Pilot Trailers 2 & 3 Delhi WWTP. 250 gpm self-priming pump 265 gallon Chemical tote 1800 gal, SS Partitioned Chemical Conditioning Tank W/ 2-mixers, Overflow.

Slides:



Advertisements
Similar presentations
JOINT MEETING OF ESSEX AND UNION COUNTIES Virtual Plant Tour.
Advertisements

We dont just go with the flow, we create it.. Introduction to Chemflo and FRX Do your customers use 316 SS end suction centrifugal pumps? Do you need.
DAF Whitewater Systems
Chemical Fume hood or Biosafety Cabinet
Jar Testing of Chemical Dosages
DISINFECTION: APPROPRIATE TECHNOLOGIES FOR WASTEWATER TREATMENT KA SAMSON Presented at the APPROPRIATE TECHNOLOGY CONFERENCE BMW CENTRE, CAPE TOWN, 3-4.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to American #2 Wastewater Treatment Plant.
SAND CLEANING STATFJORD C FIELD TEST Stavanger 18 – 19 January 2006 Henrik Dannström, MATOR AS.
The Challenge How to eliminate the inherent inaccuracy of tote tanks?
By: Frank Filas, P.E. Environmental Manager Energy Fuels Resources Corporation 44 Union Blvd., Suite 600 Lakewood, Colorado Uranium Development in.
INTRODUCTION TO THE TREATMENT OF TANNERY EFFLUENTS
ENVE 420 Industrial Pollution Control EQUALIZATION Dr. Aslıhan Kerç.
Treatment of Slaughterhouse Wastewater
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
Kubota Johkasou Model HS-P
Introduction to Septic Tanks John R. Buchanan, Ph.D., P.E. University of Tennessee.
GENERATION OF ADDITIONAL REVENUE FROM PRODUCTS OF
FLOTASI.
ENVIRONMENTALIST II-B WATER RECLAMATION SYSTEM. GENERAL INFORMATION EV II-B A compact water recycling system designed to reduce water consumption and.
Appropriate Technologies Conference Simple chemical dosing systems in small water works Cape Peninsula University of Technology G. Mwiinga Cape.
Jade Titus Cargill Meat Solutions Schuyler, NE. Tech Rendering Melt Tanks  Inefficient use of steam  Over cooks the tallow (emulsifies)  High temperatures.
CTC 450 Review Secondary Treatment Trickling Filters Biological Towers
Wastewater Treatment and Permit Compliance  Document Permit issue and expiration date  Document permit requirements  If discharge to city, review.
Surface Water Treatment Plant
20,000 Barrel Per Day Produced Water Treatment System
1 Math Questions. 2 Length x Width x Water Depth = cubic feet.
Welcome to Shawnee #2 Wastewater Treatment Plant.
Welcome to Shawnee #2 Wastewater Treatment Plant.
AQUATEST a.s. TECHNICAL SUPPORT DIVISION Modular units for mine water disposal A set of technical equipment designed for mine water disposal is.
WELCOME TO THE KENNEBEC WATER DISTRICT FILTRATION PLANT.
South Fork WT Plant Tour 5/1/2007 South Fork WT Plant Tour 5/1/2007.
Ethanol Waste Paper Converting Waste Paper into Ethanol March 28, 2008.
PHOSPHORUS REMOVAL FOR LAGOON OPERATORS WHY THE CONCERN OVER P.
Waste Water Treatment Plant (WWTP) Commissioned: Jan 2008 Capacity: 300k 2500mg/L discharge Krofta Waters Technology Ltd.
Northvale Korting Fluid Jet Theory and Applications of Eductors By Patrick Belcher.
Mazzei Injector Company, LLC
Drain systems PAB Drain Systems Drain systems are important to allow equipment to be drained, opened, inspected and repaired If else, process fluids.
FLOW THROUGH WATER TREATMENT SYSTEM USING ALUM & PAM REEDY CREEK IMPROVEMENT DISTRICT.
5.2 Freshwater Pollution. Water Pollution Is the introduction of chemical, physical, or biological agents into water that degrades the quality of the.
CORK GLASS LTD. Introduction Cork Glass have 8 machines that use either fresh or recycled water as a coolant as part of the production process. This created.
Available Water Flow Meter Size Typical flow depending on size
Rainwater Overflow Rainwater Captured & Used Potable Water Used Rainwater Harvesting: Cistern Performance Simulation Cistern Size (Thousands of Gallons)
Hybrid bio-chemical approach for treatment of Industrial Wastewater
Flow Equalization 1.  To overcome operational problems caused by flowrate variations  To improve the performance of the downstream processes  To reduce.
November 17, 2015 NC AWWA-WEA Annual conference
Water and Wastewater Treatment
Electricity | Natural Gas | Water | Wastewater Adding Whey for Denitrification Dale Adams, P.E Managing Engineer, Colorado Springs Utilities September.
SATMathVideos.Net Water is pumped into an tank at 20 gallons per minute. The tank has a length of 10 feet and a width of 5 feet. If the tank starts empty,
CUMHURİYET WTP Process Calculations Dr. A. Saatci.
Dr. Mohab Kamal. CE 445 Water Reclamation and Reuse (Dr. Mohab Kamal) 2.
ALSI Air and Liquid Systems, Inc. CheckMark vs. Centrifuge.
Welcome to American-Bath Wastewater Treatment Plant.
ATP FOAM SYSTEM Engine 438 Ansul / Rockwood Model B2 400 GPM Around The Pump Foam System.
Continental AG Manufacturing Facility
FIELD INVESTIGATION OF IN SITU LIME NEUTRALIZATION OF ACIDIC SEDIMENT
Inventory and Tertiary Treatment of Effluent from Textile Industries in Bangladesh The use of a new system combining an enhanced coagulation, flocculation.
WATER DEMAND (Chapter 24)
Introduction of Liquid Flow Standards Section Fluid Flow Division National Metrology Institute of Japan (NMIJ)
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
DAF System Air Supply Pressurizing Pump Retention Tank
Pre-Engineered Water Surface Water Treatment Plants
Microfloc Products Adsorption Clarifier/Trident/Tri-Mite
CTC 450 Review Secondary Treatment Trickling Filters Biological Towers
Vertical Pressure Filters
Streaming Current Detectors
Septage Management Options
Microfloc Products Adsorption Clarifier/Trident/Tri-Mite
Forced draft cooling tower. NumberingEquipment A-1Storage Tank B-2Temperature sensor C-3Pump D-4Ball valve E-5Rotameter F-6Cooling water from the tank.
Jar Testing of Chemical Dosages
Presentation transcript:

Pilot Trailers 2 & 3 Delhi WWTP

250 gpm self-priming pump 265 gallon Chemical tote 1800 gal, SS Partitioned Chemical Conditioning Tank W/ 2-mixers, Overflow weir Poly Mix Polymer Dilution System CF125 ClearFloater Flotation Cell 2-60 gal translucent Poly Day Tanks (poly / frothing Agent) 2-Metering Pumps 2 - Calibration Columns F50 SAF Froth Generator 7 x 8 Spare Parts Storage / Treatability Lab 480V / 3P/ 50A Power

2 Solids Pump/ Solids Outlet Treated Water Discharge Potable/Reclaimed Water Inlet Maintenance Deck

Required Connections/Facilities 3 Wastewater/Influent Feed Pump (Trailer Rear) Coagulant Tote and/or PH Control Agents/as appropriate (Trailer Rear) Polymer/Frothing Agent Day Tanks (Trailer Mid-section) Potable/Reclaimed Water Source 40psi/1 Line - 5gpm max. (Trailer Mid-section) Skimmed Solids Discharge 2 Line (Trailer Mid-section) Treated Water Discharge, Gravity Feed; 4 Line on 6 Flange (Trailer Mid-section) Power; 480V, 3P, 50A Service (Trailer Front) TRAILER REARTRAILER FRONT