Appendix: 2017 RTEP Report Key Graphics and Information The following set of slides provides key information from PJM’s 2017 RTEP cycle. The slides are provided for the reader’s own communications needs. www.pjm.com
Backbone Map www.pjm.com
NERC Reliability Councils www.pjm.com
Locational Deliverability Areas www.pjm.com
Approved RTEP Projects (December 31, 2017) NOTE: The PJM Board authorized on February 14, 2018, more than $397 million of additional transmission system enhancements identified by PJM and reviewed with TEAC stakeholders in 2017. This brings PJM’s total to more than $35.4 billion since 1999. www.pjm.com
Approved Baseline Projects by Voltage – 2014-2017 (Approval Year) www.pjm.com
Baseline and Supplemental Projects (2014-2017 approval years) www.pjm.com
Summer Peak Load Forecast Comparison (2016-2017) www.pjm.com
10 Year Summer Peak Growth Rate Comparison 2013-2017 www.pjm.com
Existing Installed Generation (CIRs, December 31, 2017) As of Jan 31, 2017 www.pjm.com
Queued Generation Fuel Mix- Requested Capacity Injection Rights (December 31, 2017) NOTE: Nameplate Capacity represents a generator’s rated full power output capability. www.pjm.com
Queued Generation Progression – Requested Capacity Rights (December 31, 2017) Historically, 11 percent of generation interconnection request megawatts reaches commercial operation. www.pjm.com
Existing Capacity as of December 21, 2017 vs Existing Capacity as of December 21, 2017 vs. Future Capacity for June 1, 2023 www.pjm.com