SOFIA SOFIA Science Steering Committee Meeting Palmdale, Feb 18, 2010 Dietmar Lilienthal / Alois Himmes.

Slides:



Advertisements
Similar presentations
Work Plan Development Guidelines and Schedule.
Advertisements

Work Plan Development Guidelines and Schedule.
Seminar on European Territorial Co-operation – Brussels - 21 February 2005 Cross border co- operation at the EU external borders Seminar on Territorial.
CCAT Project Status. The Project: Phase 1: Feasibility/Concept Design Study, $2M, completed and peer reviewed Phase 1: Feasibility/Concept Design Study,
Space Science Project Funding by the German Space Agency (German Aerospace Center, DLR) Werner Klinkmann, DLR Space Agency, Bonn.
NETLIPSE Infrastructure Project Assessment Tool Stuart Baker, Deputy Director of National Rail Projects Department for Transport, UK Zagreb, November 10,
European COoperation in the Field of Scientific and Technical Research Role and rules of procedure for Management Committee Carine Petit Science Officer.
Implications of the Localism Act for Parishes Andrew Muter Chief Executive Newark & Sherwood District Council 1 October 2012.
VISTA as seen by the Prime Contractor Adrian Russell.
Forest Carbon Partnership Facility Participants Committee Meeting (FCPF PC3) Montreux, Switzerland, June 16-18, 2009 Sources and Uses of Funds in the Readiness.
OPTICON Board Meeting, Porto, OPTICON WP4 Interferometry Status Report D. Mourard presented by A. Chelli.
1 EFCA - 21th March 2002 Raul Mateus Paula. 2 This presentation underlines: The key objectives of the Relex Reform The division of the responsibilities.
SOFIA SSSC Program Status Robert Meyer Program Manager September 29, 2009.
Association for the Education of Adults EAEA European AE Research – Look towards the future ERDI General Assembly, 2004.
1 Universities Space Research Association SOFIA Program Options SSSC 18 February 2010 Mina Cappuccio SOFIA Science Project Manager NASA Ames Research Center.
Introduction 1 Proposal for the structure of FAIR GmbH construction phase 2 Relationship between FAIR GmbH and GSI mbH construction phase Contract Site.
SOFIA Program Overview CSTA Eddie Zavala Deputy Program Manager October 21, 2011 SS1 Orion Image.
1 Universities Space Research Association AAS January 7, 2008 Early Science Workshop Range of E&PO Office Responsibilities Public Affairs (Public Information,
1 Engineering the James Webb Space Telescope Paul Geithner JWST Deputy Project Manager - Technical March 26, 2011.
Stratospheric Observatory for Infrared Astronomy Deutsches SOFIA Institut 18. Feb SSSC Th. Wegmann DSI Activities and FIFI-LS Thomas Wegmann, Thomas.
1 R. D. Gehrz 66th International Symposium on Molecular Spectroscopy, Columbus, OH, June 23, 2011 The Stratospheric Observatory for Infrared Astronomy.
SSSC 02/18/2010 P. Marcum Science Utilization Policies SOFIA SCIENCE UTILIZATION POLICIES Pamela M. Marcum SOFIA Project Scientist SSSC Feb 19, 2010.
ILA 2003 in Boulder, Colorado 4-6 November 2003 NELS beyond 2005 Gunn Marit Hernes NELS Co-ordinating Agency Office (CAO) Northwest European Loran-C SystemCo-ordinating.
The European Marine Observation and Data Network IT Steering Committee 31 January 2013.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
Harvey Tananbaum Director Chandra X-ray Center Harvard-Smithsonian Center for Astrophysics 13th HEAD Meeting April 8, 2013 Building International Space.
NIEM Domain Awareness June 2011 Establishing a Domain within NIEM.
1 INSTITUTE OF SPACE SYSTEMS Universität Stuttgart Universities Space Research Association Deutsches SOFIA Institut American-German.
COROTWEEK n°8 Toulouse May the 24th, 2005 Program Status (Th. Lam-Trong) 1 COROT.
Sophie Sergent Ifremer European Affairs Department / MariFish WP7 ERANET MariFish COORDINATION OF EUROPEAN MARINE FISHERIES RESEARCH Presentation of MariFish.
WHAT IS JESSICA-1 ?  JESSICA stands for Joint European Support for Sustainable Investment in City Areas  JESSICA is an optional facility  JESSICA offers.
Science and Technology Committee GGOS, December 2006.
1/11/2011AAS SOFIA splinter (Seattle, WA) 1. 1/11/2011AAS SOFIA splinter (Seattle, WA) 2 SOFIA Stratospheric Observatory for Infrared Astronomy 2.7-meter.
SOFIA 2 nd Generation Instrument Plans & Technology Development Paul Hertz SOFIA Program Scientist & SMD Chief Scientist SOFIA Science Steering Committee.
1 R. D. Gehrz 64th International Symposium on Molecular Spectroscopy, Columbus, OH, June 23, 2009 The Stratospheric Observatory for Infrared Astronomy.
1 1 SOFIA: Progress and Initial Science Flights Erick Young SOFIA Science Mission Operations Space Telescope Science Center March 30, 2011.
Physics of the Cosmos Program Analysis Group John Nousek Penn State University International Workshop on Astronomical X–Ray Optics Prague, Czech Republic.
LIGO-G M Planning and Implementation Strategy for Advanced LIGO Gary Sanders LSC Meeting Hanford, August 14, 2001.
Oct.10, 2007EAMA7 The next-generation Infrared astronomy mission SPICA Outline of SPICA Scientific Research Concept (SciReC) SPICA 研究コンセプト概要 17 th May.
Folie 1 > SSSC/SITR Meeting, NASA-ARC > September 28/29, 2009 > D. Lilienthal SSSC/SITR Meeting NASA-ARC, September 28/29, 2009 Dietmar Lilienthal, DLR.
1 R. D. Gehrz 67th International Symposium on Molecular Spectroscopy, Columbus, OH, June 21, 2012 The Stratospheric Observatory for Infrared Astronomy.
SSC SI Data Processing Pipeline Plans Tom Stephens USRA Information Systems Development Manager SSSC Meeting – Sept 29, 2009.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
OWL Concept Design Review Report to ESO Council 8 th Dec 2005.
Institute for Astronomy and Astrophysics, University of Tübingen June 28, 2006WSO/UV Implementation Committee Meeting Moscow 1 WSO/UV: Situation in Germany.
S 1 Annual Meeting 2013 Management and reporting (WP6) Chiara Bearzotti NACLIM project manager.
SOFIA--The Next Generation Airborne Observatory 2.5-meter (100-inch) telescope in a Boeing 747SP Based at NASA-Dryden’s Aircraft Ops Facility in Palmdale,
1 Universities Space Research Association Introduction, Charter and Feedback Eric Becklin SSSC 18 Feb 2010.
1 Douglas Hudgins Exoplanet Exploration Program Scientist Presentation to ExoPAG#8, Denver Colorado October 5, 2013.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 Governance.
LISA News from ESA O. Jennrich LISA Project Scientist.
SITR September 2009; Page 1 MPIfR KOSMA MPS DLR-Berlin S. Heyminck, MPIfR GREAT GREAT: German REceiver for Astronomy at Terahertz frequencies PI-Instrument.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
The EGTC, a suitable instrument for Article 37(6)b? Background and main questions 17 March 2011 | Paris.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
PACS IBDR 27/28 Feb 2002 PACS ICC1 ICC (EGSE, IA/QLA, HCSS) Otto H. Bauer MPE Garching.
1 Universities Space Research Association Martin Ruzek SSSC February 18, 2010 FIFI LS EOOP Extended Observing Opportunity Program Operating FIFI LS in.
1 Universities Space Research Association Science Instrument Pipeline Requirements SSSC 2009 September 29 Erick Young Director SOFIA Science Mission Operat.
Regional Policy Performance framework review and reserve Jan Marek Ziółkowski Evaluation and European Semester Unit DG for Regional and Urban.
Near-term schedule Scott Horner. Background MCCS software engineering build #3 was delivered in June and tested by the SIL team in early July A number.
G O D D A R D S P A C E F L I G H T C E N T E R 1 Status of LISA Jordan Camp LISA Deputy Project Scientist NASA / Goddard Space Flight Center Jan. 19,
Frank Helmich, Co-head of SRON’s astrophysics program Groningen Introduction to SRON.
Preparing for the Future: NASA's Planning for the Decadal Survey
Quantum Leap Project Management
SOFIA Program Status Bob Meyer January 10, 2010 Program Manager.
SOFIA--The Next Generation Airborne Observatory
Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.
Airborne Astronomy Ambassadors (November 2017)
Welcome & Charge for the Meeting
Water Directors meeting Spa, 2-3 December 2010
Presentation transcript:

SOFIA SOFIA Science Steering Committee Meeting Palmdale, Feb 18, 2010 Dietmar Lilienthal / Alois Himmes

DLRSSSC Palmdale, Feb 18, Programatic aspects in Germany New government in Germany since autumn 2009 keeps Science and Technology a high priority DLR budget for 2010 unchanged, expectation is continuity for the coming years SOFIA budget stable for the medium term period , implemented in DLR long term planning beyond 2012 Rev of JSPP II signed by NASA and DLR

DLRSSSC Palmdale, Feb 18, Science Mission Operations Deputy director The international search committee for the (DSI funded) SMO Deputy Director recommended a candidate to DLR, unanimously DLR authorized DSI / Universität Stuttgart to start negotiations with the selected candidate Decision expected soon

DLRSSSC Palmdale, Feb 18, Major technical achievements since autumn 2009 Identification of Gyro failure and repair at IXSEA (in France) and provision of 4th (spare) gyro. Successful re-integration and tests during several LineOps Additional Line Replacable Gyro Box / Gyros to be procured at IXSEA, delivery early 2010 Continued repairs and improvements of the Telescope Assembly (TA) and procurement of most needed spare parts Another TA LineOps demonstrated TA readiness to start next phase of closed and open door flights with passive and activated TA TA-activation but still closed door flight in Jan 2010 including simulated observing legs showed promising results. Details in separate presentation by Thomas Keilig at SITR

DLRSSSC Palmdale, Feb 18, Issues and Concerns as seen by DLR (1) The MPE in Garching announced to terminate their involvement in SOFIA DSI with support from USRA/SMO and DLR is investigating how FIFI-LS can be finished, maintained and scientifically used as Facility Instrument, see separate presentations by Thomas Wegmann and Randolph Klein DLR continues to support both German science teams to bridge the gap until science results are demonstrated. The continous schedule delays required an extension of those grants by 2 years to Dec This is still valid also for FIFI-LS, depending on a successful FIFI-LS recovery plan Both grants are funded from the same budget line as the DSI, thus reducing the money available for Telescope related activities

DLRSSSC Palmdale, Feb 18, Issues and Concerns as seen by DLR (2) The funding of the Science Teams by MPG had already been substantially reduced or even stopped (DFG) since The MPE is one of the leading institutes for IR-Astronomy in Europe. Termination of the MPE-involvement in SOFIA, which will have been definitely noticed by German funding authorities, makes the situation even worse Yesterday, ESAs Science Programme Committee decided to continue with the definition phase for the ESA part of the Japanese IR-Mission SPICA. ESA would provide the 3,5m cryogenic telescope, and European member states one major instrument SAFARI (imaging Fourier Transform Spectrometer). Putting all these indications together, the perspective for the development of next generation SOFIA instruments and thus the continuation of a German participation in SOFIA has not improved over the last years, month and weeks in Germany