EMC Status Report: November 2003 Roger Barlow Events since last report (25 th Sept.) –The ROD Current status –Electronics –Neutron Generator –Light Pulser.

Slides:



Advertisements
Similar presentations
ACADs (08-006) Covered Keywords Defense-in-depth, reactor protection system, solid state protection system, reactor trips, Engineered Safety Feature System.
Advertisements

Community Equipment – A case study. Peter Gage Clinical Service Manager Mid & West Essex Wheelchair Services.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
H1 SILICON DETECTORS PRESENT STATUS By Wolfgang Lange, DESY Zeuthen.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 6, 2012.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
MOM Report Ray Gamet MICE Operations Manager University of Liverpool MICO 18 th May 2009.
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 20, 2009.
Nov. 7 report LIU Qian. This morning we installed 6 fibers: fiberPMT 39AOut layer 3 39BInner layer 3 39COut layer 4 39DInner layer 4 39EOut layer 5 39GOut.
Bad Fibers LIU Qian. Today we put the bundle 2 (West bundle) into the protecting tube. Common end 9 m barrel 5.6 m 9.4 m Put into coiled tube Put into.
IR2 and IR4 Summary PEP-II meeting Jan. 23, 2006 M. Sullivan.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
The procedure to replace CALO rectifier (AC/DC converter) 1.
Tent Update 5 Feb 2008 Matt Durham for tent crew.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
HERA Week 50 Nov-Dec Running Shut-down at the end of the year Startup in January January-February Running.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
0 Status of Shower Parameterisation code in Athena Andrea Dell’Acqua CERN PH-SFT.
E.C. Aschenauer RSC-Meeting, January 21st T h e b e s t k e p t s e c r e t n u m b e r a t R H I C / B N L / U S A f o r s u r e n o t t o b e.
MICE Target - Risk Lara Howlett University of Sheffield.
Dmitri Denisov D0 Weekly Summary: August 18 to August 24  Delivered Luminosity and operating efficiency u Delivered 6.9pb -1 u Recorded 6.0pb -1 (87%)
NuMI/MINOS Status All Exp. Mtg. June 2, 2008 Jim Hylen/FNAL Page 1 FAR DETECTOR: 98.0% live time (wall clock) There was a power outage on the morning of.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Ursula Bassler, LPNHE Paris1Collaboration Meeting - 13 Sept Calorimeter: Status & Plans Preamp/ Driver Trig. sum Filter/ Shaper x1 x8 SCA (48 deep)
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
AHCAL Electronics. Status Commissioning Mathias Reinecke for the AHCAL developers HCAL main meeting Hamburg, Dec. 10th, 2009.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Pixel DQM Status R.Casagrande, P.Merkel, J.Zablocki (Purdue University) D.Duggan, D.Hidas, K.Rose (Rutgers University) L.Wehrli (ETH Zuerich) A.York (University.
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
HBD Status Report from Run 9 Craig Woody BNL DC Meeting July 8, 2009.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
PHENIX WEEKLY PLANNING 3/02/06 Don Lynch. BLM Test.
04 Feb 03 Shutdown Activities Cryostat warm-up –Dilute contaminates Use purer helium on cooldown –Thermal stress test for cassettes –Move cassette from.
LHCb-UT and Velo Upgrade Road to a system EDR in Q June 2015 Bart Verlaat 1.
 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.
July 10, 2001 Status Report of the ROD Testing at BNL Kin Yip Activity update of the ROD system at BNL: DAQ-1 with trigger controller Data corruption testing.
FESS/Ops Week Ending 1/20/13. CUB Status – Boiler #1 ON LINE CB Kramer due in to Wire in second recirculating Pump and install NFPA 70E mitigations –
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
2015 Operations Stay Treat CHL2 4K Cold Box Modifications SC1 2K Cold Box CC4 Failure Helium and LN2 Losses Contamination Operations Stay Treat.
PHENIX Smoke Alarms Incident, 27-May-2016 Mickey Chiu, for the PHENIX Operations Crew.
V Thermo-siphon Workshop Test protocol Jan Godlewski PH/DT-PO On behalf of thermo-siphon working group
OPTIMISING SHUTDOWNS CRITICAL MACHINES SPARE PARTS MANAGEMENT RISK MANAGEMENT.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
Arnd Meyer (RWTH Aachen) Sep 8, 2003Page 1 Integrated Luminosity Total data sample on tape with complete detector > 200pb -1.
June 2, 2008 Bill Wisniewski1 BaBar Disassembly and Disposal Overview.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester June 3, 2013.
Implementing eMaintenance using i SCADA technology for Wisma Persekutuan Melaka By Nurhaizan JKR Mekanikal Melaka Case Study Published by permission and.
TS2 preparatory meeting
NA62 LAV Anti1 REMOVAL & TESTS
Roger Wendell for the OD group
Shifter Instructions regarding the ZD, Dan Peterson
VTX readiness for RUN15 Y. Akiba.
DIRC Background Status
Overview of KLM Crate Utilization
Schedule after Shutdown
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

EMC Status Report: November 2003 Roger Barlow Events since last report (25 th Sept.) –The ROD Current status –Electronics –Neutron Generator –Light Pulser –Chillers –Data Quality -Trickle Injection Christmas plans Running in 2004

ADB happenings 4 dead ADBs (Sept 25) became 6 (+1 noisy CARE) 3 in FB, 1 in BB, 2 in EC The ROD –Forward Barrel : Fixed 3 ADBs. –Endcap: correct pipe in East, assess in West –Wahid moved way up the learning curve –Attempt to fix Endcap East by IOB replacement. Fail (and lose neighbour) Score -1 –backward barrel left alone (door). Spontaneous cure. Score +1 Replaced FB ADB became noisy Now have 4 dead/noisy ADBs

Readout status Data from latest Light Pulser calibration run

Current Status: Electronics Dans next trip being organised for Jan/Feb 2004 FavouriteOnly OK ADB66 Barrel IOB11 Endcap IOB1?2 LV power supplies 5- Crates0- Crate power supplies 5-

ROB: Install Neutron Generator Its here. It works. Its paid for. Source calibration takes 30 Go back to 10 5 day between calibrations –Use `naturally occurring down times –Detailed instructions for shift crew to page Source Shifter Small work needed –Flashing blue light for operation during access –LV power supply surge protect and remote on/off control

Current Status: Light Pulser Used without airconditioning in cabinets (instability) Used for detecting dead readout in global detector calibration and independently by EMC New units on order, here December for installation over shutdown

Current Status: Worries(1) Endcap chiller. Not working (pump was dead, heating element for bypass line has problems + leaky valve…) and not understood. Leaking freon. Backup being used.

Re-engineering fan units in LV PS crates is going forward slowly/not at all. Currently 3 out of 12 crates done. There are no spare crates. If When one dies a replacement will have to be put together on the spot from spare parts. Current Status: Worries(2)

Current Status: Data Quality Run 4 looks OK. Trickle injection indications are that low background data with reasonable inhibit window are fine

Mass plots Run – normalRun – trickle

Christmas plans Replace noisy barrel ADB with a favourite Replace/reconnect Endcap East IOB Look at Backward Barrel miracle cure, replace a couple of ADBs with intermittent noisy CARE chips. Dont go for Endcap West. Pipe problems. Will need time and thought and expertise. Not worth risk of breaking something… Take time. Use trusted components.

Outlook for 2004 Anticipate starting with 1 dead ADB, to be fixed when we have plenty of time to work. Anticipate/hope for reasonably low failure rate so need for RODs is reasonably low: 3-4/year.