer Scenario Overview
MAINTENANCE PLANNING AND SCHEDULING
Website Booking & S/I/ VGM
Quality Management Systems – Requirements
Training Meetings TC 22-6 / FM SSG Millington
How to Prioritize Your Day
Enhancement Notification Release 5.4
How to Make a Difference
Scheduling Gas Maintenance & Construction Resources AGA Workshop – Resource Management & Work Forecasting Artie Georgacopoulos Director - Resource Planning.
Independent Monitoring of the Switch
Website Booking & S/I/ VGM
2. It Prepares YOU to be more Safety Aware
Vacancy – Production Coordinator (Goods In)
Company Name Date - Time
Intracompany Stock Transfer Scenario Overview
Lawson ProcessFlow Overview and Actual ProcessFlow Solutions
Day in the life – Small Business Owner
Order Processing and Requisition Accelerator
Determine Planning Level
Issue Escalation – Trigger Points
Adaptive Product Development Process Framework
Software Engineering Practice: A Generic View
Senior Project - Part II
!Sell Basics: How to use the system
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
IMPLEMENTATION ,EVALUATION AND MAINTENANCE OF MIS
Why LPA’s? LPA’s can provide low cost system for finding problems and making improvements in Safety, Quality, Delivery, Cost and Morale when used effectively.
Alternative Testing.
Click Here.
Information system analysis and design
Project Name Here Kick-off Date
Presentation transcript:

Publish Daily Schedule Prior to Work Execution DAILY MAINTENANCE PLANNING, SCHEDULING & EXECUTION Notification Created E-JOBS LEGEND Operations Initial Planning (Complete w/in 48 hrs. of receipt) Planner Materials Coordinator Scheduler 1) Verify Need 2) Create Order 3) Requisition Long Delivery Parts 4) Create Operations and Assign Resources 5) Assign Scheduling Category (Priority) Emergency Constrained (Set constraint Date) Prioritized (A,B,C or D) Flex 6) Define Planning Category No Parts, No Job Instr. (Simple) Stored Plan w/Parts - No Changes Detailed Planning Required Maint. Supervisor Mechanic Acquire Material 1) Check Availability 2) Place Orders & Get Delivery Commitments for non-stock 3) Check for Required Date 4) Remove AWP Designation when Parts are here Detailed Planning 1) Evaluate Improvement Opportunity 2) Task List Available or Needed? 3) Specify Parts 4) Identify & Assign Pre-work Tasks 5) Obtain Supplementary Info Job Instructions Specifications Blank Check Sheets Safety Considerations Tools 6) Revise Resource Requirements Review Backlog Group according to Nearness to target date Weekly Scheduling Meeting with Operations 1) Review proposed schedule for accuracy 2) Make changes as dictated by new operating priorities 3) Review measures Prepare & Publish Weekly Schedule Develop Weekly Schedule 1) Weekly schedule assigns80% of resources to constrained/ prioritized work 2) Weekly list of pick jobs for 20% of resources. Supervisor assigns times 3) Schedule published by Thurs. 3 pm Insert high priority jobs, Then fill out schedule. Supervisor Input Stage Parts Based On Weekly Schedule Mnt. Coord. Input Close Job Publish Daily Schedule For Next Day’s Work List published by 3pm of Previous day Deliver Parts on Day Prior to Work Execution Status Feedback Plan Quality Feedback Mechanic Work Execution Supervisor Assigns Mechanics to Job