Facilitator: Rick Harris and Mike Stout BREAKOUT 9: ANSI/NIRMA Facilitator: Rick Harris and Mike Stout DUKE ENERGY June 11-14, 2006 Richmond, VA
Breakout #9 ANSI/NIRMA Standard Review Clarify definition of Authorization Basis Information (Section 2.3) Changed “consistency” to “conformance” where it refers to CM Equilibrium Model. Delete Configuration Controlled FCI definition, and delete single occurrence from 3.4.4 on page 9. Deleted definition of “Margin” Revised title of Appendix B to “ Examples of CM Performance indicators or health reports.” Move CM Health Report from Appendix B to new section 3.5.5.