Module Production Status in Florence

Slides:



Advertisements
Similar presentations
03 Dec 2002CMS Week - Bonding WGSalvatore Costa - Catania Status Report on Bonding at Catania Salvatore Costa University and INFN – Catania.
Advertisements

Slide 1 Anthony Affolder US Module LT meeting June 17, 2004 UCSB Module LT Testing.
1 Hybrid & Module Testing Status Week of 6/6-6/10.
Slide 1Electrical Testing at UCSB -Anthony AffolderDOE review, January 20, 2004 Module Testing at UCSB: Simulated Production Derek Barge On behalf.
Status of the Tracker DB System Tk week april 03 D. Contardo Developments Applications.
1 US Testing Update-Anthony AffolderTracker Meeting, Feb 10, 2004 US Module Testing Update Anthony Affolder (On behalf of the US testing group) Update.
CMS Tracker Week, CERN, Apr Apr 2004CMS Tracker Week - Module ProductionSalvatore Costa - Catania Module Production ___________ Report on.
1 TEC pilot run status Goal : test TEC module production rate capabilities - 15 R6 modules assembled on Brussels Gantry and bonded in Aachen I - 15 R7.
CMS Week, CERN, December Dec 2004CMS Week - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group Meeting Salvatore.
CMS Tracker Week, CERN, April Apr 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working Group.
CMS Week, CERN, Mar Mar 2004CMS Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università di.
Tracker Week, CERN, Oct Oct 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting 21 Oct.
10 April 2003Salvatore Costa, INFN Catania1 CMS Tracker Week CERN, 10 Apr 2003 Entering Bonding Data in TrackerDB.
CMS Tracker MPR, CERN, 22 November Nov 2004CMS Tracker MPRSalvatore Costa - Catania Module Bonding Working Group Salvatore Costa Università di.
Fermilab PMG - Results from module testing - April 9, 2004 – E.Chabalina (UIC) 1 Results from module testing E.Chabalina University of Illinois (Chicago)
CMS Tracker Week, CERN, February Feb 2005CMS TrackerWeek - Module ProductionSalvatore Costa - Catania Report from Module Bonding Working.
CMS Week, CERN, June June 2004CMS Week - TPOSalvatore Costa - Catania Repair Centers, from a Bonder’s point of view Reported by: Salvatore.
Update of CMS Process Quality Control Sensor Meeting, CMS TK Week, , CERN Florence Anna Macchiolo Carlo Civinini Mirko Brianzi Strasbourg Jean-Charles.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Strasbourg status Ring 7 pilot run François Didierjean.
The CMS Silicon Strip Tracker Carlo Civinini INFN-Firenze On behalf of the CMS Tracker Collaboration Sixth International "Hiroshima" Symposium on the Development.
CMS Tracker Week, CERN, February Feb 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
Tracker Week, CERN, Feb Feb 2004Tracker Week - Module ProductionSalvatore Costa - Catania Report on Module Bonding Salvatore Costa Università.
GuidoTonelli /TK_GM/CERN/07_12_05 1 TIB/TID Status Report (on behalf of the INFN consortium) STATUS OF THE INTEGRATION ACTIVITY OF THE TIB/TID_FWD TIB-MTCC.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
LHCb PRR - Girish D. Patel1 QC and Process Control G. D. Patel.
INFN and University of Florence Test Beam Meeting Tracker Week
Status Report on Bonding at Catania
Status of PQC Florence, Strasbourg, Vienna
INFN and University of Florence Test Beam Meeting Tracker Week
TIB module performance at X5 Test beam – preliminary studies
Anna Macchiolo, PQC Firenze
UCSB Hybrid Bonding & Testing
FNAL Production Experience
Hybrid & Module Testing Status
Update of US Testing Status
Executive summary from Bonding WG Meeting 21 Oct 2003
Hamburg Bonding Report
Results from module testing
A. Kaminskiy, CMS Tracker week , Apr 2004
US Module Production Quality
Module Failures on RODs
FNAL Module Testing Status
Module production in Italy
US Testing Update Anthony Affolder (On behalf of the US testing group)
Bari production centre resp. M. de Palma
Hybrid Testing Status 10 new hybrids brought by Lenny all tested
FNAL Module Testing Status
First UCSB TEC Module (Pictures)
Hybrid & Module Testing Status
Module Testing at UCSB: Simulated Production 11-04
FNAL LT Testing Status Modules – were tested during Aug 2 – Aug 9.
Module Testing in Florence Carlo Civinini INFN-Florence
Module Testing Status Week of 6/14-6/20.
A. Kaminskiy, CMS Tracker week , Apr 2004
TOB Module Production Overview and Plan
FNAL module testing summary
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Module Testing Status Week of 3/14-3/18.
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Hybrid & Module Testing Status
Università di Catania and INFN – Sezione di Catania
Presentation transcript:

Module Production Status in Florence Shipping & Receiving: Gabriella Gheri Bonding: Mirko Brianzi, Enrico Scarlini DB: Simone Paoletti Tests: Riccardo Ranieri, Cristiano Marchettini, Andrea Bocci, Florentina Manolescu, Carlo Civinini, Marco Meschini xFLAG: Cristiano Marchettini, Riccardo Ranieiri ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Statistics (up to April 19th) received> 87 (31 L12p) bonded> 78 (22 L12p) ARCtested> 78 (22 L12p) ARC Ok> 76 (22 L12p) LTtested> 74 (19 L12p) LT Ok> 73 (19 L12p) Modules produced following the TIB procedures specified in: http://hep.fi.infn.it/CMS/moduletest/proc_prod/Procedure.html ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Status of Bonding Since March bonded 22 new modules (6 chips). For this L12p modules the loop height is very important, so it took a lot of time to set all the loop parameters and solve some problem. Now a new program for Delvotec is ready and it automatically bonds all the front side of the module, making all the loop shapes more reproducible. The failure rate for these modules lowered from 3 fails/module (repaired) in the beginning down to zero on the last bonded modules. ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Readout bonds Loop heights Specifications: min. 200µm max. 350µm 340 240 Specifications: min. 200µm max. 350µm These are pictures of the loops’ profile... ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Filter Capacitor and Bias bonds 370 420 525 ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Pull Test DAGE 3000 pull test machine Results of Pull Test on Readout bonds for 5 modules Mean force = 11.1g Max Standard deviations = 0.99g Minimum value = 9.0g ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Rejected Modules Two bad Modules detected by ARC: 30200020035163 Voltage breakdown at ~200V 30200020035190 23 contiguous noisy strips One bad (suspicious) Module detected by LT: 30200020035065 Some strange behaviour (affecting Peak Time only) at room temperature then a failure at -15oC followed by intermittent failures with ARC and LT 3/78  rejection rate of 3.8% ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

ARC Discarded Modules (i) IV breakdown (after bonding) at 200V No evident anomalies after optical inspection (30200020035163) IV from sensor DB OK (Imax~200nA) ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Module 30200020035190 Noisy strips 148…167 148…167 ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Pinholes One new pinhole (not present in the sensor DB) has been generated after some bonding problems on strip #1  promptly identified by both ARC and LT Another new pinhole has been identified by ARC but it is not apparently related to any bonding problems  not identified by HPK? Both strips have been disconnected At present time no new pinhole has developed during the LT runs. ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

IV - ARC Test Taken with ARC-DEPP Extracted from xml-xFLAG Current [nA] Volt ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Defect Statistics The defect analysis has been carried out using the Tony-Riccardo’s macros and xFLAG generated xml files 58 ARC tested modules and 54 LT tested modules have been analyzed and inserted in DB The bad strips distributions are peaked at zero and are dominated by the marginally noisy strips (aka statistical fluctuations noisy strip in only one - out of four - mode) ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Defect Statistics (from DB) out of 31000 strips ARC LT #mod in DB 58 54 # bad strips 79 27 # noisy strips 64 8 # shorted strips 1 # opens 13* 15* # pinholes # ???? 2 * Mainly unbonded pinholes ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Extracted from xml-xFLAG 23 contiguous Bad strips Unstable module After LT ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Extracted from xml-xFLAG ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Module grading by xFLAG ARC 54/58 grade A 2/58 grade B 2/58 grade C  rejected LT 52/54 grade A 1/54 grade B 1/54 grade C  rejected The .xml files have been uploaded into production DB ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze

Conclusions In Florence we produced 78 TIB modules (56 L34p and 22 L12p) The bonding procedures have been optimized for L34p and L12p modules: no major problems The ARC test follows immediately the module bonding, LT within one week A total of 3 modules have been rejected The bad strips are at the permille level 112 .xml files have been inserted into DB ModProd Meeting TK-week April 22nd 2004 Carlo Civinini INFN-Firenze