INTEGRATION DES ALIMENTATIONS REX-ISOLDE OBJECTIFS AB/PO

Slides:



Advertisements
Similar presentations
STAND TEST 3MeV AB-PO-PH mars 2007Jean-Pierre ROYER POWER CONVERTERS AB-PO-PH ( Pulsed and High voltage converters) WHERE ARE WE ?
Advertisements

Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Sc Magnet test facility Consolidation Project presentation M. Bajko for the TEMB on behalf of the MSC TF section team 31. Aug
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Operational aspects 2008 run ISCOOL Isolde workshop Nov 2008 Erwin Siesling.
AB-PO-PH 2005 Pulsed and High voltage converters Responsibilities: PS complex exploitation, active maintenance (documentation, improvement, spare), follow-up.
Software GPure is a software used to simplify 3D Models generated with Catia. This software is developped by Delta CAD a company based in Paris. This company.
31.March.2004 C. A. Martins, CERN AB/PO 1 Analysis of the possibility of using of a ALICE/LHCb type power converter in TT2A target test by Carlos DE ALMEIDA.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Accelerator Complex Controls Renovation, LHC Excluded Purpose and Scope M.Vanden Eynden on behalf of the AB/CO Group.
The TIMING System … …as used in the PS accelerators.
CERN 29 Jan 2008 Power Converters for Linac 4 - Carlos A. Martins1 Power Converters for Linac 4 2 Hz) Carlos A. MARTINS Accelerators and Beams (AB)
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) - Review.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
New Product Development Management NPDM 8 Mohsen SADEGHI Department of Graduate School of Management and Economics Sharif University of Technology.
Review of the Project for the Consolidation and Upgrade of the CERN Electrical Distribution System October 24-26, 2012 THE HIGH-VOLTAGE NETWORK OF CERN.
Electrical Integration CM38 Steve Griffiths & Ian Mullacrane.
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
Christophe Mugnier, on behalf AB/PO Group ATC-ABOC days, 23 January 2008 AB/PO equipment review and Stand-by service description for the power converter.
Major power converter issues for the restart of PS & SPS machines and their experimental areas in 2006 Jean-Paul BURNET for AB/PO PS&SPS days January.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
V.Montabonnet - Safety during Hardware Commissioning 18 October Contents  Electrical circuits in the LHC context  Electrical Hazards  Preventions.
Reliability and availability considerations for CLIC modulators Daniel Siemaszko OUTLINE : Give a specification on the availability of the powering.
Upgrading 600L/s IPPS Gustavo Alverio University of Central Florida August 5, 2003.
Adding Fractions - N. Perez Adding Fractions Positive Fractions.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
Ion Sources – Hardware and Operation MACS Week Friday 8th October 2010 PP a-LPE, 8 th October 2010, MACS Week 2 Liviu Penescu, „Ion Sources.
10.March.2004, phone A.Fabich 1 Technical drawings of TT2A and adjacent galleries Detail – CDD number Overview surface, ----PDP Overview TT2/TT2A/ISR,
K.Hanke – PS/SPS Days – 19/01/06 K.Hanke - PS/SPS Days 19/01/06 Recommissioning Linac2/PSB/ISOLDE from CCC  remote operation from CCC  upgrades & changes.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
Consolidation needs for the Electrical Distribution, Control Cables and Optical Fibres Equipment F. Duval.
Power controls, Sept. 2006A.Fabich1 MERIT installation: Controls for the 5MW power-supply A.Fabich CERN AB-ATB September 2006.
Technical Report for the ISCC Meeting 18 th May 2009 R. Catherall/ M. Lindroos.
Standby Services or Reliance on Experts for Accelerator control? Claude-Henri Sicard AB/CO ATC/ABOC Days 2007.
Jan Low Energy 10 Hz Operation in DRFS (Fukuda) (Fukuda) 1 Low Energy 10Hz Operation in DRFS S. Fukuda KEK.
High power RF tests places at CERN O. Brunner, CERN 4th SPL Collaboration Meeting jointly with ESS.
ATC / ABOC 23 January 2008SESSION 6 / MTTR and Spare Parts AB / RF GROUP MTTR, SPARE PARTS AND STAND-BY POLICY FOR RF EQUIPMENTS C. Rossi on behalf of.
18, 19, 20 February 2002 Power Converters for magnets (PBS 1.2.3) R. GENAND SL/PO 1 Power Converters for Magnets –Introduction –Specification Magnet characteristics.
28/01/2013 Gerrit Jan Focker, BE/BI/PM 1 Isolde SGIU Beam Instrumentation Remarks on status and possible development.
Christoph BALLE Safety Training Safety at CERN La sécurité au CERN.
Teleprotection Equipment Clarification Meeting Tejin Gosai PTM&C 24 th April 2015.
CLOSED LOOP SPEED CONTROL OF DC MOTOR WITH PWM TECHNIQUE
Radio Frequency Andy Butterworth AB/RF Accelerator Controls Renovation WS 3 Dec 2008.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
Safety at CERN La sécurité au CERN. ➊ Occupational Health & Safety Santé et sécurité au travail ➌ Safety of Equipment and Installations Sécurité des équipements.
Massachusetts General Hospital (Inventory Management)
Status of the FAIR Project
High energy beam transport.
REXEBIS In the Electron Beam Ion Source (EBIS) the 1+ ions are charge bred. The positive ions are trapped in an electron beam which knocks out electrons.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
CLIC Civil Engineering & Infrastructure Working Group Meeting
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
EC Activities Status for the LIU
Technical Session CERN ISOLDE – Workshop 2016
352MHz Klystron Control for the 3MeV Linac test stand
the CERN Electrical network protection system
TCM PS – SPS Thyratron Power Trigger Consolidation
Alexander Herlert, CERN (PH-SME-IS)
GIS Portal Racks Project
Programmable Logic Controllers (PLCs) An Overview.
Chapter 7 Section 3.
Chapter 7 Section 3.
Changes in EN
Circuit Disconnector Boxes Implementation of our safety first policy
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

INTEGRATION DES ALIMENTATIONS REX-ISOLDE OBJECTIFS AB/PO Processus identique à celui d’ISOLDE et OFF-LINE Définir des noms d’opération officiels. (appellation commune OP, CO, PO, utilisateurs) Rationaliser les équipements. Prendre en compte la sécurité industrielle. Adapter les interfaces de contrôles. (conforme à la division AB) Réaliser les documentations nécessaires. Elargir les connaissances à l’intérieur du groupe PO, pour faciliter l’exploitation. Améliorer les possibilités condamnation- décondamnation. Prendre en charge l’exploitation par l’équipe de piquet PO (futur) 23/06/2004 N.David - AB/PO/PH J-P ROYER AB/PO

AB-PO REX Power Supplies Integration Goals Over views Short term solutions Long term solutions Works in realizations Conclusions 23/06/2004 N.David - AB/PO/PH

Goals Converter’s reliability Homogenize equipments Reduce repair time Simplify interventions Protect systems Protect peoples 23/06/2004 N.David - AB/PO/PH

Over view - Converters Complexity machine with few different elements. 146 converters for 34 different types. 2 family of converters (alimentation # amplifier). Diversity of converters : 200V to 65kV and 2A to 350A. Very little compatibility with ISOLDE or AB-PO. Electrical distribution problems (lock, separate an equipment). Location of some racks of converters (TRAP-EBIS). 2 programmed references/acquisitions systems for EBIS, 1 for TRAP (ask an homogenization of control system). Space for automates, exotic automates crates (control). Ratio=4.3 contre 18.3 pour ISOLDE, 4.4 AD… 23/06/2004 N.David - AB/PO/PH

Over View – Converters Spares 34 different types of converters 12 types with operational spares 35% of REX have spares : very bad 23/06/2004 N.David - AB/PO/PH

Over View – Critically elements TRAP Section : - 8 Amplifiers REXTRAP +/-200V : no spare EBIS Section : - 1 Pulsed alimentation FUG 22kV => 60kV : no spare and broken once. - 2 Amplifiers TREK 601-4B +/-500 : no spare and broken once. SEPARATOR Section : - 1 Alimentation DC Bouhnik AF99032 (20V/60A). - 7 Alimentations Brandenburg 590 (+ et – 7.5kV). LINAC Section : - 19 Alimentations Danfysik 858 (160A, 180A, 200A et 220A => 4 # groups). - 4 Alimentations Danfysik 896 (±35V/±10A): 2 are broken (replaced by 1 Heidelberg). - 3 Alimentations Heidelberg (±20V/±2A) with same functions as Danfysik 896 - 1 Alimentation Bruker MN65/352 (65V=>350A) Control Section : - Automate crate are not same for all or are not in crate, few manufacturers… 23/06/2004 N.David - AB/PO/PH

Short term solutions A stock of spares/components must be created for critical elements : - Fug 22kV - 60kV EBIS : must obtain 1 spare for control crate or 1 additional converter (~23KCHF for control crate, 120KCHF for converter). Already, we have critical components for control crate. Danfysik 858 : we must get sufficient spares of components/cards (~ 4KCHF) - Bouhnik AF99032 : a spare must be done with a Danfysik 896 model (~8KCH) or by an other way. - 2 TREK 601-4B : must be replaced by TREK 601-2C (~ 4x6.5KCHF) or by a modular system or a hybrid enclosed system (~8x2KCHF) - LMU REXTRAP : must create 1 spare module or be replaced by same modular system as TREK601-4B (~8x2KCHF) - Brandenburg + et – 7.5kV : 3 spares elements must be ordered (~4800 CHF) or be replaced by Heinzinger LNCE6000-1 model (~13x1KCHF) … Tests benches must be created for tests and future repairs. 23/06/2004 N.David - AB/PO/PH

Long term solutions Converters types must be rationalized to AB-PO : - 4 crates with cards 24DC3500 : must be transformed in same type as ISOLDE (~4x3000CHF). - 12 Fug HCE-7 : type to be replaced by Fug HCN-7 type (~12x2300 CHF). - Spares for Fug HCE-35 must be ordered (~3x2500 CHF). - Danfysik 896/Heidelberg converter : we must choose 1 converter type and buy this type to replace the other type (?CHF). - 2 TREK 601-2C : be replaced by modular or hybrid system, same as TREK601-4B (~4x2KCHF). … Electrical must be reorganized, ISOLDE distribution crates must be added for all racks (? 30KCHF). Some converters must be delocalized, RA0 and Ion source converters, regroup free mounted converters of TRAP 3 crates & 2 converters (?CHF). Some automates must be integrated in crates and a rationalization between crate must be done, with AB/CO group (?CHF). 23/06/2004 N.David - AB/PO/PH

Works in realizations Find and create denominations for new or unnamed REX elements, and doing modifications in order to label each converters. Create stock of spares components/cards for critical converters. Quote request/estimation for spare components or spare converters. Find all documents in relation with REX converters. Make test bench for modular converters : LNCE6000-1, DC24-35000, 700V, Brandenburg 590… Investigate for replacement of TREKs low voltage and REXTRAP modules (searching for a common element). Search for other possible solutions in future rationalization. … 23/06/2004 N.David - AB/PO/PH

Contribution to ameliorate the reliability of the REX machine Conclusions For exploitation : - Converters types must be reduced. - Standardization/rationalization of types. - Components/elements spares for all types. - Modifications must be scheduled. Indispensable budget : - Converters are very expensive things. - Today, estimation is over 300 KCHF without control. - Costs for the modifications must be scheduled. Necessary to modify, improve, standardize, reorganize or readapt controls interfaces according with AB/CO group. All treatments must be invisible for the beam (increase performance and decrease complexity). Contribution to ameliorate the reliability of the REX machine 23/06/2004 N.David - AB/PO/PH

Examples – Partial Views of Converters Specifications 23/06/2004 N.David - AB/PO/PH

Examples – Partial Rex Converters Listing 23/06/2004 N.David - AB/PO/PH

Examples – Rex Layout 23/06/2004 N.David - AB/PO/PH

Examples – Rex EBIS Control-Converter Interconnections 23/06/2004 N.David - AB/PO/PH

Examples – Rex EBIS Control-Converter Interconnections 23/06/2004 N.David - AB/PO/PH