XRN4621 - Construction of a Meter Reading where a Converter and AMR is recorded OR where a Meter with Conversion capability is fitted v2 DWG 28/06/2018.

Slides:



Advertisements
Similar presentations
1 Project Smart Metering Portfolio Foundation & DCC Day 1 Updates April 2013.
Advertisements

1 Project Smart Metering Portfolio Foundation Updates June 2013.
Implementation of Non Effective Days Nexus Workgroup – March
1 Smart Metering Portfolio DCC Day 1 Project Smart Metering Portfolio Focus Group Project Update Thursday 06 th June 2013.
Datalogger / DMV Modification Proposals - Summary Simon Trivella – 26 th August 2010 Distribution Workstream - Elexon U P D A T E.
1 Smart Metering Foundation Stage February Agenda File Format Changes for Effective Switching Back Population Approach for Effective Switching.
1 UNC Review Group 175 – Encouraging Participation in the Elective Daily Metered Regime 26 th June 2008.
Industry Dialogue on xoserve Services 14 th September 2007.
IGT and Shipper Workgroup meeting 28 th February 2011.
1 iGT Agency Services migration considerations As part of UK Link replacement programme (incorporating industry requirements) the new systems will need.
David Addison / Steve Deery
Functional Change through RGMA Review Ph2
Distribution Workgroup 24/11/16
Datalogger / DMV Modification Proposals - Summary
xrn4361 UK Link Future Release 2
UK Link Technology Refresh
Background - Tolerance Rules
Nexus Meter Read Performance April 2018
Revised registration for unregistered sites
Must Read Process Guide For Shippers
Agenda Action Review Update on IX and iGT access Testing strategy
UNC Modification – Non Effective Days
Background - Tolerance Rules
Distribution Workstream UNC Modification 0224 Draft UKLink Implementation Summary Responses 26th February 2009.
Future Release 3.0 – Release 3 Industry Impacts & Recommendation
Change Management Committee – June 2019 Update
Overview XRN4665 is looking to add new EUC profiles for bands 01B & 02B New EUC profiles will be split based on Market Sector Code & Pre-Payment Meter.
DSC Change Budget 17th October 2018
RAASP – Solution Options Scenario Comparison
CSEPs Reconciliation Proposals
DSC Change Committee Summary – 11th July
Chris Warner UNC Modification Panel 21 December 2017
Background MDD is currently managed within SPAA
R&N Timeline June-19 Sept-19 (EUC) Nov-19 Minor Release D4
CoMC on 20th February 2019 For Discussion Only
Distribution Workgroup 8 August 2012 Joanna Ferguson
XRN Construction of a Meter Reading where a Converter and AMR is recorded DSG 18/06/2018 DWG 28/06/2018.
Market Participant Identity Process – migration to UNC
CSS Consequential Change CoS Shell Record Submission for Discussion at 630R 27th April 2018.
UNC Modification Proposal 0385 Inclusion of DNOs as Users in User Pays Arrangements Phil Lucas 7 June 2011.
June 2019 Release Scope DSC Change Management Committee
DSC Change Committee Summary – 13th March ‘19
Datalogger / DMV Modification Proposals - Summary
Transporter Initiated SPA Confirmations on behalf of User Potential Impact Discussion with UK Link Committee.
Current situation The submission of AQ Appeals and AQ Amendments using two alternative dates and reads that provide a more realistic indication of the.
XRN4249 – Part B Data Migration Plan
Modification Proposal 115 – ‘Correct Apportionment of NDM Error’
SPA Processes for DM Sites
Deferral of Retrospective Updates Functionality
PN UNC AMR Topic Workgroup
Lessons Learnt UKLC - November 2015
Procurement of NDM profiling data
Smart Metering Implementation Programme January 2013
Project Nexus Workgroup
MOD Proposal 0224 Facilitating the use of AMR in the Daily Metered Elective Regime Distribution Workstream Update Following Completion of Analysis 23rd.
UNC Modification 0634 (Urgent) – Post Implementation Assessment
Implementation Approach Distribution Workgroup – June 2014
Meter Read Rejections ..
Meter Reads.
Project Nexus Workgroup
Customer Issue Management CoMC Update
Retail Energy Code - Data Access Schedule
High Level System Solution Impact Assessment
DSC Change Committee Update
UK Link Timeline June-19 Sept-19 (EUC) Nov-19
Enabling Large Scale Utilisation of Class 3
DSC Change Committee Update
XRN Enabling large scale utilisation of Class 3 – MOD0700
REC Data Specification and UK Link File Formats
Customer Issue Management Dashboard CoMC
Presentation transcript:

XRN4621 - Construction of a Meter Reading where a Converter and AMR is recorded OR where a Meter with Conversion capability is fitted v2 DWG 28/06/2018 DSG 02/07/2018 (NB: 18/06/2018 v1)

Background Reading construction in Nexus was highlighted prior to implementation as an issue where Converter and AMR devices are fitted at site As [typically] AMR devices only have two ports – therefore may only obtain two indexes In advance of Nexus, we agreed with Shippers that they needed to provide three indexes (meaning that they would need to ‘derive’ one index), …and that we would look at this following Nexus. IGEM Panel GM/5 requested that this group ALSO consider the construction of a Meter Reading where the device is a Meter with Conversion capability (italicised text is specific to this scenario)

Question for Shippers Through this presentation we’ll go through some of the background, but the question for Shippers to consider is bold text below: We understand from MAMs that some configurations exist which would call in converted and unconverted ONLY. UNC doesn’t appear to envisage this scenario for Shipper provided Meter Readings. Need assessment of numbers from Shippers of instances of Supply Meter Points sending ONLY converted + unconverted indexes – this may drive an alternative approach – e.g. make the Meter Reading ‘Optional’ in the Meter Reading records.

Background – What Code States: Definition of Meter Reading (M 1.5.2) 1.5.2 For the purposes of the Code, in relation to a Supply Meter: (a) a “Meter Reading” is: (i) the reading of the index of the Supply Meter; and (ii) where a convertor is installed as described in paragraph 1.2.3, the converted and the unconverted readings of the convertor except that where Transporter Daily Read Equipment and such a convertor are installed, a Meter Reading need not include both the reading under paragraph (i) and the unconverted reading under paragraph (ii) or where Remote Meter Reading Equipment and such a convertor are installed, a Meter Reading need not include the unconverted reading of the convertor under paragraph (ii); So where it is Transporter Daily Read Equipt– states that valid combinations are: Meter + Unconverted + Converted; OR Meter + Converted Reading; OR Unconverted + Converted Reading Other AMR equipment: Meter + Converted; OR Meter + Unconverted + Converted As this discussed a ‘convertor’ device – it is assumed that a Meter with Conversion capability is excluded from this clause?

Background – File Formats Class 1: M00 Record, DLC File https://xoserve.sharepoint.com/:w:/r/sites/UKLink/_layouts/15/WopiFrame.aspx?sourcedoc=%7B08449D60-FE9A-4E82-90C1-193ABA69702E%7D&file=M00%20DAILY%20DATALOGGER%20READINGS1%20V6.3L.docx&action=default&DefaultItemOpen=1 Meter Reading ‘Mandatory Field’ Corrected Reading ‘Optional Field’ – Conditionality is that this must be provided where a converter is fitted.

Background – File Formats Class 4: U01 Record, UMR File https://xoserve.sharepoint.com/:w:/r/sites/UKLink/_layouts/15/Doc.aspx?sourcedoc=%7BD4DB6604-5BD1-492B-A05F-887B8B0D3D8B%7D&file=U01%20UNBUNDLED%20METER%20READ%20V5L.docx&action=default&mobileredirect=true&DefaultItemOpen=1 Meter Reading ‘Mandatory Field’ Uncorrected Reading ‘Optional Field’ – Conditionality is that this must be provided where a converter is fitted. Corrected Reading

Converting Volume into useful Data. Meter Meter Readers Manual Meter / Converter Reads Pulses of Unconverted Volume New generation meter with Logging and Comms 3rd party AMR System Volume Converter New Generation Volume Converter With Logging and direct Comms Pulses of Unconverted Volume (sometimes) Industry IT systems Pulses of Converted (and often Unconverted) Volume Datalogger with Comms Note. Pulses are not 100% reliable Datalogger /AMR with Comms

Valid Installation Schematics converted converted Meter Converter AMR unconverted unconverted converted converted Meter splitter Converter AMR meter meter converted converted Meter splitter Converter AMR* unconverted unconverted AMR* meter meter * - this may be a second AMR device, or three channel AMR device – none are known to be installed at this time

Requirement Statements – Converter with AMR UNC appears to stipulate: So where it is Transporter Daily Read Equipt– states that valid combinations are: Meter + Unconverted + Converted; OR Meter + Converted Reading; OR Unconverted + Converted Reading Other AMR equipment: Meter + Converted; OR Meter + Unconverted + Converted Requirement statements: Transporters / DMSP - Continue to only allow Meter and Converter Readings as per records. Agree? Define conditionality in User Reading Records in UMR, UBR and UDR to align to UNC. Agree? We understand from MAMs that some configurations exist which would call in converted and unconverted. Need assessment of numbers from Shippers of instances of this – this may drive an alternative approach.

Requirement Statements - Meter with Conversion Capability Potential to be fitted on all Supply Meter Points (i.e. not AQ specific) Will be controlled in the Meter Model table (MDD under SPAA) Recommendation to add indicator to Meter Model table only Recommendation NOT to change RGMA flows to include an explicit flag within flows (SPAA and UKL) Question about consideration of new Meter Type to denoted Conversion Capability, (SPAA and UKL impacts) if included will require: Transformation activity to revert existing Models to new Models Risk that the Supply Meter Point has transferred to an alternative User – will require action by new User

Requirement Statements - Meter with Conversion Capability UNC does not stipulate anything explicit for these scenarios, should it? Assuming not, this will be a matter for UK Link system flows (and referred to DSC Change Managers) Proposal to DSC Change Managers (and expected referral to DSG) Does not mandate a UK Link system change MP Conversion Factor should be set to 1 Reading construction: Meter Reading index only – No Converted / Unconverted indexes expected Applies to all Shipper User to UK Link flows (UMR; UBR; UDR; RGMA) Resync - It is not expected to require any resync flows Reporting – potential reporting against Meters with Conversion where MPCF<>1