April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental.

Slides:



Advertisements
Similar presentations
LS1 & Buildings 115, 507 and 601. Building 601 Building 601 (kitchen & entrance): Power has been cut and disconnected (Patrick Gallay EL) All items removed.
Advertisements

PEPPo Weekly Status Meeting February 16, 2011 & 6MSD Planning Meeting February 23, 2011 Part 1 – Technical summary of layout Part 2 – Month-by-Month Installation.
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Muon Campus Projects Mary Convery 1. Background on Muon Campus plan Earlier Plan had 5 Common Projects:  MC1 Building (GPP)  MC Beamline Enclosure (GPP)
BEPCII RF POWER SYSTEM RF group, IHEP Sep ~ April 1.The 1 st transmitter had finished installing,commissioning and SAT (Site Acceptance Test).
MICE Refurbishment of CERN RF equipment for MICE M. Vretenar, CERN AB/RF.
Schedule Remove ARGUS experiment - Fall 2009 Disassemble and ship OLYMPUS detector - Spring 2010 Ship target and beamline – Fall 2010 Modify DORIS beam-line.
September 15th 2009Olympus technical review at DESY, F.Brinker1 DORIS storage ring Olympus in the IP-region Beam optic, changes on the lattice Beam dimensions,
Status at DORIS Hall New fixed cable channel on the floor for cables from outside to electronics hut Firedetection and network connections rerouted to.
PEP-II Ramp Down to a Minimum Maintenance State J. Seeman DOE PEP-II Ramp Down-D&D Review August 6-7, 2007.
FAC review, 10/27 D. Schultz 1 e-Beams System Update Injector System Installation has started. Linac System Preparing for ’06 installation. Controls System.
Status at DORIS Hall Argus was removed by end of march Argus Parts (except 4 heavy pieces) shipped to Hall 1 Rails of electronics hut have to be extended.
April 6th 2009Olympus Meeting at DESY, F.Brinker1 Vacuum system Available beam scraper Beam dimensions, Target cell Machine Studies on February 7 th 2009.
Status at DORIS Hall Bolted connections of Al- frame made conductive for grounding reasons. Power cable connections rerouted at the top connections. Magentic.
F.Brinker, DESY, July 17 st 2008 Injection to Doris and Petra Fitting the detector in the IP-region Radiation issues Beam optic, Target cell Polarisation.
Prepare DORIS for particle physics again F.Brinker, DESY, March 31 st 2008 Injector chain to Doris and Petra Situation at the IP-region Beam optic Work.
PEP-II and BaBar DND Review M. Sullivan Mar 23-24, 2009Page 1 PEP-II Overview and MMS Status Michael Sullivan SLAC National Accelerator Laboratory.
Status at DORIS Hall June 28th start of mounting the Al- frames, progressig very fast, finished by July 9th All 8 coils pressure tested with 15 bar = O.K.
OLYMPUS U.Schneekloth/R.Beck PRC closed session
Scientific Goals: V. Litvinenko’s RHIC retreat talk Commissioning Goals: I. Pinayev presentation last week Run 14 Goals: Complete assembly of 112 MHz SCRF.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
The Tevatron Decommissioning Plans AEM 10/17/11 Paul C. Czarapata.
ANU Shutdown Status AEM meeting Cons Gattuso 6/3/2012.
ILCTA_NML Progress at Fermilab Jerry Leibfritz September 10, 2007.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
ANU Shutdown Status AEM meeting Cons Gattuso 7 May 2012.
PEP-II Machine Advisory Committee Meeting SLAC, April 15-17, 2004 HOM Issues in LER Ring and IR. Recent measurements and calculations. Sasha Novokhatski.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Accelerator and NuMI Upgrades Shutdown Update Cons Gattuso July 02, 2012 July 2, 2012 Cons Gattuso1.
Discussion points TBM meeting 23/09/2015. Updates Global 3D assembly updated, no severe problems/clashes T1 RF network dimensions updated WPS arms machined.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
Status of and Installation Plan for DC Gas Control System and Target Work Scheduling Meeting 4 August 2006 PSI W. Molzon, Feng Xiao.
Yousef I. Makdisi DIS03 St. Petersburg April 24,2003 Polarized Jet target status The overall view The Dissociator stage The Atomic Beam stage The RF transitions.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
NML/RFCA002 Status ILC Cryomodule meeting 3 July 2012 E. Harms.
DA  NE: status report M. Preger on behalf of the DA  NE team 22/11/2010.
8/29/07K. C. Wu - Brookhaven National Lab1 Major Components in ILC IR Hall Interchangeable Detectors.
CV Activities for PSB-LIU POPS-B (new MPS for the PSB-LIU) B 245 PSB Demi water cooling plant Stefano Moccia, EN-CV Meeting 07/03/16.
Proton PMG September 3 rd 2015 Cons Gattuso AD Shutdown Manager.
ILCTA_NML Progress at Fermilab Jerry Leibfritz August 16, 2007.
Mechanical Upgrade Interaction Region IR1 Luigi Pellegrino Mechanical Engineering Group (LNF Scientific Committee, May 9, 2013)
Work in the Tevatron A0 D0 B0 C0 E0 F0 Separators A49 Separator B48 TEL 2 installation A0 Xtal Collimator 1.5 m collimator A48 Shimming 6 magnets/day At.
Mini MAC II PEP-II hardware M. Sullivan Apr 23-24, 2009Page 1 PEP-II Hardware Status M. Sullivan SLAC National Accelerator Laboratory Mini-MAC II Frascati,
ELENA installation progress F. Butin / ELENA collaboration.
November 12-13, 2007 Super-B Factory: Accelerator Costing, PEP-II Hardware and Schedule J. Seeman SLAC International Review Committee meeting November.
S A Griffiths CM42 June 2015 Electrical & Control.
Report Technical Director Storage-Ring-Installation Completed
HMS Status Steven Lassiter Jan 20, 2017.
High energy beam transport.
The Survey of the Power Supply Reliability at SSRF
St. George Infrastructure
CBETA Technical Review
ELENA installation and commissioning status
AD consolidation activities in LS2
Hosting Orsay Walid KAABI
Vacuum System Failures at HERA
Accelerator Module Test Facility
BEPCII RF POWER SOURCE AND INPUT COUPLER
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
XFEL Collimation and Beam Switchyard Vacuum Issues
Maintenance at ALBA facility: Strategy for the conventional services
Status of RF at HZB: BESSY II, MLS, bERLinPro and BESSY VSR
Polarized 3He target installation
Presentation transcript:

April 6th 2009Olympus Meeting at DESY, F.Brinker1 Detector power supply Detector cooling Polarity switches Kicker pulser Preparation of the experimental hall Modification of the IP region Installation of Olympus Time schedule Infrastucture and Schedule

April 6th 2009Olympus Meeting at DESY, F.Brinker2 Detector power supply A 10kV to 480V transformer is available and will be placed outside the experimental hall The foundation has to be prepared The 7000 A power supply from Petra has to be installed in the hall The cabling to the transformer (10kV), to the power supply (2500A, 480V DC) and to the detector (7000A, 225V DC) has to done ( ~ 9 km cable in total )

April 6th 2009Olympus Meeting at DESY, F.Brinker3 Water cooling A cooling water circuit for about 1.6 MW for the toroid has to be installed The capacity of the cooling tower is sufficient the place for the heat exchanger and the water pump is available near water supplies from the cooling tower A heat exchanger and a water pump can be reused from Hera/Zeus The tubes, regulation and electronics will be new Cooling for the moved cavities is still available, the last few meters are missing Cold water for air conditioning is available, tubes have to be laid

April 6th 2009Olympus Meeting at DESY, F.Brinker4 Polarity switches There are 46 main magnet power supplies at DORIS and the transport line 12 of those are already replaced by bipolar devices 10 devices with currents below 270A can be modified with polarity switches from HERA The remaining 24 devices need new polarity switches, 14 devices for 400A and 10 devices for 800A Cabinets, controls and cabling have to be done

April 6th 2009Olympus Meeting at DESY, F.Brinker5 Trans- former Water cooling Power- supply

April 6th 2009Olympus Meeting at DESY, F.Brinker6 Kicker pulser The extraction/injection elements at DESY and DORIS have to be bipolar The Septa can be modified accordingly The Kicker ( 2 DORIS + 1 DESY ) need new power supplies, which can be build at DESY ( spare parts? )

April 6th 2009Olympus Meeting at DESY, F.Brinker7 Preparation of the experimental hall Parts of the hall are in use as store room, the parts here have to be removed Another part is used for an DESY exhibition, these objects will be removed and partly find a new home in HERA hall west The ARGUS detector has to be disassembled and removed This work can start soon and should be finished by the end of this year

April 6th 2009Olympus Meeting at DESY, F.Brinker8 Modification RF-lab An RF laboratory for testing of Tesla cavities is placed on the outside of the DORIS ring A rectangular region of 2.5 x 9.5 m has to be cut out –Install dust cover –Remove walls –Cut ceiling and floor –Build new walls –Change installations ( crane, electricity, water etc.) This work can start in summer 2010, when the ongoing work in the laboratory is finished (earlier, if possible)

April 6th 2009Olympus Meeting at DESY, F.Brinker9 Modification of the IP region (1. shut down ) Move signal cables from IP region ( can be done in advance ) Remove interlock installations Remove shielding blocks Remove accelerator components –Cavities, vacuum chambers –4 quadrupoles –Girders Install dust cover Demolition work on parts of concrete

April 6th 2009Olympus Meeting at DESY, F.Brinker10 Modification of the IP region Build up new shielding Install new girders/support for experiment vacuum Put in 6 new quadrupoles Install vacuum system, including target chamber and new vacuum valves Install cavities at the new position Cabling, water connections Install modified interlock system Surveying

April 6th 2009Olympus Meeting at DESY, F.Brinker11

April 6th 2009Olympus Meeting at DESY, F.Brinker12 Installation of Olympus ( 2. shut down) Remove part of shielding Remove vacuum system between valves Roll in the detector Install vacuum chambers Connect cooling water and electrical power Rebuild shielding Surveying Interlock tests

April 6th 2009Olympus Meeting at DESY, F.Brinker13

April 6th 2009Olympus Meeting at DESY, F.Brinker14

April 6th 2009Olympus Meeting at DESY, F.Brinker15 Background studies Parasitic studies + some days (~5) full operation