"Energy Efficiency in IPPC-installations"

Slides:



Advertisements
Similar presentations
Presentation on Diesel Engine Process
Advertisements

EcoTherm Plus WGB-K 20 E 4,5 – 20 kW.
Name: Date: Read temperatures on a thermometer Independent / Some adult support / A lot of adult support
FLUID BED GRANULATION SWITCH CABINET MANUFACTURER : GLATT AG
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Santa Fe, N.M. July 25,
Renewables (CHP), Global Warming, and Energy Efficiency Richard Brent Solar Government Affairs Lake Tahoe, California July 28, 2005 California Manufacturers.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
ABENGOA SOLAR Solar Power for a Sustainable World Past, Present, and Future of Solar Thermal Generation Bruce Kelly Abengoa Solar, Incorporated Berkeley,
Qualified Energy Recovery A Green Power Technology No additional fuel consumption Near zero emissions with air cooled OEC Inside the fence installation.
Recovered Energy Generation
1 2/9/2014 Energy Savings, Power Reliability, Environmental Stewardship The benefits of on-site cooling, heating and power.
David Burdett May 11, 2004 Package Binding for WS CDL.
Jeopardy General Compare & Order AdditionSubtraction Vocabulary Q $100 Q $200 Q $300 Q $400 Q $500 Q $100 Q $200 Q $300 Q $400 Q $500 Final Jeopardy.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
CALENDAR.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Year 6 mental test 15 second questions Numbers and number system Numbers and the number system, Measures and Shape.
£1 Million £500,000 £250,000 £125,000 £64,000 £32,000 £16,000 £8,000 £4,000 £2,000 £1,000 £500 £300 £200 £100 Welcome.
Druck- und Temperaturmesstechnik Testing Procedure MH-2 Mobile Hydraulic Testing Procedure 1 Pressure Transmitter MH-2.
State of the art of combined cycle power plants south of Graz Energy efficiency conference Vienna 21 st October 2004 Authors: DI Josef Tauschitz DI Martin.
Antti Piirto The first EPR under Construction in Finland International Nuclear Forum 2008 ”Bulgarian Nuclear Energy – National, Regional and.
ACTIVE LEARNING PROCESS
Steve Crawford, M.Sc Environmental Director 1. Overview and Background Tribal energy mission statement: To be 100% self- sufficient in energy, while safeguarding.
June Energy consumption in Korea 4 primary & final energy consumption CO 2 emissions LNG Nuclear Renewables, etc Oil Coal Energy Industrial.
EN 407. OH 1..
Break Time Remaining 10:00.
Operations Management For Competitive Advantage © The McGraw-Hill Companies, Inc., 2001 C HASE A QUILANO J ACOBS ninth edition 1 Strategic Capacity Management.
* A chiller capable of producing water temperatures of low 40s on the evaporator side and above 135° on the condenser side.
1 Heating and Cooling of Structure Observations by Thermo Imaging Camera during the Cardington Fire Test, January 16, 2003 Pašek J., Svoboda J., Wald.
DOE - Chiller System Optimization Opportunities With Gas Engine-Driven Cooling Systems.
Andrea Mariottini Riello Gas Boilers Division
Power Plant Construction and QA/QC Section 2.3– Steam Generators
Lecture Notes - Energy Conservation Topic “Boiler”
Super Critical Boilers SYSTEM STUDIES ON ADVANCED POWER GENERATION TECHNOLOGIES FOR 21st CENTURY Dr V K Sethi Director MOP/ CEA.
Arul Joe Mathias B.E., M.Engg., MBA Dr. Balasankari B.E., M.Engg., Ph.D Trends in Biomass Power Generation in Asia and Opportunities for Global Equipment.
ENERGY EFFICIENCY IN POWER PLANTS Frans van Aart Energy Efficiency in IPPC installations October 21, Vienna.
August 13, 2009 ULTRA SUPERCRITICAL Pulverized Coal-Fired Steam Generators.
New Technology Improves Efficiency of Universitys Energy Infrastructure Frank Brewer Associate Vice President for Facilities Management University of Maryland.
ACTIVE LEARNING PROCESS
Energy Efficient Steam Systems
Maximizing Investment Recovery on Power Plant Closures Gregg Epstein Perry Videx. LLC May 10, 2013 New Orleans, LA.
COMBUSTION CONTROL IN BOILERS 1 Dept. of Electronics & Instrumentation, Narayana Engineering College, Nellore.
Lindbergh Field International Airport New Terminal Bill Mahoney LSW Engineers.
Gas Turbine Technologies for Electric Generation
Technologies for CCS on Natural Gas Power Systems Satish Reddy April 2104.
Ottawa Microturbine Application Workshop jan Return of Experience for Microturbines Running on Landfill Gas // waste water gas in Europe
Bolland Hybrid power production systems – integrated solutions Olav Bolland Professor Norwegian University of Science and Technology (NTNU) KIFEE-Symposium,
TCCI Barometer March “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Sets Sets © 2005 Richard A. Medeiros next Patterns.
TCCI Barometer September “Establishing a reliable tool for monitoring the financial, business and social activity in the Prefecture of Thessaloniki”
Strategy Review Meeting Strategy Review Meeting
Before Between After.
Benjamin Banneker Charter Academy of Technology Making AYP Benjamin Banneker Charter Academy of Technology Making AYP.
25 seconds left…...
Equal or Not. Equal or Not
Slippery Slope
Automotive Technology
EnvironmentEnvironnementCanada Nusa Dua, Bali, Indonesia September 5 – 7, Part 4: LFG Utilization.
We will resume in: 25 Minutes.
Fractions Simplify: 36/48 = 36/48 = ¾ 125/225 = 125/225 = 25/45 = 5/9
Clock will move after 1 minute
Select a time to count down from the clock above
Quiz Number 2 Group 1 – North of Newark Thamer AbuDiak Reynald Benoit Jose Lopez Rosele Lynn Dave Neal Deyanira Pena Professor Kenneth D. Lawerence New.
Power Plant Construction and QA/QC Section 2.4– Boiler Auxiliaries
Combined_Cycle_Power_Plant Prepared by: Nimesh Gajjar.
Prof. D.N. Reddy Director Centre for Energy Technology University College of Engineering Osmania University.
Prof. D.N. Reddy Director Centre for Energy Technology and Principal University College of Engineering Osmania University Hyderabad – 7. THEME PAPER ON.
Presentation transcript:

"Energy Efficiency in IPPC-installations" Modern Combined Cycle Power Plants – Improvement of a high efficient and clean technology O. Kreyenberg, H. Schütz, H. Friede Siemens PG "Energy Efficiency in IPPC-installations" 21 and 22 October 2004 Vienna

Reference Power Plant Product Overview - Steam Power Plant Agenda Market Drivers Reference Power Plant Product Overview - Steam Power Plant - Combined Cycle Power Plant Reference Power Plant Design Philosophy Design Targets References

* technical warranties (NOx, et. al.), delivery time The Market Conditions Have Changed Dramatically in the Power Industry Over the Last 10 Years Overall Construction Time Efficiency Price Risk Guarantee* Market Conditions Years * technical warranties (NOx, et. al.), delivery time

Life Cycle Cost (LCC) Analysis Parameters influenced by the supplier Parameters Costs Investment costs Financing costs Service life Demolition costs Reduction of specific investment costs Global sourcing Modular design Short delivery times Capital costs Live Cycle Costs Fuel contract conditions Efficiency Fuel Costs High process and component efficiencies Personnel costs Consumables/waste Spare parts Maintenance Optimized level of automation High availability Ease of maintenance Operating costs

Reference Power Plant Product Overview

Components, Islands and Turnkey Our Reference Power Plants are Focused on International Main Market Demand for IPP’s Varioplant 300 300- 450 MW 700 500- 750 MW 900 800- 1000 MW Coal/Oil Customized... of the shelf... Single-Shaft 50 Hz 100, 290, 400 MW Gas/Oil 60 Hz 100, 270, 365 MW Multi-Shaft 50 Hz 200, 580, 800 MW 60 Hz 200, 540, 730 MW Components, Islands and Turnkey Gas/Oil

Multi-Shaft Combined Cycle Power Plant Econopac Arrangement Gas turbine Gas turbine generator Air intake Exhaust gas system Fuel system Electrical package (SFC/SEE) GT - Auxiliaries Fire protection Options

Multi-Shaft Combined Cycle Power Plant Power Island Arrangement Econopac Steam turbine Steam turbine generator incl. SEE Heat recovery steam generator Major pumps Condenser Critical valves ST - Auxiliaries Cycle optimization Fuel gas pre-heater Options

Multi-Shaft Combined Cycle Power Plant Turnkey (Cooling Tower) Power Island Fuel supply systems Cooling systems Water treatment Raw water system Waste water system Tanks Cranes/ hoists Buildings/ structures Fire protection Plant piping/ valves Plant electrical Further options

Multi-Shaft Combined Cycle Power Plant Turnkey with House (Cooling Tower) Power Island Fuel supply systems Cooling systems Water treatment Raw water system Waste water system Tanks Cranes/ hoists Buildings/ structures Fire protection Plant piping/ valves Plant electrical Further options

Reference Power Plant Design Philosophy

Evolution of Combined Cycle Power Plant Efficiency Steam cycle Single pressure Dual pressure Tripple pressure with reheat Net efficiency (%) 60 1160°C — 100 bar 520°C Turbine inlet temp. (ISO) Fuel preheating Life steam pressure Life steam temperature 1250°C 200°C 160 bar 580°C 58 1230°C 130°C 125 bar 565°C 1230°C 130°C 110 bar 550°C 1120°C — 80 bar 520°C 1190°C 200°C 110 bar 540°C 56 1050°C — 75 bar 510°C 54 1000°C — 60 bar 485°C 52 960°C — 50 bar 460°C Fuel gas firing ISO ambient conditions (15°C, 1013 mbar, 60% rel. humidity) Condenser back pressure 0.04 bar 50 48 46 1983/84 1987/88 1990/91 1992/93 1994/95 1996/97 1998/99 2001 2005/06 Year of commissioning Source: Siemens Gas Turbines

Economical Evaluation Factors

Power Output, Efficiency, NOx-Emission and Cooling Air Demand versus Combustion Temperature Boundary conditions: The same technology for blade cooling, combustion chamber cooling and burner. mKL . Ex- haust gas 102% Gas turbine NOX Tcomb. Fuel 2% Heat recovery steam generator Combustion air 80% Combustion chamber NOX Air intake 100% Electricity Generator Cooling air 20% TCool.-air hGUD Steam turbine Circulating water Electricity TIT Generator Condenser 1570°C 1700°C TCombustion

Efficiency Improvements due to Increasing the Number of Pressure Stages Temperature curves in a heat recovery steam generator Efficiency increase D h net [%-points] Temperature [°C] 1-pressure process 2-pressure process 3-pressure process 125 bar/565 °C 28 bar/565 °C 4 bar/235 °C 600 3 500 125 bar/565 °C 29 bar/320 °C 5 bar/200 °C Exhaust gas 400 2 80 bar/540 °C 5 bar/210 °C 300 2.8 200 1 2.1 1.6 100 65 bar/540 °C 54.1% Transfered heat 1-pressure 2-pressure 3-pressure without reheat 3-pressure with reheat

Quick Start up Increases Plant Utilisation Factor... GT at full load/ Bypass System closed Start-up after 8h Shut-down Plant start-up with improved equipment Typical plant start-up Plant Load [MW] ≈ 40 min ≈ 90 min Time

Limiting Values for Flue Gas Emissions

Relationship between turbine inlet temperature and NOx emissions A temperature increase by 70K doubles the NOx- emissions !

Design Targets

One the way to the Technical leadership now tomorrow Efficiency 58%* > 59% TIT** 1230°C 1290°C NOx 25 ppm 9 – 15 ppm * depending on cooling conditions ** turbine inlet temperature Details on additional measures will be presented at a VDI Symposium in Leverkusen 23./24. November 2004

References

Mainz-Wiesbaden, Germany Combined Cycle Power Plant V94 Mainz-Wiesbaden, Germany Combined Cycle Power Plant V94.3A with Steam Extraction Mainz - Wiesbaden (Germany) Concept: Multi Shaft 1+1 V94.3A Output (nat. gas, site) : 1 x 400 MW Efficiency (nat. gas, site): >58,4 %* COD: July 2001 Fuels: Natural Gas (Fuel oil Back up) Contract: EPC TK plus 10 y. S&M

Pulau Seraya, Singapore: 2 CC 1S. V94 Pulau Seraya, Singapore: 2 CC 1S.V94.3A The Most Efficient Plant in SEA Pulau Seraya (Singapore) Concept: Single Shaft 1S.V94.3A Output (nat. gas, site) : 2x 367 MW Efficiency (nat. gas, site): >57.2 % COD: November 2002 Fuels: Natural Gas (Fuel oil Back up) Contract: EPC TK plus 10 y. S&M