Electrical Glitch 06:02 Electrical glitch is seen on all circuits connected to the 18kV (RD1.LR1, RD1.LR5, RD34.LR3, RD34.LR7)

Slides:



Advertisements
Similar presentations
Signals and Circuits 2 Time responses The nature of the time response at the electrical system is the same as at the mechanical system. As example in the.
Advertisements

Ohm’s Law.
9 x9 81 4/12/2015 Know Your Facts!. 9 x2 18 4/12/2015 Know Your Facts!
1 x0 0 4/15/2015 Know Your Facts!. 9 x1 9 4/15/2015 Know Your Facts!
1 x0 0 4/16/2015 Know Your Facts!. 1 x8 8 4/16/2015 Know Your Facts!
3 x0 0 7/18/2015 Know Your Facts!. 4 x3 12 7/18/2015 Know Your Facts!
MPS External ReviewMarkus Zerlauth September 2010 Magnet Powering System Magnet powering and Protection Commissioning of Powering Protection Systems Failures.
Basic Electricity.
17.March Connection to the CERN Power System of the TT2 mercury target project by Karsten KAHLE (TS-EL)
Electrical Resistance and Ohm’s Law Electric circuits are used to convert electrical energy into some other form of energy we need.
Introduction to Current Electricity and Circuits.
Electric Circuit. SERIES CIRCUIT +- RARA RBRB In this Circuit, electric current has one path to flow (1) The current is same everywhere in the circuit.
Lesson 2 How do electric circuits work?. Electric Circuits You know that electric circuits only work when the circuit is closed. OPEN.
Power Plant Construction and QA/QC Section 4.4 – In-Plant Electrical Distribution Engineering Technology Division.
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
Saturday 7ish – refill for RP set-up 9:15 Going for Roman pot alignment. Stefano is coming. 12:10 TOTEM: Alignment of horizontal RPs B2 finished, short.
Status 100% 30% 100% STATUS REPORT on Electromagnetical Perturbations on the Hardwired Safety Alarms  The investigations to understand the causes of hardwired.
1) orbit reponse measurements indicated no obvious BPM polarity errors (Kajetan) 2) confirmed consistency between synchronous and IIR- based orbit estimates.
Monday :00 Injection for physics fill # :00 Stable beams fill #1816, luminosity ~1.2x1033 cm-2s-1 11:08 Beams dumped. QPS trigger on detector.
Actual Circuit Total inductance:15.4 H (154x0.1H) Total resistance:1 m  RB output current:13 kA RB output voltage:190 V Main Power Converter RB circuit.
From yesterday LHC status Wednesday 26 th Welcome Verena back on shift 07:08 Access in PM85 for piquet EPC (O.Fournier).  Fuse on RD2.R8 circuit.
MP3 report – week /05/2010 – 09/05/ actions MP3/QPS team in CCC LMC: 12 th of May 2010.
TE/MPE/MI MPE-TM30 th June 2011 FMCM sensitivity to mains perturbations 0v1 M. Zerlauth.
BLM internal beam abort request :24:50 Bernd Dehning CERN BE-BI MPP, B. Dehning.
Voltage Divider Circuits Input transducers Input transducers are devices that convert a change in physical conditions (for example, temperature) into a.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
Interfacing the FMCM for additional protection in the LHC and the SPS- LHC/CNGS Transfer Lines to the CERN controls system Cristina Gabriel Casado, Interlock.
Schmitt Trigger Circuits. Op Amps Previously in ET1 we investigated the Operational Amplifier. The Op Amp consisted of V in V out A feedback loop O V.
Monday 19 th March 07:33 Lost (another) beam in the squeeze, beyond 2 m, B2 hits 1/3 resonance. 08:30 Start (another) ramp  Try to correct coupling and.
V Semester (Electrical)
TRANSFORMERS  A power station produces an AC pd of ~25 kV  This AC pd is stepped up to ~132 kV so that it can transport through cables without losing.
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
Technical Services: Unavailability Root Causes, Strategy and Limitations Data and presentation in collaboration with Ronan LEDRU and Luigi SERIO.
When we generate power we ramp up the voltage for transmission (up to V) and then when it arrives at homes we ramp it back down for convenient use.
The National Grid Mains electricity is produced by ______________.
Friday 15th June 01:11 Injection.
Wednesday 21 March 2012.
Re-commissioning campaign
Focus Coil Quench Detector
Transformer -Types & Applications
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Wednesday 5th September - morning
Circuits and Circuit Elements
Initial Experience with the Machine Protection System for LHC
LHC Status Su Morning 17-April R. Assmann, B. Holzer et al
BPA RAS Misoperations 11/2016, 6/19/2017 and 6/21/2017
Machine Protection Xu Hongliang.
Yesterday Issue of injection kicker not pulsing:
Interlocking of CNGS (and other high intensity beams) at the SPS
Power January 12, 2016.
M. Zerlauth, I. Romera 0v1.
Beam dump on 07. Sept 2012, Caused by RTQX2.R5 (SEU?)
LHC Status Sun Morning 20-Mai
Monday February 28th 8h00: Injection
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
ELECTRICAL CIRCUITS AND CONSTRUCTIONS An electrical circuit is a network consisting of a closed loop, giving a return path for the current 2.
Wednesday 10/5 Cryo recovery until 18:30
Sunday/Monday & :30 Stable beams. Fill #1851.
LHC Morning Meeting - G. Arduini
BPA RAS Misoperations 11/2016, 6/19/2017 and 6/21/2017
LHC FMCM Project 1.
Goals To calculate resistance using Ohm’s Law
07/08/2010 Fill #1264 dump at 02:14:38.
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Monday :00 – 15:00 : Stable beams 15:30 : Recover…
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Saturday Luminosity production 1380 bunches
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Electrical Glitch 06:02 Electrical glitch is seen on all circuits connected to the 18kV (RD1.LR1, RD1.LR5, RD34.LR3, RD34.LR7)

FMCM signal vs Threshold RD1.LR5 RD1.LR1 RD34.LR3 RD34.LR7 [11] 2

Converter Current & Voltage ΔI/I=8.95E-4 ΔV~5V RD1.LR5 ΔI/I=6.3E-4 ΔV~5V RD34.LR3 [11] 3

Protection requirements Beam dump(s) are consistent with defined protection requirements (for all 2011 triggers) Reminder: FMCMs are protecting the beams, not the powering equipment! The fact that no power converters trip during the perturbation does not mean that the beam dump could be avoided by increased FMCM thresholds (current changes induce orbit movements and eventually dumps on losses