Our z/OS System Setup Company Name Introduction to z/OS

Slides:



Advertisements
Similar presentations
©HCCS & IBM® 2006 Stephen Linkin 1 Overview Of System Programming Stephen S. Linkin Houston Community College © HCCS and IBM 2006.
Advertisements

Our z/OS Security Introducing z/OS Security 1 hour PowerPointOur z/OS Security PowerPoint Our z/OS Security Administration and Auditing Webinar Understanding.
Genesis: from raw hardware to processes System booting sequence: how does a machine come into life.
Introduction to the new mainframe © Copyright IBM Corp., All rights reserved. Chapter 2: z/OS Overview.
Introduction to z/OS Basics © 2006 IBM Corporation Chapter 16B: The IPL process.
Introduction of z/OS Basics © 2006 IBM Corporation Chapter 5: Working with data sets.
Introduction to z/OS Basics © 2006 IBM Corporation Chapter 16: Topics in z/OS System Programming.
Hands-On Microsoft Windows Server 2003 Chapter 2 Installing Windows Server 2003, Standard Edition.
Cambodia-India Entrepreneurship Development Centre - : :.... :-:-
Irwin/McGraw-Hill Copyright © 2000 The McGraw-Hill Companies. All Rights reserved Whitten Bentley DittmanSYSTEMS ANALYSIS AND DESIGN METHODS5th Edition.
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
Introduction to the new mainframe: z/OS basics © Copyright IBM Corp., All rights reserved. Chapter 16 Topics in z/OS system programming.
Installing Windows Vista Lesson 2. Skills Matrix Technology SkillObjective DomainObjective # Performing a Clean Installation Set up Windows Vista as the.
© 2006 Jupitermedia Corporation Webcast TitleSuccessful Rollout Planning 1 January 19, :00pm EST, 11:00am PST George Spafford, President Spafford.
CICS – Mainframe (LC) 2 Copyright © 2005, Infosys Technologies Ltd ER/CORP/CRS/TP01/003 Version No: 1.0 Course Schedule Day1 - Introduction to CICS Day2.
Our IMS Systems IMS Overview 1 hour PowerPointOur IMS Applications and Data PowerPoint Our IMS Systems Webinar Understanding IMS and Your Role = Datatrain.
Chapter 8 Implementing Disaster Recovery and High Availability Hands-On Virtual Computing.
Our Data Management and Transaction Processing Company Name 1 |Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence z/OS Application.
Understanding Application Programming Procedures Company Name Date - Time 1 |Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence z/OS.
Understanding Systems Programming Procedures and Roles Company Name Date - Time 1 |Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence.
Installation and Upgrade Campus-Booster ID : **XXXXX Copyright © SUPINFO. All rights reserved Solaris 10 installation.
Our Mainframe Networks Company name 1 |Copyright © Interskill Learning Pty Ltd 2012 – Commercial in Confidence Introducing Mainframe Networks 1 hour PowerPointOur.
© 2004 IBM Corporation IBM ^ z/VM Module 2: Conversational Monitor System (CMS)
Our z/OS Security Administration and Auditing Company name Introducing z/OS Security 1 hour PowerPointOur z/OS Security PowerPoint Our z/OS Security Administration.
Introduction to the new mainframe © Copyright IBM Corp., All rights reserved. Chapter 4: Working with data sets.
Our COBOL Programming COBOL Programming - Basics 1 hour PowerPoint Our COBOL Environment PowerPoint Our COBOL Programming Webinar Understanding COBOL and.
Our COBOL Environment COBOL Programming - Basics 1 hour PowerPoint Our COBOL Environment PowerPoint Our COBOL Programming Webinar Understanding COBOL and.
Our DB2 Data DB2 Fundamentals 1 hour PowerPoint Our DB2 Data PowerPoint Our DB2 Systems Webinar Understanding DB2 and Your Role = Datatrain Course Modules.
I Copyright © 2007, Oracle. All rights reserved. Module i: Siebel 8.0 Essentials Training Siebel 8.0 Essentials.
Our DB2 Systems Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence1 | Company name DB2 Fundamentals 1 hour PowerPoint Our DB2 Data.
Identifying and Gathering Problem Data Company Name 1 |Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence Identifying z/OS System.
Our Programming and Batch Systems Company Name 1 |Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence z/OS Application Development.
Our JES and Network Setup
Lecture 4 Mechanisms & Kernel for NOSs. Mechanisms for Network Operating Systems  Network operating systems provide three basic mechanisms that support.
Understanding Data Center Operations and Your Role Company Name Date - Time 1 | Introduction to the IBM Enterprise Environment 45 minutes 1 hour PowerPoint.
Our Mainframe Network Operations Company name 1 |Copyright © Interskill Learning Pty Ltd 2012 – Commercial in Confidence Introducing Mainframe Networks.
Our IMS Applications and Data IMS Overview 1 hour PowerPointOur IMS Applications and Data PowerPoint Our IMS Systems Webinar Understanding IMS and Your.
Our Mainframe Under the Microscope Company name 1 | Introduction to the IBM Enterprise Environment 45 minutes 1 hour PowerPoint Our Data Centre Structure.
Installing Windows 7 Lesson 2.
© 2002, Cisco Systems, Inc. All rights reserved.
XINFO – How to use XINFO in Development
ETERNUS DX100 S3, DX200 S3, DX500 S3 and DX600 S2
Deploying and Configuring SSIS Packages
Our Data Center Structure
System Monitoring Practices and Procedures
Introduction of Week 3 Assignment Discussion
CONFIGURING HARDWARE DEVICE & START UP PROCESS
Installing the HI 6600 into the CompactLogix System.
Economics, Administration & Information system
IT for Students Need IT Help? Visit
Understanding COBOL and Your Role
JCL Standards #2 Company Name
Honeywell Automation College
Understanding System Problem Resolution
JCL Standards #5 Company Name
JCL Standards #3 Company Name
Our CICS Systems Company name CICS TS - Introduction Graphic
Our Mainframe Applications and Subsystems
Deliverables to Celebration
Company Name Date - Time
Understanding IMS and Your Role
Company Name Date - Time
Understanding System Monitoring Tasks and Roles
Course: Module: Lesson # & Name Instructional Material 1 of 32 Lesson Delivery Mode: Lesson Duration: Document Name: 1. Professional Diploma in ERP Systems.
Understanding DB2 and Your Role
System Problem Resolution Practices
Handling SMF and System Messages
System Start-Up and Shutdown
Exercise Name player Briefing
In Today’s Class.. General Kernel Responsibilities Kernel Organization
Presentation transcript:

Our z/OS System Setup Company Name Introduction to z/OS Systems Programming 55 minutes Virtual Storage & Address Space Concepts 45 minutes Working with System Data Sets 45 minutes Working with System Parameter Lists 45 minutes Initializing the z/OS System PowerPoint Our z/OS System Setup 40 minutes Configuring JES2 70 minutes Issuing VTAM and TCP/IP Commands Graphic: Insert your organization’s name in the above slide. Audio: will need to cover the following: Welcome to “Our z/OS System Setup” presentation. My name is _____. I work in the ___ department and have worked as a Systems Programmer in our organization for ___ years (This should be expanded so the learner is confident that you have the right credentials to create this presentation.). This presentation follows on from the first three modules of the Datatrain “Introduction to z/OS Systems Programming” course. We will expand on some of the information in these first modules, and relate it to our site. We will also take a look at the z/OS systems setup that we have. If you have any questions about the course, or this presentation, send it to _______ so that it can be covered in the Webinar discussion at the end of this learning pathway. Our z/OS System Setup PowerPoint Our JES and Network Setup Company Name Webinar Understanding Systems Programming Procedures and Roles Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence

Presentation Topics Our System Configuration Storage and Page Datasets Systems Residence Volumes System Dataset Naming System and Parameter Libraries SMP/E Environment IPLs At Our Site Audio: will need to cover the following: The Datatrain modules you have completed have described the types of system data sets and parameters you may encounter on your system. In this presentation you will see which of these items is implemented in our organization and how system start-up is performed. Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence

Our z/OS system setup z/OS 1.11 – SYSA z/OS 1.11 – SYSB z/Linux – LNX1 (Production) z/OS 1.11 – SYSB (Production) z/Linux – LNX1 z/Linux – LNX2 z/VM – VM01 z/VM – VM01 LP1101 LP1201 z/OS1.12 – SYSD (Development) z/OS1.12 – SYSS (Systems Programmer) Graphics: Update the picture with a diagram of your systems. Audio: will need to cover the following: Include brief descriptions of: Physical Processor Logical Partition setup. If z/VM is used. Other non-z/OS systems on the processors. Each z/OS system: z/OS release, what it is used for, production/development/test. Example: In our organization we have four z/OS images running in two z196 processors. SYSA and SYSB are our production regions: SYSA runs most of the IMS, SYSB the CICS and CA-Datacom. These regions run under z/VM. SYSD is the development z/OS system, and SYSS is for Systems Programmer testing. SYSS is only IPLed when we need it. We also have two z/Linux partions running under z/VM. LP1102 LP1202 CEC1 CEC2 Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence

Storage and Page data sets System Memory Page Datasets Spare Page Datasets SYSA 2 GB SYS1.SYSA.PAGE1 SYS1.SYSA.PAGE2 SYS1.SYSA.PAGE3 SYS1.SYSA.PAGEA SYS1.SYSA.PAGEB SYSB SYS1.SYSB.PAGE1 SYS1.SYSB.PAGE2 SYS1.SYSB.PAGE3 SYS1.SYSB.PAGEA SYS1.SYSB.PAGEB SYSD 1 GB SYS1.SYSD.PAGE1 SYS1.SYSD.PAGE2 SYS1.SYSD.PAGE3 SYS1.SYSD.PAGEA SYS1.SYSD.PAGEB SYSS 0.5 GB SYS1.SYSS.PAGE2 SYS1.SYSS.PAGEA SYS1.SYSS.PAGEB Graphics: Update the table with memory and page datasets for your systems. Audio: will need to cover the following: Explain how much memory is defined to each system. Explain how much paging is done by the system. Example: We have 2Gbytes of Memory defined to each production system, and 1GByte to our development system. Our Systems Programmer system only has 500 Mbytes. This is enough for normal processing, so our page datasets are not heavily used. This gives us better performance. Explain page dataset names and packs. Explain spare page datasets that are available. Example: Each production and development system has four page datasets as you can in this screen. We also have an additional two page datasets defined for each system, but not added. In emergencies, we can add these using the z/OS PAGEADD console command. Each page dataset is on its own DASD unit. Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence

System residence volumes What is on them? How they are created and migrated? System Residence Volumes SYSA SYSAR1, SYSAR2 SYSB SYSBR1, SYSBR2 SYSD SYSDR1, SYSDR2 SYSS SYSSR1, SYSSR2 Graphics: Update graphic with the volume serial numbers of your system residence volumes. Audio: will need to cover the following: Include information about your system residence volume setup. Cover: What is on each residence volume If you have shared system residence volumes, or separate. How they are prepared and migrated. Example: We have separate system residence volumes for each system. We keep all IBM product libraries on the residence volumes, as well as any libraries in LPA or linklist. SYSS has two residence volumes: SYSSR1 and SYSSR2. One is the active volume (currently SYSSR1), and the other can be worked on. Changes are migrated like this: Changes are made to the inactive SYSS residence volume. SYSS is IPLed with the new residence volume, and tested. If everything is OK, the SYSS residence volume is copied over the inactive SYSD residence volume (SYSDR1 or SYSDR2). SYSD is then IPLed to use the new residence volume. After three months, the SYSD residence volume is copied over the inactive SYSA and SYSB residence volumes (SYSAR1 and SYSAR2 for SYSA, SYSBR1 and SYSBR2 for SYSB). SYSA and SYSB are IPLed to use the new residence volume. Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence

System library naming conventions System Libraries: SYS1 – IBM z/OS System Libraries (SYS1.LINKLIB, SYS1.IODF00) SYS2 – IBM non-z/OS System Libraries (SYS2.IMS.V700.**) SYS3 – Third Party Libraries (SYS3.SAS.V913.**) SYS4 – Our Own Libraries (SYS4.LINKLIB) Catalogs: CATALOG.MASTER.SYSx – Master Catalogs CATALOG.USER.xxx – User Catalogs CATALOG.VOLCAT.xxx – VOLCAT Catalogs Graphics: Update with dataset naming conventions at your site. Audio: will need to cover the following: Cover any general dataset naming conventions. Example: All IBM z/OS libraries start with SYS1, IBM non-z/OS libraries start with SYS2, and ISV libraries start with SYS3. For SYS2 and SYS3 libraries, the product name follows, and then the release. Catalogs start with the CATALOG high level qualifier, followed by the catalog type (master, user or volcat), and then the name. z/OS product modules are in SYS1.LINKLIB and SYS1.LPALIB. The I/O Definitions file is SYS1.IODF00. All LPA and Linklist libraries are on the system residence libraries. No changes are made to the linklist or LPA list without a full migration of the residence volume. Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence

System library names JES PROCLIB Concatenation: JES Parameters: SYS1.PROCLIB – holds JCL for system started tasks and JES2. SYS1.SYSx.PROCLIB – System specific system procedures SYS2.PROCLIB – JCL for ISV started tasks. SYS4.TSO.PROCLIB – TSO/E logon procedures. SYS4.BATCH.PROCLIB – Systems Programmer JCL for batch (eg. C compiles) PROD.PROCLIB – Production JCL procedures. (other product libraries here) JES Parameters: SYS1.PARMLIB(JESPRM00) Graphics: Update with information about system libraries at your site. Audio: will need to cover the following: Cover: PROCLIBs Example: SYS1.PROCLIB holds the startup JCL for the system started tasks, and JES2 itself. The two production systems have a shared, common SYS1.PROCLIB. Other systems have their own. SYS1.PROCLIB with the system name in between the SYS1 and the PROCLIB holds system-specific JCL – for example SYS1.SYSA.PROCLIB for SYSA. SYS2.PROCLIB holds procedures for ISV products and started tasks. SYS4.TSO.PROCLIB holds the TSO logon procedures, AND SYS4.BATCH.PROCLIB procedures for batch. PROD.PROCLIB holds procedures for production batch, and is managed by the Operations Support group. JES parameters are defined in the JESPRM00 member of SYS1.PARMLIB. The JES procedure concatenation is defined in this parameter library, and not in the JES JCL. Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence

Parameter libraries Load Member: SYS0.IPLPARM(LOAD00) Backout Member: SYS0.IPLPARM(LOAD99) Emergency Member: SYS0.IPLPARM(LOADXX) IEASYS Active Member: SYS1.PARMLIB(IEASYS00) Backout Member: SYS1.PARMLIB(IEASYS99) Emergency Member: SYSS.PARMLIB (IEASYS00) Other PARMLIB members: Active suffix is 00. Backout is XX. Emergency PARMLIB is SYSS.PARMLIB Graphics: Update the graphic with information about the LOAD and PARMLIB members in your site. Audio: will need to cover the following: Cover: What dataset holds the LOADxx member. What suffix is used for LOADxx: for example, is it always 00, or is it a number that increments with any change? What is the backout member? What is the active and backout PARMLIB members? Example: We always use LOAD00 in SYS0.IPLPARM as our load member. If we make a change, we copy LOAD00 to LOAD99, and then change LOAD00. If there is a problem and neither of these work, LOADXX starts a minimal system that lets us logon, and fix any problems. SYS1.PARMLIB is same. All parameters are in SYS1.PARMLIB. The active member ends in 00, the backup member is 99. SYSS.PARMLB holds parameters to start an emergency ‘minimal system.’ Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence

SMP/E environment z/OS SMP/E Environment Global CSI Dataset Name. Target and DLIB Zone names. Location of SMP/E Libraries, and how they relate to residence volumes. Graphics: Update the above graphic to explain your SMP/E environment. Audio: will need to cover the following: Cover: Dataset names of SMP/E Global CSIs. Names of Target and DLIB zones. How they related to the residence volumes. Example: For z/OS, our global CSI dataset name is SYS1.GLOBAL.CSI. This holds the Global CSI, as well as the Target and DLIB CSIs. It is on the residence volume. The Target zone is TGT, DLIB zone is DLIB. All z/OS products are in this SMP/E environment. We have separate SMP/E zones for third party products. Copyright © Interskill Learning Pty Ltd 2011 – Commercial in Confidence

Our IPL schedule How often and when are Productions Systems IPLed? How often and when are Development Systems IPLed? Documentation about IPL parameters. What role do Automated Operations play in IPL? Graphics: Update this screen with information about your IPL schedule. Audio: will need to cover the following: Cover the following: How often systems are IPLed, and at what time. What role Automated Operations plays in IPL. What is started from IEACMDxx / COMMNDxx, and what is started by Automated Operations. Any other IPL procedures or standards. Example: Our production systems are regularly IPLed every three months at 3am Sunday morning. We may IPL them at other times if changes are required. SYSD is regularly IPLed every night at 2am. SYSS is IPLed by the Systems Programmers whenever required. The IPL book in the Computer Room documents the IPL parameters. It also documents changes from the previous IPL document, and how to back changes out. The operators IPL the machine, and then our Automated Operations package, Tivoli Systems Automation, takes over. It starts JES and other subsystems, the networks, and checks everything is up. Alerts are sent if anything does not come up successfully. The JES and the Systems Automation Netview systems are started from the COMMNDxx parmlib member. Our automated operations product, Systems Automation, then starts up all other systems automatically. SLIP traps and MPF settings are also set from COMMNDxx. Other Ideas You could include another slide showing some screen shots or a movie of the z/OS Console during an IPL of one of your systems, with voice over of what is happening. Copyright © Interskill Learning Pty Ltd 2011

Summary Our System Configuration Storage and Page Datasets Introduction to z/OS Systems Programming 55 minutes Virtual Storage & Address Space Concepts Summary 45 minutes Working with System Data Sets Our System Configuration Storage and Page Datasets Systems Residence Volumes System Dataset Naming System and Parameter Libraries SMP/E Environment IPLs At Our Site 45 minutes Working with System Parameter Lists 45 minutes Initializing the z/OS System PowerPoint Our z/OS System Setup 40 minutes Configuring JES2 70 minutes Issuing VTAM and TCP/IP Commands Audio: will need to cover the following: This presentation has introduced our z/OS systems, and how they are configured. We also looked at the z/OS storage and page datasets, system residence volumes, system and parameter libraries, and our SMP/E environment. Finally, we looked at when and how we IPL our system. As you can see by the learning path graphic shown here, your next step in the training focuses on the final two Datatrain modules: Configuring JES2, and Issuing VTAM and TCP/IP Commands. When this has been completed, another internal presentation will cover the JES and network setup on our systems. You will need to complete this before the Webinar “Understanding Systems Programming Procedures and Your Role” wraps up this pathway. Thank you for attending. PowerPoint Our JES and Network Setup Webinar Understanding Systems Programming Procedures and Roles Copyright © Interskill Learning Pty Ltd 2011