Daily Drilling Report Phase 2

Slides:



Advertisements
Similar presentations
Collaborating to develop data exchange standards Stewart Robinson DECC UK NDR9 NDR 9 – Breakout session 1.
Advertisements

MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
DDR Modelling Patterns
Copyright © 2006 Software Quality Research Laboratory DANSE Software Quality Assurance Tom Swain Software Quality Research Laboratory University of Tennessee.
In collaboration with Building XML for Daily Drilling Report Arnt Vegard Espeland October 2006.
CALPADS UAT EOY Kick-off Meeting
Managing Projects using Oracle Project Management (PJT) & SPREADSHEETS Neeraj Garg Vice President, Client Services.
TietoEnator © 2003presentationPage 1 Daily production & activity report standardisation Meeting 5-6 april 2005.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
SuccessFactors: Phase 2 Annual Review Process Presented by: Patricia Kelly / VeLonda Dantzler Human Resources Management.
Proprietary and Confidential to Rogers and Accenture 1 Fiber Plant Construction British Columbia Dynamic RFQ Information Session.
22C:082:001 Human-Computer Interaction. Fall Copyright © 2013 Juan Pablo Hourcade. 1 Group Project Phase Three.
The Banner HR User’s Guide to the Affirmative Action Summary Data Form, NZAAADC USNH HR November 2006.
ONUS 3rd External Users Forum Oftel 17th June 2003.
DDR Drilling and Well model Status – core group meeting.
DDR version 1.2 Project meeting - Web Lillian Hella POSC Caesar Association (PCA)
How to Navigate the Class Web Site Mrs. Denyer River Valley High School.
Georgia Department of Human Services Insert Presentation Name Presenter: Presentation to: Date: Georgia Department of Human Services Georgia Division of.
Yao Bo Lu Stavanger, Daily Drilling Report Elements.
Inputting & Updating Programs. To Search by Actv Numb (Activity Number) -Click here -Start typing the # -It will bring up your Program # To Search by.
State of Georgia Release Management Training
Envelopes and Minutes Business Documents. Envelopes  Parts: mailing address, return address  Special Notations: mailing notations (REGISTERED, SPECIAL.
Pål Rylandsholm 16 June 2009 DRAFT DDR Phase 2 Status EPIM RUF meeting June 16th 2009.
Managing multiple projects or services? Have a mix of Microsoft Project and more simple tasks? Need better visibility and control?
Using MS-Project INFS MS-Project: 3 Major Parts 1. Project Planning 2. Project Execution & Tracking 3. Project Reporting.
Daglig borerapport Project meeting March
Slide title :40-47pt Slide subtitle :26-30pt Color::white Corporate Font : FrutigerNext LT Medium Font to be used by customers and partners : Arial HUAWEI.
Welcome We will wait a few minutes for participants to log on and call in. -Call in: Pass code: *6 to mute your line #6 to.
Work shop on Procurement Key-performance indicators with selected implementing entities Public procurement and property administration agency August 2016.
KEEPS – a system for UELMA preservation and security
Register SPID - Retailer
AV Training Presentation 8
REVISIONS DATE SLIDE CHANGE 11/22/10
Productive Marketing with Content Management
Project Management Chapter 3.
Input to project from IIP
Please review these important Webinar Etiquette guidelines
Software Configuration Management
IT Training Webinar Converting to CAS 3.x
EMedical Leadership Demonstration Forest Service (FS) Human Resources Management (HRM) Business Enterprise Solutions and Services Project August 2017.
Welcome! The 2015 B-13 Data Collection webinar will begin in a few moments. Event number: Event password: 2015B13 To hear the presentation.
Formation Date: 9 November 1977 Geo Code: R
THE 2018 RECERTIFICATION P.U.S.H.
Project Management for RIMI
DDR version 1.2 Project meeting - Web
9/18/2018 Department of Software Engineering and IT Engineering
Project Organization Chart Roles & Responsibilities Matrix
MD Online IEP System Instructional Series – PD Activity
MD Online IEP System Instructional Series – PD Activity #7
Raytheon Missile Systems Steve Lacy
Financial Affairs Training Webpage Redesign
Online Claim Submission – Enhancements/Internal Training
Car Hire Data Exchange (CHDX) Edits Project Update
Computer Software Usage Computer Support for Project Management
Agenda Action Review Update on IX and iGT access Testing strategy
Verification of Answer Documents (formerly Tested Roster)
Daily Drilling Report Phase 2
CCIMM/JCIMS Audit Readiness
Employee engagement Delivery guide
Verification of Not Tested
OAKS Online Last updated: 08/20/09.
EPIM RUF meeting June 16th 2009
Ctclink executive leadership committee May 31, 2018
Integrated Program Management
Cases Admin Training.
Project Iterations.
(Project) SIGN OFF PROCESS MONTH DAY, YEAR
Formation Date: 9 November 1977 Geo Code: R
Formation Date: 20 November 1993 Geo Code: R
Formation Date: 14 November 2003 Geo Code: R
Presentation transcript:

Daily Drilling Report Phase 2 Project Meeting Pål Rylandsholm 09.02.2009

Agenda Welcome [9:00] Approval of agenda Approval of minutes from last meeting Project overview and overall status - DNV Report layout and updates to XML – Capgemini Updates to PSA's user guide and improved error messages - PSA License Web implementation - Tieto Conclusions and actions AOB Adjourn [13:00] © Det Norske Veritas AS. All rights reserved 24 November 2018

High lights All task have started To enable efficient project execution and decisions, a core group has been established with the following participants: Jonas Stokka, PSA Ann-Christin Schili, LicenseWeb Bjørg Halsteinslid, StatoilHydro Geir Aas, ExxonMobil Arild Solsbak, ConocoPhillips Some issues that needs to be resolved regarding import to License web Need for additional information content have been identified © Det Norske Veritas AS. All rights reserved 24 November 2018

Status (not confirmed) © Det Norske Veritas AS. All rights reserved 24 November 2018

Additional information requirements DDR Phase 1 Operation codes Cement Period of operation “Drilling like units of measure” Formation name – selection list Datum (reference points) Casing type Pressurized coring Well stimulation (At well testing) indicator Perforation - Shot density RIGTYPE Bit data Side track Tight wells DDR Phase 2 Cost (ConocoPhillips) Report nr -> A sequence number. Each day of operation is a new number increment (ExxonMobil) Start date -> Start of reporting/operation (is prior to spud date) (ExxonMobil) Water depth (ExxonMobil) Bit record (additional info): grading, depth in, depth out, drill lenght (m), duration (hr), rop (m/hr) (ExxonMobil) Casing (new section): OD (in),top, bottom, weight, grade, estimated top of cement (ExxonMobil) © Det Norske Veritas AS. All rights reserved 24 November 2018

Document sharing PCA Trac – http://trac.posccaesar.org Collabopration arena https://trac.posccaesar.org/wiki/NcsDdr/CollaborationArea Document repository - SVN Project: https://trac.posccaesar.org/svn/projects/DDR Public: https://trac.posccaesar.org/svn/pub/DDR © Det Norske Veritas AS. All rights reserved 24 November 2018

© Det Norske Veritas AS. All rights reserved 24 November 2018