1 Loran-C Maintenance Support Presentation at the 31 st Annual Convention and Technical Symposium of the International Loran Association October 28, 2002.

Slides:



Advertisements
Similar presentations
Managing Hardware and Software Assets
Advertisements

ATS 5A - 1 The Art of Tech Support John Abbott College How to Work with Vendor Support M. E. Kabay, PhD, CISSP Director of Education, NCSA President, JINBU.
September 2013 ASTM Officers Training Workshop September 2013 ASTM Officers Training Workshop MAIN COMMITTEE OFFICERS DUTIES AND RESPONSIBILITIES September.
Task Group Chairman and Technical Contact Responsibilities ASTM International Officers Training Workshop September 2012 Scott Orthey and Steve Mawn 1.
Membership & Roster Maintenance Officers Training Workshop September 2012 Kevin Shanahan 1.
Business Process Improvement in the Economic Programs Directorate at the U.S. Census Bureau Deborah M. Stempowski Shirin A. Ahmed U.S. Census Bureau ICES.
Cultural Heritage in REGional NETworks REGNET Project Meeting Content Group Part 2: Functional Testing.
RECORD KEEPING Cooperative Development of Operational
for Cabin Safety Inspectors
Aviation Security Training Module 4 Design and Conduct Exercise II 1.
Lisa Brown and Charles Thomas LAWNET 2002 Taking the Mystery Out of Project Management.
1 NORTH CAROLINA COUNCIL OF INTERNAL AUDITING October 31, 2007.
BUILDING THE CAPACITY TO ACHIEVE HEALTH & LEARNING OUTCOMES
Prepare LSR/SUPP using electronic system AT&T Prepares Order to send to BST Order Type? 1.0 AT&T Coordination required? Non-Mechanized Mechanized or Partially.
0 - 0.
Addition Facts
Modern Systems Analyst and as a Project Manager
IAEA Training in Emergency Preparedness and Response Module L-051 General Concepts of Exercises to Test Preparedness Lecture.
HEAT TRACING SPECIALIST
Gaining Senior Leadership Support for Continuity of Operations
Site Safety Plans PFN ME 35B.
Presented by: Guy Prescott Common Sense Safety, Inc. (530)
Energy Service Fossil Product Portfolio
Transition from the Long Shutdown to Hot Checkout: Pre-Hot Checkout Steve Suhring Operability Manager 6/6/13.
RTI International RTI International is a trade name of Research Triangle Institute. Enhancing an Organizations Capabilities for Technical Assistance.
Report Tile United States Office of Personnel Management TRAINING & MANAGEMENT ASSISTANCE PROGRAM TMA Contractor Conference 2007.
Background Presenters Work done in preparation for WHS changes
FCX Performance, Inc.. The Power of One 2 World class flow control solutions built on over 100 years of experience FCX does not run businesses; we provide.
Effective Contract Management Planning
Contents Introduction and Background The Objective Recommendations
Effective Engineering April 2002, Burbank, CA 1. Effective Engineering April 2002, Burbank, CA 2.
Customer Service.
GSA Federal Supply Service DOING BUSINESS WITH GSA.
1 © 2006 Avaya Inc. All rights reserved. Avaya – Proprietary & Confidential. Maintenance Charlie Haynie Services Sales Specialist.
Zonal & Station Identification Systems
1 Procuring a Design Project engineers perspective on starting the design process and establishing the A/E scope of work Frank C. Quigley General Engineer.
ODOT’s Public Involvement Process PI and the Project Development Process Minimum PI Requirements.
Reorganization of the Costa Mesa Police Department
City Council Meeting Agenda Items October 28, 2013.
Visual 5.1 General Staff Functions Unit 5: General Staff Functions.
Functional Areas & Positions
IAEA Training in Emergency Preparedness and Response Development of Simulation Exercise Work Session (Drill) Module WS-012.
Addition 1’s to 20.
Test B, 100 Subtraction Facts
Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved Chapter The Future of Training and Development.
Aviation Management System 1 2  Silver Wings Aircraft Aviation Management System represents a functional “high – end” suite of integrated applications.
1 BROOKHAVEN SCIENCE ASSOCIATES Site Preparation Lessons Learned Michael P. Bromfield, Construction Engineer Convention Facilities Advisory Committee Review.
Chapter 2 Careers in Fire Protection. Introduction CAREER OPPORTUNITIES Many different jobs are available in the fire protection field Both public and.
REQUEST FOR PROPOSALS RFP #08-56 Project Management and Procurement Assistance Consultant for an Intelligent Transit System Solution (I.T.S.S.) October.
NJDEP Maintenance Guidance for Stormwater Management
SE 464: Industrial Information systems Most Images and inform. used in these slides are SAP © Not to be used for other than educational purposes Systems.
1 IS112 – Chapter 1 Notes Computer Organization and Programming Professor Catherine Dwyer Fall 2005.
Roles of IT Personnel Unit Customer Service This is a facility that helps customers with wide-ranging questions relating to a specific company,
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
2 Systems Architecture, Fifth Edition Chapter Goals Describe the activities of information systems professionals Describe the technical knowledge of computer.
Facilities Management and Design
TQM Study For Telecom Towers King Fahd University of Petroleum & Minerals Department of Construction Engineering & Management CEM 515: Project Quality.
Local Area Augmentation System (LAAS) LOGISTICS Alaskan Region Briefing 1 October 2002 Jim Hanrahan, FAA ARN-100.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Construction of a Transfer Station
December 9, 2015 Slide 1 Specialty Underwriters Equipment Maintenance Service (EMS)
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
“Status of the Loran Recapitilization Project” FAA Team Meeting – July 2002 CDR G. K. Weeks Jr., U. S. Coast Guard, Commanding Officer USCG Loran Support.
Review of the operation scenarios and required manning of the activities P. Schnizer and L. Serio.
Retrofitting and Maintenance. Regular Maintenance is Necessary Failure to Perform Maintenance Leads to….. Diminished Performance Deterioration Failure.
ACS ACTIVATION. The first section of this presentation describes the initial activities of the ACS Staff. The second section describes the initial activities.
Anytime, Anywhere Access Benefits Functionality Work Order Administration Dispatch Work Order Work Order Details New Work Order Additional Functionality.
Physical Security at Data Center: A survey. Objective of the Survey  1. To identify the current physical security in data centre.  2.To analyse the.
Introduction DEFINATION :-
{Project Name} Organizational Chart, Roles and Responsibilities
Presentation transcript:

1 Loran-C Maintenance Support Presentation at the 31 st Annual Convention and Technical Symposium of the International Loran Association October 28, 2002 Washington, DC Charles Stevens, PhD, PE, Raytheon Technical Services Company CDR (select) Alan Arsenault, United States Coast Guard Technical Services Company

2 Outline Background Background Scope of Contract Scope of Contract General Approach General Approach Preventive Maintenance Preventive Maintenance Corrective Maintenance Corrective Maintenance Call Center Call Center Staffing Staffing Remote Sites in Alaska Remote Sites in Alaska Conclusions Conclusions

3 Background Demands on Coast Guard Require most efficient use of resources. Unstaffing Loran Transmitter sites could make a significant number of Coast Guard personnel resources available for other mission areas. Loran Recapitalization Project permits remote operation and allows un-manning of Loran Transmitter Stations. Included possible future contractor maintenance of Loran infrastructure as part of NDGPS contract won by Raytheon Technical Services Company.

4 Scope of Contract Tasked Raytheon to provide a study recommending approach to contract maintenance. Study to include providing Preventive and Corrective Maintenance at 24 LORSTA and PCMS Sites. Satisfy CM Response and Repair Times Time to Dispatch = 30 Minutes Time to Commence Repairs: >> 3 hours for System Casualty >> 12 hours for other Time to Complete Repairs: >> 8 hours for System Casualty >> 24 hours for other

5 Scope – Other Requirements Coordinate site activities and visits. Site security and safety. Maintain 7x24x365 Call Center and call escalation arrangement. Supply and Logistics Support: Perform and maintain inventory, requisition and property logs. Procure or acquire consumables and replacement parts and materials not in supply system -- Through supply system or procurement Provide a variety of reports and maintain records and logs.

6 Scope – Assumptions LORSTA: 12 PM/2 CM visits per year PCMS Site: 1 PM/1 CM visit per year. Contractor training provided using CG resources. All site technical data provided to contractor. All tools and test equipment provided by CG. Initial full complement of on-site spare parts provided. Contractor has no equipment operations role. Contractor has no base operations role. During transition any deficiencies will be identified and resolved. Limited Tower and antenna maintenance requirements.

7 General Approach Formed team with Raytheon, WR Systems and Coast Guard to develop approach. Conducted site survey at Jupiter Inlet and Sandy Hook for site familiarization. Conducted study to determine required level of effort necessary to accomplish PM and CM and related site support. Developed maintenance and management approach to satisfy requirements. Prepared report.

8 General Approach – Program Plan Program Plan Approach Section Section Title 1.0Introduction 2.0 Maintenance Requirements 3.0Maintenance Approach 4.0Management Approach 5.0Cost Estimate

9 General Approach - Maintenance Staff LORSTA with full-time Station Manager and on-call Technicians. Develop PM Schedule – Accomplished by Station Manager, with on- call Tech or Subcontractor support. Respond to Trouble Calls – Duty Technician and Station Manager. LORSTA staff respond to PM/CM requirements at local PCMS Site(s). Maintenance of Auxiliary Systems: Backup Power – subcontractor UPS – OEM warranty Tower Lighting – subcontractor Halon CO2 System – subcontractor

10 General Approach - Maintenance Facilities Maintenance: Shelter/Building – TBD Grass Mowing – Subcontractor Vegetation Control/Weeding – Subcontractor Fence and Gate Maintenance – Subcontractor or Station Team Access Road – Subcontractor Snow Removal – Subcontractor Site Security – Station Manager

11 Preventive Maintenance PM Estimates Per Site LORSTA - Range of 81.4 to 91.4 man hours/year/site – accomplished by 12 visits/year of 7+ man hours each. Assume 4 hours for PM and troubleshooting and remaining time for needed repairs. PCMS Site hours/year/site – accomplished by 1 visit/year

12 Corrective Maintenance CM Estimates Per Site LORSTA: Electronics - 2 responses/year and 4 hours/response. Diesel Generator - 1 response/year. HVAC - 1 response/year. Antenna Lighting - ½ response/year. PCMS Site: Electronics - 1 response/year and 1 hour/ response plus travel time. HVAC - 1 response/year.

13 Management Approach - Loran Maintenance Organizational Chart Program Manager Technical Manager Loran Field Lead Installation Lead NDGPS Field Lead EngineeringLogistics & Material Field Support Maintenance Technician Pool Loran Station A Station Manager On-Site Part- time Technicians Loran Station B Station Manager On-Site Part- time Technicians Loran Station C Station Manager On-Site Part- time Technicians Corporate Staff SupportProgram Staff Support

14 Call Center Process Call Center Receives Service Call – Identifies associated site, POC and nature of problem Station Manager provides duty roster and backup phone numbers Coast Guard Reports Maintenance Requirement Call Center Contacts Duty technician at site. Successful? Call Center Contacts Station Manager at site. Successful? Responds to Service Call Call Center Contacts Technical Manager. Successful? Yes No Responds to Service Call Yes Further Escalation -- PM, WRSystems No

15 Staffing Requirements

16 Remote Sites in Alaska Conditions inherent to Alaska require a different model than lower 48 sites. 3 hour response is not practical from off-base on-the-economy personnel. Proposed approach is 24x7x365 manning, with two man watch on-site until relieved. Requires Base Operations Type Contract and more detailed study. Suggest teaming with Native American (Alaskan Indian) Small Business Subcontractor. RTSC has business relationships with numerous Alaskan Indian Small Business Subcontractors.

17 Conclusions Contractor maintenance of Loran-C is viable and can satisfy CG needs. Raytheons NDGPS Program Office could provide the management and logistics infrastructure to support Loran-C maintenance. LORSTAs will be staffed with a full-time Station Manager and on-call technicians. Transition Planning will occur as part of initial site planning and serve as lessons-learned for future site conversions.

18