Delivering a production service

Slides:



Advertisements
Similar presentations
1 On the Management Issues over Lambda Networks 2005 / 08 / 23 Te-Lung Liu Associate Researcher NCHC, Taiwan.
Advertisements

ITU-T Kaleidoscope 2009 Innovations for Digital Inclusion
A Possible New Dawn for the Future GÉANT Network Architecture
Guillaume Crenn, Product Line Manager
Network Services and International Collaboration December 11 th 2014, Muscat Alexander van den Hil
Serge Melle VP, Technical Marketing Infinera
Don McAuley Senior Optical Pre-Sales Engineer Interoute Barnard’s Inn London R ESEARCH N ETWORKING FROM AN O PERATOR’S PERSPECTIVE.
GLIF Engineering (TEC) Working Group & SURFnet6 Blue Print Erik-Jan Bos Director of Network Services, SURFnet I2 Fall meeting, Austin, TX, USA September.
Poznan Supercomputing and Networking Center
1 | Infinera Copyright 2013 © Intelligent Transport Network Manuel Morales Technical Director Infinera.
1 Interconnecting the Cyberinfrastructure Robert Feuerstein, Ph.D.
NOBEL WP5 Meeting Munich – 14 June 2005 WP5 Cost Study Group Author:Martin Wade (BT) Lead:Andrew Lord (BT) Relative Cost Analysis of Transparent & Opaque.
Valentino Cavalli Workshop, Bad Nauheim, June Ways and means of seeing the light Technical opportunities and problems of optical networking.
© Ciena Corporation The Path to 100 G Ethernet Martin Nuss VP & Chief Technologist.
Building and Maintaining Regional Optical Networks Gregg Shepperd Principle Services Product Manager, Fujitsu Internet2 Spring Conference April 25, 2007.
Early help – some signals and examples Nick Page 18 March 2013.
Center for Tele-Information Evolution of the Infrastructure Market SERENATE final workshop Bad Nauheim 15/16 June 2003 Knud Erik Skouby CTI/ DTU.
GigaPort NG Network SURFnet6 and NetherLight Kees Neggers SURFnet Amsterdam October 12, 2004.
GLIF Infrastructure Kees Neggers SURFnet SC2004 Pittsburgh, PA 12 November 2004.
Connect. Communicate. Collaborate Hades – Going Operational Roland Karch, RRZE FAU Erlangen-Nürnberg JRA1 Montpellier Meeting, October 2006.
Erik Radius Manager Network Services SURFnet, The Netherlands Joint Techs Workshop Columbus, OH - July 20, 2004 GigaPort Next Generation Network & SURFnet6.
Five Essential Elements for Future Regional Optical Networks Harold Snow Sr. Systems Architect, CTO Group.
Impact of Photonic Integration on Optical Services Serge Melle VP Technical Marketing, Infinera.
Extension to the Link Management Protocol (LMP/DWDM - rfc4209) for Dense Wavelength Division Multiplexing (DWDM) Optical Line Systems draft-dharinigert-ccamp-g lmp-02.txt.
Rob Adams, VP Product Marketing/Product Line Management From Infrastructure to Equipment to Ongoing Operations Reducing the Cost of Optical Networking.
Update on Optical Fibre issues Rainer Schwemmer. Key figures Minimum required bandwidth: 32 Tbit/s –# of 100 Gigabit/s links > 320, # of 40 Gigabit/s.
Connect. Communicate. Collaborate LHCOPN lambda and fibre routing – Episode 3 Michael Enrico Network Engineering & Planning Manager DANTE LHC Meeting,
Deploying 40Gbps Wavelengths and Beyond  Brian Smith.
Networks ∙ Services ∙ People Mian Usman TNC15, Porto GÉANT IP Layer 17 th June 2015 IP Network Architect, GÉANT.
Networks ∙ Services ∙ People Guy Roberts Transport Network Architect, GÉANT TNC16 13 th June 2016 GÉANT Network, Infrastructure and Services.
Networks ∙ Services ∙ People Guy Roberts TNC15, Porto Lessons from Amsterdam-Hamburg field trial Sharing Dark Fibre 15 th June 2015 Transport.
Building Europe Link to Latin America Fernando Liello and Thomas Fryer | BELLA Consortium | 15 June 2016 | TNC2016.
Coherent Alien Waves over a DCM-compensated DWDM network WHY – WHAT – HOW – WHEN … of … a study of performances and possible limitations of the coherent.
Networks ∙ Services ∙ People Guy Roberts GÉANT Network Evolution – Sharing Fibre infrastructure March 8 th 2016 Senior Transport Network.
Bjarke Skjoldstrup Project Manager, TDC A/S, Denmark
Alien Waves as experienced by a System Consultant of a Vendor Robert Waegemans ADVA Optical Networking (ex DANTE, UCL, Ciena, GTS, …) I tried no to give.
Connect communicate collaborate Connecting Helix Nebula EGI Technical Forum Prague Sep Niels Hersoug; General Manager, DANTE Ltd; Project Manager.
Networks ∙ Services ∙ People Mian Usman IP Network Architect, GÉANT TNC16 13 th June 2016 GÉANT Transport Network Evolution.
Connect communicate collaborate Federated POP: a successful real-world collaboration Milosz Przywecki, PSNC TNC2012, Reykjavik, Iceland, Maribel.
AmLight-ExP: Collaboration at 100G
Quantum Key Distribution in the GÉANT network
Strategic Information Systems Planning
LHCOPN lambda and fibre routing Episode 4 (the path to resilience…)
draft-dharinigert-ccamp-g lmp-10
FiberCo/WaveCo Update
GÉANT LHCONE Update Mian Usman Network Architect
SURFnet network upgrade plans for next 5 years
Design and OAM&P aspects of a DWDM system equipped with a 40Gb/s PM-QPSK alien wavelength and adjacent 10Gb/s channels Lars Lange Bjørn, NORDUnet Roeland.
SURFnet6: the Dutch hybrid network initiative
GÉANT2 update - II Otto Kreiter, DANTE.
Networking for the Future of Science
Robert Szuman – Poznań Supercomputing and Networking Center, Poland
LHCONE L3VPN Status update Mian Usman LHCOPN-LHCONE meeting
The SURFnet Project Bram Peeters, Manager Network Services
DWDM TECHNOLOGY PALTEL TOPLOGY FOR PALESTINE
Otto Kreiter 10th Dec LHCOPN meeting
Optical Transport Network (OTN) Equipment Market
Beginner Eligible Services
GÉANT Network Evolution
INTRODUCTION TO DWDM 19-Nov-18 ALTTC/TX-I/DWDM.
GÉANT network Evolution
Flexible Transport Networks
Background Approach Objectives Architecture Status Next Steps.
COMS 161 Introduction to Computing
Alcatel Confidential and Proprietary
Network Technology Evolution
Differentiation in the Age of Optical Convergence TNC 2019, Tallinn
GÉANT Topology Evolution
Spectrum sharing – lessons from workshop
Network Technology Evolution
Presentation transcript:

Delivering a production service Alien waves in GÉANT – Delivering a production service Guy Roberts Senior Transport Network Architect, GÉANT TNC 16, Prague May 14 2016

Agenda Motivation Amsterdam-Hamburg performance Operational experience

Motivation 1 Traffic growth LHCONE Monthly average Gbps Year on year growth Q1 2015 -> Q1 2016 Growth ROUTING only Q1 2015 -> Q1 2016 Growth Including Lambdas 47.70% 26.40%

Motivation 2 Maximize utilization The key to reducing the cost of R&E networks is to achieve high levels of infrastructure utilization. A big part of the cost of transmission is fixed costs: fibre & common equipment. Utilization rates are low in some parts of network, in particular fibre through Spain and Croatia/Slovenia. Value-add for GÉANT of the Infinera equipment is: The flexibility of the OTN layer GMPLS control plane Fast turn up on new services Owning the fibre and amplifiers ourselves adds very little value to our service portfolio but makes services uneconomic where utilization is low.

14,000km of lit dark fibre €8M initial investment and then €2.5M per year.

Amsterdam – Hamburg First GÉANT AW implementation: 5 x 100G The R&E community previously had two parallel fibres between Amsterdam and Hamburg. Yellow fibre is SURFnet, Green is GÉANT. Duplication of infrastructure dilutes utilization. Solution: alien waves Fibre now shared between SURFnet, NORDUnet and GÉANT using AWs GÉANT’s fixed fibre costs are reduced by 2/3 compared to GÉANT only fibre. Eliminating redundant fibre infrastructure

System performance Excellent receive margin Receive sensitivity measured on two wavelengths in each direction on Ams-Ham system Better than 10 dB receive margin in both directions – i.e power into Rx can fall by 10dB before errors are seen 10dB 12dB

Robustness testing Tolerant to input power variation Power injection is reduced at two points: Where the AW signal is injected into the fibre Where the AW signal is injected into the Ciena equipment In both cases the reduction in power did not result in a significant change in the pre-FEC BER. Demonstrates that system is stable under power level changes. Technical contributions from Rob Smets from SURFnet and the GÉANT Operations team

Long term Performance Q-factor Worst Q-factor during the day from 15 minute bins Blue dots direction towards Hamburg, orange in direction towards Amsterdam. The red line shows the threshold at which post FEC errors could start to occur. System is running error free post-FEC in both directions since March.

Long term Performance pre-FEC BER Daily maximum pre-FEC bit error rate from 15 minute bins Blue dots direction towards Hamburg, orange in direction towards Amsterdam. System is running error free post-FEC in both directions since March.

Drawing lines of responsibility Demarcation points Infinera Tx Infinera Rx Ciena ROADM SURFnet owns ROADM, fibre and amplifiers GÉANT owns transponders on DTN-X Demarcation is fibre pair carrying 5 x 100G Amplifier Tx Rx Optical fiber Service Demarcation GÉANT transponders Surfnet: fibre, amplifiers and muxing GÉANT transponders

Alarm management Infinera alarms allow debugging of alien wave Alarms and notification aid debugging: four types signal deterioration can be distinguished If there is a loss of fidelity of the signal, this can be detected using pre-FEC threshold crossing notification If the alien wave becomes so degraded that the Q-factor drops below 10, Infinera will raise a pre-FEC Q out of range alarm A cut in the SURFnet fibre results in a Loss of Frame (LOF) alarm, some signal from the optical amplifiers leaks through, so there will not be a Loss of Signal (LOS) alarm. If the local patching between GÉANT and SURFnet sites is broken, then a Loss of Signal (LOS) alarm is raised. Infinera pre-FEC Q out of range alarm Infinera Loss of Frame alarm

History of outages One planned maintenance and two unscheduled outages Three outages since the system was commissioned: 17 Sept 2015: Unscheduled outage because of new fibre being provisioned by SURFnet where engineer disconnected GÉANT fibre. 24 Sept 2015: Planned maintenance announced by SURFnet 08 Oct 2015: Power failure in one of hut site in SURFnet’s network Information comes from out ticket system There have been no further outages since then. Our Operations team is happy that the level of response from SURFnet to fibre outages matches the level we experience from commercial providers.

Uncertainties What we don’t know yet Licencing model for AWs: works for Ams-Ham, but will this model carry over to other vendors? How well will AWs work when fibre is multi-domain (concatenated between NRENs)? How will vendors respond in the case of performance deterioration (risk of finger pointing)? Can we integrate management systems between vendors? What is the standardization future of AWs – do ‘Black Links’ have a future?

Summary Amsterdam-Hamburg alien wave is saving money for the community by increasing utilization on shared fibre. GÉANT has found the system to be robust and easy to manage. We would like to increase AWs in our network in the future. More experience is necessary with AWs on multi-domain fibre.

Any Questions? Guy.Roberts@geant.org

AW brings savings cf. leased waves with only 2 x 100Gbps Economics of alien waves Actual costs for Ams-Ham AW brings savings cf. leased waves with only 2 x 100Gbps Annualized cost over 3 years in Euros

JRA T1 Next targets for AWs GÉANT fibre leases end in 2020/21 – replacement planning starting now. In SGA1, SA1 identified routes that could benefit from infrastructure sharing: Milan – Geneva on GARR fibre Madrid – Lisbon on RENATER RedIRIS fibre Paris – Lisbon on RENATER, RedIRIS, FCCN, comm. fibre Marseille – Milan on RENATER, GARR, commercial fibre Marseille – Madrid on RENATER, RedIRIS commercial fibre Budapest – Zagreb on NIIF, commercial fibre In SGA2, JRA1 will work with local NRENs to design solutions. Commercial options will also be evaluated. Commercial fibre: Between Bilbao & Bordeaux Between Turin & Grenoble Between Barcelona & Montpellier Between Zagreb & Nagykanzsa Slide: Alexander van der Hil