Project Planning & Time

Slides:



Advertisements
Similar presentations
Project Management Concepts
Advertisements

Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George.
Chapter 4: Project Management Objectives Define the terms project and project management, and differentiate between project and process management. Describe.
Reproduced with permission from BESTEAMS Managing Your Project: Planning & Time Introductory Project Management Module.
Project Management Session 7
What is Project Management?
Engineering Design Development. Turner College and Career High School.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
Gantt Chart Engineering Design Development. Turner College and Career High School.
Project Management and Scheduling
SA Capstone Requirements and Design Week 10 SYST Winter 2013 Instructors: Jerry Kotuba & Joe Varrasso.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
Software Project Planning CS470. What is Planning? Phases of a project can be mostly predicted Planning is the process of estimating the time and resources.
Using the Logical Framework to Develop Activity and Resource Schedules.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
BIS 360 – Lecture Two Ch. 3: Managing the IS Project.
Management & Development of Complex Projects Course Code - 706
Copyright 2008 Introduction to Project Management, Second Edition 2  Many people have heard the following sayings: ◦ If you fail to plan, you plan to.
Ahmad Al-Ghoul. Learning Objectives Explain what a project is,, list various attributes of projects. Describe project management, discuss Who uses Project.
Lecture 6. Review of Lecture 5 Company strategic planning: mission and objective statements and competitive strategy. Planning Methods: Top-down, Bottom-up.
ISM 5316 Week 3 Learning Objectives You should be able to: u Define and list issues and steps in Project Integration u List and describe the components.
PLANNING ENGINEERING AND PROJECT MANAGEMENT
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Project Planning & Time Building Blocks 1 Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall Semester.
PROGRAM MANAGEMENT MODULE 2 Dr. Nicole Fitzhugh Professional School Counselor Berwyn Heights Elementary.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
Engineering Economics Lecture 18 Project Management 6 January 2010.
Studio 4. Project Planning and Literature Review SPRING 2016 GE105 Introduction to Engineering Design College of Engineering King Saud University.
The Project Management Process Groups
Creating a Work Breakdown Structure with Microsoft Project.
MENG 446 : Management of Engineering Projects
Prof. Shrikant M. Harle.  Scheduling is a process which tries to organize activities in logical sequence.  While it is not possible to know with certainty.
© 2008 Prentice Hall6-1 Introduction to Project Management Chapter 6 Managing Project Scheduling Information Systems Project Management: A Process and.
Managing Your Project: Planning & Time
Studio 4. Project Planning and Literature Review
CMGT 410 aid Education Begins/cmgt410aid.com
A Systems View of Project Management
PROJECT MANAGEMENT TOOLS AND TECHNIQUES
Project Management Systems
By Wilmer Arellano Spring 2010
Managing the Information Systems Project
The Project Infrastructure
Project Management BBA & MBA
Systems Analysis and Design in a Changing World, 4th Edition
Studio 4. Project Planning and Literature Review
Software project mgt. session # 3– lab manual.
Chapter 2: The Project Management and Information Technology Context
“Plan the work. Work the plan.” ~ Old Saying
Project Management.
Defining the Activities
Martha Grabowski LeMoyne College
MGMT 404 Enthusiastic Studysnaptutorial.com
MGMT 404 Education for Service-- tutorialrank.com
ENGINEERING MANAGEMENT (GE 404)
The Features of a Product or System
ENGINEERING MANAGEMENT (GE 404)
MGT 605: CH 04 Defining the Project.
Project Management Process Groups
Studio 4. Project Planning and Literature Review
P ROJECT M ANAGEMENT Skills.
PROJECT MANAGEMENT TOOLS AND TECHNIQUES
Modern Systems Analysis and Design Third Edition
Teaching slides Chapter 13
CAD DESK PRIMAVERA PRESENTATION.
Project Management.
Time Scheduling and Project management
Planning for Design Project
Modern Systems Analysis and Design Third Edition
Information system analysis and design
Presentation transcript:

Project Planning & Time Building Blocks An introduction to the basic project management concepts Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester Van Aken (2001) University Leadership Development, Virginia Tech, Blacksburg VA

What is a Project? A project has a single objective that must be accomplished through the completion of tasks that are unique and interrelated Projects are completed through the deployment of resources Projects have scopes, schedules, and costs and are accomplished within specific deadlines, budgets, and according to specification Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

● In this highly interactive KMU417 Project Planning and Organization course, you’ll walk through the key steps of successful project management - including how to initiate, plan, control, monitor, execute and closeout projects. ● You’ll learn how to create a project plan to ensure all tasks are finished on time, within budget.  ● You will practice creating work breakdown structures to accurately estimate resources, time, cost and risk. ● You’ll also gain strategies for identifying risks and developing plans to minimize, eliminate or handle them. ● Bring your Prof.Dr. Abdurrahman Tanyolaç IV. Young Innovative Entrepreneurs Project with you and be ready to fully participate in this course.  You will immediately incorporate the techniques and templates you learn. Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Identifying a group project for:  Prof.Dr. Abdurrahman Tanyolaç IV. Young Innovative Entrepreneurs Project Competition ∆∆∆ As we move through this KMU 417 Project Planning and Organization course, project themes should be in adherence to the theme of sustainable innovative technologies.  What is your project name?  What is the main goal of your team’s project? Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Project themes may comprise, Genetics Technology, Intelligent Structures, Fail-safe Nuclear Power Plants, Biotechnology For the 21st Century, Revolutionary Materials, Gas Hydrates, Next Generation Batteries Photovoltaics. Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

In the beginning, we know we can manage our projects, but before long…. Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

● You need to know the game plan and fully understand: ● Equipping yourself and your project group members with high-tech tools and software is important, but in order to improve performance, ● You need to know the game plan and fully understand:  The Big Picture  The business context  Their players, assets, and their role in the whole thing  How to develop situation strategies and plans  Assembling all of the elements in a results driven system! Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Engineering projects are multifaceted They consist of complex interdependent tasks  Learn how to use several basic tools  Work breakdown structures  Resource allocation  Gantt charts Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Phases of Project Management Define the project’s scope Develop the project’s plan Implement the plan & control the process Close out the project And never forget: plan a project from the estimate to the operation for maximum return! Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Develop the Project’s Plan Break Down Project Tasks (WBS) Time Estimation & Dependencies Review & adjust Determine Resource Needs Planning is an iterative process. Some projects won’t require a proposal Develop Gantt Chart Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Work Breakdown Structure (WBS) A hierarchical representation of activities It starts with the major project areas to be accomplished It breaks the project areas into actionable pieces of work, segmenting elements into appropriate sublevels Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

WBS* – Activity Levels *Work Breakdown Structure Level 1 – Identify major objective areas or categories Level 2 – Begin to divide the areas into sub-tasks Level 3 – Continue to break down the sub-tasks into actionable items The lowest level associated with a branch in the hierarchy is referred to as a “work package” # of levels depends on project complexity Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

How much detail do you need? Does the WBS contain enough detail to evaluate progress? Do you have clear accountability for each work package? Are there start & end events? Can you easily estimate time & cost? Is there a clearly defined deliverable? Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

● A project work breakdown structure (WBS) is a deliverable or product-oriented grouping of project work elements shown in graphical display to organize and subdivide the total work scope of a project. ● The WBS is a particularly important project tool. Considerable thought and planning should be given to its development and implementation so that subsequent changes are minimized. ● Major revisions to a WBS require both substantial effort and resources, due to its application to a wide array of project activities. Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

WBS DEVELOPMENT ● A WBS is the cornerstone of effective project planning, execution, controlling, statusing, and reporting. ● All the work contained within the WBS is to be identified, estimated, scheduled, and budgeted. The WBS is the structure and code that integrates and relates all project work (scope, schedule, and cost). Therefore, the WBS contains the project’s scope baseline necessary to achieve the technical objectives of the work described. ● The WBS is used as a management tool throughout the life cycle of a project to identify, assign, and track its total work scope. Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

● When initial project funding is received, the Project Director (PD) develops a WBS that identifies necessary funds according to the schedule and needs of the tasks in the WBS elements. ● The WBS is generally a multi-level framework that organizes and graphically displays elements representing work to be accomplished in logical relationships. Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

The Project Director (PD) is to structure the project work into WBS elements (work packages) that are: Definable - can be described and easily understood by project participants. Manageable - a meaningful unit of work where specific responsibility and authority can be assigned to a responsible individual. Estimateable - duration can be estimated in time required to complete, and cost can be estimated in resources required to complete. Independent - minimum interface with or dependence on other ongoing elements (i.e., assignable to a single control account, and clearly distinguishable from other work packages). Integratable - integrates with other project work elements and with higher level cost estimates and schedules to include the entire project. Measurable - can be used to measure progress; has start and completion dates and measurable interim milestones. Adaptable - sufficiently flexible so the addition/elimination of work scope can be readily accommodated in the WBS framework. Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Project Planning Activity Create a work breakdown structure for your project Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Time Duration Managing a project requires awareness of two time frames The amount of effort a task will take (in time), e.g., 3 hours to write a report The calendar span over which the activity will occur, e.g., the report will be done within a week Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Time Estimation If feasible, have person responsible make the estimate Should take into account the resources needed for the activity Do not overestimate to account for everything that can go wrong Keep in mind the concept of self-fulfilling prophecy (A self-fulfilling prophecy is a prediction that directly or indirectly causes itself to become true, by the very terms of the prophecy itself, due to positive feedback between belief and behavior Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Uncertainty in Time Estimates Some activities will take longer and others will go faster than expected Sources of uncertainty: Varying knowledge and skills Individual difference in approaching work Mistakes or misunderstandings Unexpected events (!!) Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Project Planning Activity For each work package, estimate the time duration in days Determine then determine the time duration of each higher level activity Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Identifying Resources To accomplish each activity identified in the work breakdown structure (WBS) requires the use of resources: Personnel (who, how many, their skills) Space (meeting location, lab facilities) Equipment (rent, own, purchase, how long needed) Money (budget limitations) You can interchange Resources (slides 20-22) and Durations (23-25). However, the time estimation may depend on the number of people assigned to each activity Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Assigning Resources Assign resources to the appropriate tasks (personnel, space, equipment, money) Be realistic– no one can be in two places at one time Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Project Planning Activity What are the resources needed for each task in the work breakdown structure (WBS)? Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Dependencies A B Examples of other dependency types: -start to finish Dependencies are the relationships between activities “Finish to Start” example Predecessor Task: A Successor Task: B Arrow head indicates dependency relationship: Task B cannot begin until Task A is complete Examples of other dependency types: -start to finish -start to start -finish to finish A B The most common type of linkage is Finish to Start Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Project Planning Activity Number all tasks in work breakdown structure (WBS) Identify the dependencies between each task Notice at what level you are identifying the dependency. How does the dependency affect higher or lower level activities? Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

The Gantt Chart: A Visual Scheduling Tool Graphically represents work breakdown structure (WBS) information Shows dependencies between tasks, time duration, personnel, and other resource allocations Tracks progress towards project completion Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Building a Gantt Chart - Axes List all tasks and milestones from the work breakdown structure (WBS) along the vertical axis List time frame along the horizontal axis Tasks: Design support columns Select final material Design… You can combine the next few slides into one. This is truly step by step detail that might be to much. Time Frame: day 1 day 2 day 3 Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Building a Gantt Chart—Dependencies For example: Design for a chemical reactor cannot begin until materials are chosen Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Project Planning Activity Based on the WBS (tasks, durations, and dependencies), create a Gantt Chart Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Next Step: Implement the Plan After the plan is complete, everyone should know who is responsible for each activity and when each task must be complete to ensure project success Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Responsibility Matrix Creates accountability by assigning each task to a person Task Yağmur Oğuz Zeynep Activity 1 x Activity 2 Activity 3 Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Project Planning Summary Create WBS to identify activities Estimate time durations Identify resource needs Note dependencies between tasks Schedule activities using a Gantt chart Review plan until you reach agreement Put plan into action! Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Managing Your Project: Planning & Time References Van Aken, S. (2001) University Leadership Development, Virginia Tech, Blacksburg, VA Gido, J., & Clements, J.P. (1999). Successful project management. South-Western College Publishing. 3. Weiss, J.W., and Wysocki, R.K. (1992) 5-Phase Project Management: A Practical Planning and Implementation Guide. Reading, MA: Addison Wesley. Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Managing Your Projects: Time What does it take to create something bigger than yourself? Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Learning Objectives Understand the need for tracking personal time management Conceptualize the difference between managing commitments and managing time Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

What characterizes a project? Comprised of orchestrated activities performed by people to bring something into existence that would not occur naturally Possesses creation and causation Calls people to action Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

How We Think Projects Evolve… Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Methods to Track Time Time management books or schedulers Personal Digital Assistants (PDAs) A piece of paper to write things down Memory What problems do you have in the area of time management? What do you want to get out of this conversation on time management? Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

History of Time How was time measured? Began with light and dark Evolved to Solar and Lunar calendars Humans developed mechanical clocks Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Nature of Time Q: Is time like a sail boat or a motor boat? A: It’s more like a sail boat in a shifting wind Class-room example Vacation Example Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

What Do You Manage? You do not manage time You manage your commitments Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Managing Commitments Determine time Specify place Identify the appropriate resources Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Structures for Time Management Where is the last place you should put your commitments? In your memory Why? How many things can you keep in your memory? What do you remember when you are upset? How long does it take to get upset in your normal day? Need some structure outside of your memory in which commitments can exist Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Commitment Management Exercise List ALL of the commitments you have for the next week. (Look in all areas of your life) What to track? to-dos/meetings/calls Projects/themes Now put everything into a schedule with time/place/resources Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Open Item List Date What Who Resources Date Due Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Weekly Schedule Sun Mon Tue Wed Th Fr Sat 07:00 09:00 11:00 13:00 15:00 17:00 19:00 Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester

Planning Time Windows short-term medium-term long-term Each Window has a different level of clarity and detail Missing any one of these alters how you act Working within these windows will influence engineering project teams Prof.Dr. Ahmet R. Özdural – Class Notes_01 - KMU417 Project Planning and Organization – Fall 2015-2016 Semester