Source Driver Status CMS Week November 2007 P. Debbins University of Iowa.

Slides:



Advertisements
Similar presentations
New Nuclear Plants in the United States
Advertisements

CE PUWER. Which legislation applies? Which legislation applies? Product legislation Free movement of goods Employment legislation Employee protection.
1 Liverpool Production Status Week of 23 February 2007.
1 Liverpool Production Status Week of 02 March 2007.
Means of Vertical Circulation: Elevators traction verse hydraulic types, sizes, speeds and finishes, escalators. Hydraulic Elevators Traction Elevators.
O T F O R D T O O L & G A U G E C O M P A N Y L I M I T E D The Design and Manufacture of Mini Applicators O T F O R D T O O L & G A U G E C O M P A N.
1 Copyright Electric Power Research Institute 2008 Steam Turbine-Generator Guidelines Quick Start VolumeContent 1General Practices Condition assessment,
Essentials of project management Lecture 8. Targets of Lecture Introduction to project management –Understanding the target process in typical projects.
Seog Oh/ Duke University/June, 2003 TRT/ ATLAS week at CERN Duke Production Status.
ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
Module shoulders The purpose of this module is to arrange the shoulders in one and the same position, ready oriented to be put onto the mandrels. Shoulder.
Hydraulic Power Assist
Chapter 7 Discrete Control Using Wireless Field Devices.
Andrew Moss ASTeC MICE Project Board 28 th June 2011 MICE RF System.
Collaboration meeting, RAL, 4 th – 7th November 2009 Andrew Moss ASTeC Collaboration meeting, RAL, 10 th – 13 th november 2009 MICE RF Amplifier Status.
Simulation Workshop on CMS Calorimetry, Ooty, Feb 18 – 20, HCAL Status CMS HCAL Status Jim Freeman.
Development of Laser Fuser Test Bed Project Number: P07501 Justin McMillan.
Team HazardHawk Team HazardHawk The HazardHawk Team HazardHawk 2008.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
CMS HCAL Meeting, FIT, February 2002 Alvin Laasanen and Virgil Barnes, Purdue University 1 SOURCE CALIBRATION SOURCE CALIBRATION Status of Radioactive.
P09451 Final Project Review Bryan McCormick (ME) Project Manager Andy Freedman (ME) Heat Transfer/Fluids Analysis & Design John Kreuder (ME) Thermal Modeler.
Equipment Familiarization Amatrol 850 Basic Hydraulic Training System
ZDC Remote Handling System March 10, 2011 Project Status and Forward Planning Technical Implementation Group Meeting Paul Debbins University of Iowa.
We are Here! Gluex Collaboration Meeting May Engineering Status - Presented by Tim Whitlatch1.
Electro-Pneumatics Module 1
F. Toral CLIC Workshop CIEMAT contribution to CLIC Experimental Verification F. Toral on behalf of Accelerator Technology Group, CIEMAT.
1 ACTIONS: Ashley French TASK STATUSCOMMENTS 1. Contact Berthet-SergeFuture 12/11/10 2. Contact Serge Mothot & Said Atieh (CERN Workshop) Future 12/11/10.
May Team Information Client Department of Electrical and Computer Engineering, Iowa State University Faculty Advisor Professor Gary Tuttle Team Members.
CMS HCAL, FIU Miami, February 24-26, 2005 Virgil Barnes, Purdue University 1 HCAL SOURCE SYSTEMS SOURCE SYSTEMS STATUS Virgil Barnes Purdue University.
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
CMS Radioactive Source Driver Systems Status and Action Items Paul Debbins University of Iowa October 14, 2005.
Level 2 Unit 4 Producing Engineering Solutions Engineering Diploma Level 2 Unit 4 Producing Engineering Solutions An Approach to Unit Delivery and Assessment.
High Frequency power Tool System An Introduction.
Wegmans Bread Tray Lift Assist By Brendan Moran,Greg Feather Alex Phillips and Andrew Beasten.
Presentation on Preventive Maintenance
Engineering Design Dein Shaw. Chapter 1 Introduction What is design?
Interpreting and Using Engineering Information. Overview This unit aims to give learners the knowledge and skills needed to use engineering information.
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
Silicon Meeting July 10, 2003 Module and Stave Production Status James Fast Fermilab.
May 2001, Istanbul Workshop High Voltage Plates and Capacitor Status Jack Fowler.
RADIATION SOURCE Design Review Dmitry Gudkov BE-BI-ML.
EuroSkills and EWT (Electronics Workshop Team) Why new trade proposal? On the basis of the experiences gained through the ModVoc project,
11/22/2015S. Holm1 CMS HCAL TIMING & CONTROL MODULE(CCM) Cost and Status of V5 Boards –Boards 3 and 4 were modified to improve the QPLL and Crystal layout.
Spectrometer Solenoid Fabrication Status and Schedule Steve Virostek Lawrence Berkeley National Lab MICE RAL October 20, 2008.
16/04/20031PNPI / LHCb Muon EDR Wire Pad Chambers PNPI design for regions R4 in Stations M2,M3,M4  4 gas gaps of 5mm±70µm;  Active area: 1224x252.8 mm².
Chiller control system Lukasz Zwalinski – PH/DT.
November 04 Jason Tarrant CCLRC1 SCT EC Interconnects l Progress of SCT EC Interconnects »Services (Required for Disc Insertion 2004 / Integration 2005)
1 Original ATE brake force reducing valves Double the control options – mechanical, hydraulic.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
LAV construction status – M. Moulson (Frascati) – Photon Veto WG – CERN – 12 Jul 2011 LAV construction status: a snapshot 2 A1 Arrived at CERN 29 Jun.
HF Source Drivers Performance Observations and Recommendations Paul Debbins University of Iowa Nov. 10, 2004.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
MH...CH LECT-021 SYSTEMS CONCEPT Adopting a materials handling systems from overall optimization point of view. Adopting a materials handling systems.
Hybrid and Module Status 1. Hybrid Delivery First hybrids over-etched and shrunk due to changes in design and mistakes in manufacturing – Shrinkage for.
BASIC AUTOMATIC CONTROLS UNIT 16 ADVANCED AUTOMATIC CONTROLS
MICE RF – Installation at RAL Tim Stanley RAL 7 November 2013.
Marble Cake Process Improvement – Final Review Aaron Delahanty Arwen Sharp Benson Yu Kenyon Zitzka Ryan Norris.
1 Source Driver Update Yasar Onel - iowa On behalf of Paul Debbins and Ianos Schmidt HCAL Run Planning Meeting 6 Nov
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
S A Griffiths CM42 June 2015 Electrical & Control.
It’s…….
The 4th Annual Colorado Robot Challenge
Complementary ISTC Projects #3888, 3889p
Far Detector Activities Late 2017 – Early 2018
QPM delivers value over the life cycle of the product
CDS-EL IRR Closeout 28 March 2019 J.G. Weisend II, Chairman.
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
3D Scanner Application for Tank Repair
Presentation transcript:

Source Driver Status CMS Week November 2007 P. Debbins University of Iowa

MTCC Air Drivers 1 each HB and HE driver were installed for MTCC. Drivers demonstrated the ability to function in the 4T field. Several outstanding engineering issues and more experience using drivers in the field required continued refinement for final design of full set of permanent drivers, which have been realized, and the required compliment of permanent drivers have been delivered to cern.

Air Driver Inventory HE: 6 permanent drivers required, 6 delivered over summer spare driver at Iowa, all components manufactured, awaiting assembly. HB: 4 permanent driver required, 4 delivered during fall spare driver at Iowa, components manufactured, awaiting assembly. Assembly of spare air drivers will take place after delivery of 4 permanent electric drivers required for HF, scheduled for delivery Feb. 1, 2008

Air driver final refinements Source wire reels changed from nylon to PET. PET dimensionally stable long term, machines to greater precision, meets cern fire standards Wire indexing mechanism redesigned ground-up Wire exit groove module developed to fix difficult wire loading, and friction and wear of earlier aluminum groove Reel locking pin installed to eliminate possibility of wire movement when drivers are in storage. HB driver valve assembly moved under main plate due to availability of space – drastically improved overall layout.

Continued Refinements Pneumatic circuit altered to prevent back-drive of indexer motor in certain conditions. Pneumatic and Electrical connections to drivers installed on solid bulkhead.

HB valves, wire exit groove, air indexer heads

HB Drivers ready to ship

HE Reel Assemly

After a hard day fighting back, 3 HE indexers take a break

Electric Drivers In addition to the modifications implemented to the original Icarus series used for HCAL fingerprinting, final electric drivers will have PET reels, exit groove modules, reel locking pins, and larger lead garages. Iowa machine shop has begun producing these components and a partial inventory of original modifications exist at Iowa. Current plans are to produce a total of 12 drivers, although 14 originals exist. 4 permanent drivers are required for HF, and these will be assembled before work begins on the remaining 8. The indexer plates for the HF drivers were delivered to cern summer 2006 to enable installation of source wire conduit tubing. Delivery of the 4 HF drivers expected Feb1, Work then commences to produce the spare air drivers and remaining 8 electric, with expected delivery data June 1.

Documentation and Parts inventory A complete CAD library exists for all modifications, and most original components, which needs to be organized and assembled Air drivers have a complete library, some electric driver parts are undocumented. Careful notes were taken during assembly and setup adjustments and these also need to be compiled into a manual, to facilitate long-term maintainability of drivers at cern. Spare parts need to be assembled into an organized inventory and delivered to cern. All maintenance/repair of drivers will take place at cern and components need to be on site.