A-90 Pressure Switches 2013 TSA Meeting

Slides:



Advertisements
Similar presentations
Logic Gates Some Most All Learning Objective
Advertisements

BeginningNext SlideBack End Program AVADAL 1 of 12 SK-2 ROLLER APRON SEGMENTS HIGH PRESSURE MODULE.
WebStat™ Programming and Configuration of Thermostats.
STAND ALONE CONTROL FOR TERMINALS
Condensate Trap Heater KGAHT0201KIT 2013 Fall Zone Meeting Gary Georgette/Jerry Shipman UTC Climate, Controls & Security Confidential and Proprietary Information.
Proper Vent Sizing 4 Natural Draft Furnaces 4 Fan Assisted Furnace 4 Common Vent Systems.
» When you have completed this module you will know, what components do, what they physically look like and how they are represented in a circuit diagram.
Contact Points and Light Bulbs
Filter manifold Holding tank Iron- manganese filter Aeration tank Control unit Pre- filter To storage tanks Backwash overflow SO2 vent Bypass Cutoff valve.
35” CONDENSING GAS FURNACES Vent and Combustion Air System Design & Installation 1 Add Distributor Art and Text Here.
Engineer Presentation
Dennis Sabre Fire Appliances
Cooling Only 38MFC/ 40MFC Heat Pump 38MFQ/ 40MFQ
JET PROPULSION Part 6 Jet Engine Operation Fuel Systems.
Domestic Installation: Switch Circuits
UTC Climate | Controls | Security Confidential and Proprietary Information Not for Further Distribution Lt. Commercial Product Updates 2013 Zone Service.
Pressure Switches. New modulating and multi-stage furnaces are more complex and require that installation instructions and procedures be followed so that.
By Carlin Bright. Electricity The flow of electrons in a conductor.
Circuits and Symbols. The flow of electrons through a circuit Electricity A closed circuit allows electricity to flow An open circuit has a break so electricity.
TOPIC-MAKING CONNECTION OF ONE SWITCH AND ONE SOCKET
MonoDrive & XT Constant Pressure Controller
NSGF 2000 PICO EVENT TIMER HERSTMONCEUX SLR STATION.
7.3.4 Student Book © 2005 Propane Education & Research CouncilPage Identifying the Components and Operating Characteristics of Limit and Fan Controls.
Unit 4 Symbols.
Training Course SuperCool 1000 Level 1 Course #P0131.
Keeps heat indoors in winter and outdoors in summer – means lower heating and cooling bills Rated by it’s R-value. The greater the R- value the better.
TEKS 5.6B Demonstrate that the flow of electricity in circuits requires a complete path through which an electric current can pass and can produce light,
INTRODUCTION TO FBD - Function Block Diagram by ( LOGO ) Revision 2.
FIREPOWER BY SABURKE. Distributed Power Modules Model 5495Model Amps9 Amps.
0 HGP VERSIONS. Main differences HGP 3 Pressure: max. 200 barPressure: max. 400 bar Design Style: Axial plunger pump HGP.
What is a circuit? A set of connected electrical components that provide one or more complete paths for the movement of charges. A set of connected electrical.
Lab 2 page 1 ENT-DIGI-210 Lab 2 Notes ©Paul Godin Updated September 2007.
HP BY PASS WARM UP METHODS: (A) Equalising line with orifice (B) Drain line at upstream side of valve connected to downstream side of Main Steam line strainers.
S3 INNOVATION ELECTRONICS. LESSON TITLE: ELECTRONICS Learning Intention: To understand when to use different types of logic gates Activity: Building own.
LCD Wiring Diagram Presentation B / B.
GCSE Science A Physics 1 Transmission of Electricity Learning Outcomes Understand the need for an electrical distribution system Describe the national.
Procedures.
1 | WEATHERIZATION ASSISTANCE PROGRAM STANDARDIZED CURRICULUM – March 2011eere.energy.gov COMBUSTION BASICS HEATING SYSTEMS FOR ENERGY AUDITORS AND INSPECTORS.
Electromechanical Relays Mechatronics ECE 5320 Assignment #1 Paul Smart.
Welcome to the 13 th Annual TSA Conference, 2016.
Solar Water Heater System Suppliers in UAE
E3 HVACR Controls and Devices
Product Overview Analogue Input, 2fold, SM  Box  Sensor connections
New Low Capacity Gas Furnace
Unit Ampacity for Wire Sizing
E4 HVACR Electrical Installation
E3 HVACR Controls and Devices
E4 HVACR Electrical Installation
RESIDENTIAL CONDENSING GAS FURNACES Vent Design & Installation Training Spring 2014 UTC Building & Industrial Systems Confidential and Proprietary Information.
ELECTRIC TRACTION SYSTEM
The Relay based Multiplexer
Date of download: 3/4/2018 Copyright © ASME. All rights reserved.
T-6B On-Board Oxygen Generation System (OBOGS)
SB Packing Automatic Downpuller Power Unit
N4s INVERTER The continuation of the Nelson success Benefits:
Electronic relay ER/U 1.1 contact TU/W 1.1 US/U 4.1 ER/U 1.1
What is a Zero Energy House?
Training Course SuperCool 1000 Level 1
Lucius Skid Pics
Solstice All Options Gas Fired Fryer Service Presentation (CE-UK)
Electromagnetic induction
Using electricity safely
Project: Wiring a Building
TEKS 5.6B Demonstrate that the flow of electricity in circuits requires a complete path through which an electric current can pass and can produce light,
Vacuum Control System for Monolith Vacuum
T-6B On-Board Oxygen Generation System (OBOGS)
Presentation transcript:

A-90 Pressure Switches 2013 TSA Meeting UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Single Stage Pressure Switches Single stage furnaces have 2 pressure switches Housing Pressure Switch (HPS) Tapped into Inducer Housing Connects electrically to the CPU of the furnace control board Collector Box Pressure Switch (LPS) Tapped into Collector Box Connects electrically to GVR via furnace control board The HPS has a lower set point than the LPS HPS functions as a blocked vent switch LPS functions as a blocked drain switch UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Single Stage Wiring Diagram Refer to the legend HPS Inducer Housing Pressure Switch, SPST (N.O.) LPS Collector Box Pressure Switch, SPST (N.O.) UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Single Stage Pressure Switches UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Single Stage & Two Pressure Switches UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Two Stage Pressure Switches Two stage furnaces have 2 pressure switches Each switch has its own reference point Not connected by pressure internally High Heat Pressure Switch (HPS) Tapped into Inducer Housing Connects electrically to high heat stage of gas valve Low Heat Pressure Switch (LPS) Tapped into Collector Box Connects back to GVR contact via furnace control board The HPS has a lower set point than the LPS UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Two Stage Wiring Diagram Refer to the legend HPS High-Heat Pressure Switch, SPST (N.O.) LPS Low Heat Pressure Switch, SPST (N.O.) UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Two Stage Wiring Diagram UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Modulating Furnace Pressure Switches Modulating Furnace uses 3 pressure switches Low Tapped to Medium & High pressure switch Medium Tapped to Collector Box & Low pressure switch High Tapped to Low pressure switch Set points are progressive higher Low to High UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Modulating Furnace Pressure Switches Modulating Furnace uses 3 pressure switches Low Tapped to Medium & High pressure switch Medium Tapped to Collector Box & High pressure switch High Tapped to Low pressure switch Set points are progressive higher Low to High UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Modulating Furnace Wiring Diagram UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Modulating Furnace Wiring Diagram UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Modulating Furnace Pressure Switch Labels UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

Modulating Furnace Pressure Switches Low High Medium To Collector Box Switches are linked so one reference hose pulls on the diaphragm of each switch UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

A-90 Pressure Switch Settings Single and Two Stage Pressure Switches Part Number Collector Box Pressure Switch Housing Pressure Switch Max Make-IWC Nom Break-IWC 1184413  0.83 0.68 +/- 0.05 0.49 0.34 +/- 0.05 1184414  0.90 0.75 +/- 0.05 0.45 0.30 +/- 0.05 1184415 0.93 0.78 +/- 0.05 1184951  0.93 0.56 0.41 +/- 0.05 UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

A-90 Pressure Switch Settings Modulating Pressure Switch Settings Maximum Heat Pressure Switch Intermediate Heat Pressure Switch Minimum Heat Pressure Switch Input Max Make-IWC Nom Break-IWC Nom Break- IWC 60,000 17” casing 1.21 1.05 +/- 0.06 0.85 0.70 +/- 0.05 0.62 0.47 +/-0.05 21” casing 1.46 1.29 +/- 0.07 1.00 0.85 +/- 0.05 0.64 0.49 +/- 0.05 80,000 1.58 1.40 +/- 0.08 0.75 0.60 +/-0.05 100,000 1.08 0.93 +/- 0.05 0.87 0.72 +/- 0.50 120,000 1.05 0.90 +/- 0.05 0.80 0.65 +/-0.05 UTC Climate | Controls | Security Proprietary and Confidential Information Not for Further Distribution

A little demo time