Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.

Slides:



Advertisements
Similar presentations
December 2005 EuP Directive : A Framework for setting eco-design requirements for energy-using products European Commission.
Advertisements

1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
Operation & Maintenance Engineering Detailed activity description
IEC – IEC Presentation G.M. International s.r.l
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
SC 18 Ad Hoc Task Group API Staff Issues Ed Durante, Chair.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
National legislative framework for waste. Basic framework legislation The Law on Waste Management (Official Gazette of Montenegro 80/05 and 73/08) established.
Transition from Q1- 8th to Q1- 9th edition
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Module 3 UNIT I " Copyright 2002, Information Spectrum, Inc. All Rights Reserved." INTRODUCTION TO RCM RCM TERMINOLOGY AND CONCEPTS.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
Integration of Quality Into Accident Investigation Processes ASQ Columbia Basin Section 614 John Cornelison January 2008.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Prof. Seppo Virtanen TUT PURESAFE Final Conference Tuesday 20 January 2015, 14:20 – 14:40 RAMS Methods and Tools: From LHC to FCC.
Overview Lesson 10,11 - Software Quality Assurance
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
UGDIE PROJECT MEETING Bled September WP6 – Assessment and Evaluation Evaluation Planning  Draft Evaluation plan.
First Practice - Information Security Management System Implementation and ISO Certification.
D. Keane June Internal Quality Audits (4.14) -ISO Requirements for Internal Audits -The Audit Process -Templates for Meeting Requirements.
Project Execution.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Software Project Management
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden CRE Policy, Labelling 2006/06/22 - Toulouse ANTD SFP Page 1 Design,
Introduction to ISO New and modified requirements.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Software Quality Assurance Activities
Unit 8 Syllabus Quality Management : Quality concepts, Software quality assurance, Software Reviews, Formal technical reviews, Statistical Software quality.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
IRSN STRATEGY TO ASSESS A NEW MAINTENANCE POLICY / Nesebar, Bulgaria Presented by Naoëlle MATAHRI, IRSN.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Lecture 11 Managing Project Execution. Project Execution The phase of a project in which work towards direct achievement of the project’s objectives and.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Over View of CENELC Standards for Signalling Applications
Project Risk Management Planning Stage
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
RLV Reliability Analysis Guidelines Terry Hardy AST-300/Systems Engineering and Training Division October 26, 2004.
1 Project Management C53PM Session 3 Russell Taylor Staff Work-base – 1 st Floor
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Software Engineering Lecture 8: Quality Assurance.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Stracener_EMIS 7305/5305_Spr08_ Systems Availability Modeling & Analysis Dr. Jerrell T. Stracener, SAE Fellow Leadership in Engineering EMIS 7305/5305.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
About Us! Rob StockhamBA IEng MIEE General Manager Moore Industries-Europe, Inc MemberIEE Honorary Secretary ISA England Institute of Directors DirectorThe.
External Provider Control
Project Quality Management
Regulation (EU) No 2015/1136 on CSM Design Targets (CSM-DT)
Experience in Conformity Assessment of Products and Services  for Russian NPPs and Overseas Nuclear Power Plant New Builds Yury Meltsov Aug
GE 6757 TOTAL QUALITY MANAGEMENT
Unit I Module 3 - RCM Terminology and Concepts
DOE Review of the LCLS Project 7-9 February 2006
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Presentation transcript:

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 1 Design, Manufacture, Transport and Integration on-site in Chile of ALMA Antennas RAMS ANALYSIS PM# February 2006

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 2 SUMMARY Alcatel Alenia Space Italia will be responsible for the execution of the RAMS analysis for the whole antenna. Within this responsibility AASI will perform: the hazard analysis to identify all potential hazards related to the design, the operation and the maintenance of the antenna and define the measures needed to remove or bring them to an acceptable level. The safety compliance assessment documenting the compliance with the ALMA safety requirements. The RAM analysis in order to contribute in the definition of antenna architecture, related maintenance approach and the related spare philosophy

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 3 SAFETY ACTIVITY Hazard Analysis Using the definition of Hazard categories (I ÷ IV), probability level (A ÷ E), hazard classification and acceptability matrices from Technical Specification, scope of the safety analysis is: Definition of the Hazard list showing: Hazard Effect Cause Hazard Analysis defining for each identified hazard: Means for prevention Hazard Category Probability level Risk index ( combination of category and probability) Actions to be undertaken. Hazard register to trace and document the implementation of the defined actions

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 4 SAFETY ACTIVITY Safety compliance Safety compliance will consider the collection of the entire safety related documentation relevant to the antenna project in accordance with the safety requirements of the ALMA technical specification. The assessment will be documented in the Safety Compliance Assessment Report where evidence will be provided of compliance status with the safety design requirements together with the design, test,inspection and special procedures information. The conclusive statement of conformity will be included

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 5 SAFETY ACTIVITY OUTPUTS Hazard analysis report in accordance with DRD-28 Safety Compliance assessment in accordance with DRD-29

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 6 RAM ACTIVITY The Mean Time Between Failure (MTBF) of the antenna under the specified operational conditions will be calculated starting from the system modelization (in term of Reliability Block Diagram) and the equipment failure rate. The failure rate of each equipment is either provided by the supplier or calculated on the basis of available information. Typical reference sources are: Parts Count Method as per MIL-HDBK-217F + Notice 2 (electronic-electrical components). NPDR-95 of the US department of defence (for non electronic parts) RDF 2000 (for electronic components). The duty cycle of each part will be considered according to the specified antenna operational profiles.

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 7 RAM ACTIVITY The RAM analysis (for MTBF evaluation) will be developed, using a dedicated Reliability/Availability model that includes only the intrinsic Antenna equipment characteristics (e.g. failure rates, MTTR(s), preventive maintenance time intervals, etc.) excluding any logistic constraint not under AEM visibility/responsibility. This approach is in line with the content of para. 8.1 in the technical specification. The spare strategy will be identified using models generally adopted in the common practice (e.g. Poisson approach). A dedicated analysis will be performed to estimate the expected time spent in corrective and preventive maintenance, given in terms of man-hours/month.

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 8 RAM ACTIVITY OUTPUTS Spare part list in accordance with DRD-35 Reliability Availability Analysis in accordance with DRD-25

Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page 9 REMARKS Some clarifications of Technical Specification requirements are needed: Table refers to the system out of operation for more (less) than 3 months: This is understood being applicable to the single antenna: pleas confirm. Tables to : according to this approach some failure events (with impact only on antenna operation) could be not acceptable (e.g. marginal III A) while they are perfectly acceptable from MTBF requirement point of view. Para 9.1.5: This para does not include any requirement but only identification of possible failure rates data sources. In case the MIL-HDBK-217F is adopted for some equipment the reference operative environment should be G M (Ground Mobile) instead of A UC (Airborne Uninhabited Cargo)