H/V Spectral Ratio Prepared by 2010
Context Download Software Upload the Data Data Order H/V Calculation
Download TsPro http://fieldgeophysics.pbworks.com/HZ
Context Download Software Upload the Data Data Order H/V Calculation
TsPro and Data Click on TsPro RUN
Select one SGY file and drag it over the Tspro window Single Data Upload Select one SGY file and drag it over the Tspro window
Context Download Software Upload the Data Data Order H/V Calculation
Readable Order Any of following sets are readable. 1) X/Y/Z or EW/NS/V for file having at least 3 components 2) H/V for file having at least 2 components
Data Order If a file having 3 traces or more, and the 1st 3 traces are X, Y, and Z, respectively, H/V ratio can be obtained by checking on the check box in row-22 of [Utility] sheet. Click on the side head with a "?" to show associated hints.
Change the Order by METADA From X,Z,Y to X,Y,Z Click the Meta Data, and Write the Order (X,Y,Z)
Change the Order: Simply Reword FALSE ORDER TRUE ORDER If one needs to change the order of the data channels, click on METADATA FALSE ORDER
Copy and Paste
Context Download Software Upload the Data Data Order H/V Calculation
Click H/V ratio and then Refresh Selected Window FFT or ARFFT or AR You can unclick FFT or AR? Spectrum: AR or FFT Click H/V ratio and then Refresh
Save the picture as a Post Script, and play with the picture.