1 Overview of Wind and State Policy in Colorado Colorado Wind Forum October 8, 2013.

Slides:



Advertisements
Similar presentations
Planning For The Future Idaho Powers 2006 Integrated Resource Plan.
Advertisements

NET METERING & FEED IN TARIFF REVIEW IURC Technical Conference
Demand Response in Ontario Paul Grod, CEO, Rodan Energy July 11, 2013.
A 2030 framework for climate and energy policies Marten Westrup
New frontiers for alternative energy
A New Model For Solar Manufacturing Roger G. Little Spire Corporation.
Vestas.com WMI Concept at Vestas. 2 | Presentation title, January 21, 2014 Challenges to the project The plan What is the long- and short term objectives.
Xcel: An Update Clean Energy Action January 26, 2012 Leslie Glustrom
Public Policy Drivers and Other Trends in Renewable Energy IPED Managing Your Energy Portfolio in a Greener World Presented by:Mon-Fen Hong La Capra Associates,
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Santa Fe, N.M. July 25,
Energy in the U.S. - Why Wind? Financing Wind Power: The Future of Energy Institute for Professional and Executive Development Scottsdale, Arizona May.
State Policy Initiatives Financing Wind Power: The Future of Energy May 7-9, 2008 Richard Cogen.
Electricity and Natural Gas Supply, Reserves, and Resource Adequacy CMTA Energy Conference Energy: Growing Californias Economy William J. Keese California.
Planning for a Low-Carbon Future at San Diego Gas & Electric Rob Anderson Director of Resource Planning San Diego Gas & Electric Western Resource Planners.
Energy policy and its implementation in Estonia Renewable energy Madis Laaniste, Energy Department.
© 3M All Rights Reserved. Innovations in Permitting and Flexible Air Permitting as Well as Methods to Improve the Permitting Process Mark Manninen,
Region II WIN Feb © 2011 Babcock & Wilcox Nuclear Energy, Inc. All rights reserved. A practical, scalable, modular ALWR.
1 1 Dominion: New Directions in Energy. 2 2 About Dominion: Diverse Generation Mix Dominion Virginia Power.
Credit Insurance: A Business Solution
PLIVA, a Member of the Teva Group Tihomir Oreskovic
Foundations of Chapter M A R K E T I N G Copyright © 2003 by Nelson, a division of Thomson Canada Limited. Supply Chain and Logistics Management 17.
Electric Vehicles Industrial Cluster - NPO IKEM Corp. (Business entity of EVIC) Changing the Government Agenda of EU's poorest countries using the power.
B ONES O F S TEEL 100 YEARS IN BUSINESS +1MILLION TONNES OF STEEL 4 GENERATIONS E ST MW = 650,000 TONNES S TRENGTH & INNOVATION.
RENEWABLE ENERGY 29/03/2012 Green Industries, Department of Trade and Industry.
Page 1 Indonesian-German Renewables Forum PV Hybrid Systems September 2013, Jakarta Ingo Meyer I VP Sales & Marketing b+w Electronics Systems GmbH.
The Global Marketplace
2010 Renewable Energy Vermont Distributed Generation Northeast Conference Wilson Rickerson May 19 th, 2010 The Story of Vermonts Feed-in Tariff – Lessons.
San Diego, CA March 22, 2013 Black River Generation – Retrofit Project Biomass Power Association Annual Conference.
Oceans of opportunity Harnessing Europes largest domestic energy resource European Offshore Wind Conference September 2009 Justin Wilkes Head of.
U.S. Geothermal Power Production and Development Report Dan Jennejohn Research Associate, GEA May, 2011.
Photograph Courtesy of Union of Concerned Scientists Website.
POTOMAC WIND ENERGY Presents: Small Wind Turbines for residential and business use. May 2008.
© 2008 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Better business outcomes equal better.
California Roundup: Summary of DR Activity in California John Goodin Lead, Demand Response 2008 National Town Meeting on Demand Response June 3, 2008.
© Vattenfall AB The Swedish Power Market Presented for Invest in Sweden Agency and Sun Microsystems Stockholm 20 March, 2009 Sandra Grauers Nilsson, Vattenfall.
Update on CAISO / PacifiCorp Energy Imbalance Market Presentation to WECC Market Interface Committee March 25, 2014 Jim Price, Senior Advisor, Market Development.
BC Hydro’s Green Energy Initiatives
The Landscape of Solar Industry in China 1. 2 Landscape of Solar Industry in China  8 IPO’s since 2005,100+ solar fab’s built  In 2009, volume of polysilicon.
Canada and Florida: An Economic Impact Study Presentation to the Metro Orlando Economic Development Commission March 11, 2009.
Supply Chain / Hoko Student will understand the roles supply chains in a business: Define a supply chain Understand the components and the effects of a.
New Jersey Board of Public Utilities (USA) World Forum on Energy Regulation Québec City, Canada May 15, 2012 Jeanne M. Fox, Commissioner.
EDISON INTERNATIONAL® SM Green Technology and Renewable Energy Opportunities 4 th Annual India Trade Conference, June 23, 2011 Cerritos CA Gary Barsley.
RES Americas Kansas Wind and Renewable Energy Conference 2008.
May 2013 SHALE GAS, COMPETITIVENESS, AND NEW U.S. CHEMICAL INVESTMENT: AN ANALYSIS BASED ON ANNOUNCED PROJECTS The full ACC report is available
Cove Point On The One-yard Line WVONGA Fall Meeting September 11, 2013.
Market Data ASHRAE May, Keith Stippich. Global Energy Consumption Global Energy Consumption (+10.9% overall increase)
Wind Manufacturing & Business Development. Kansas National and International Offices West Coast Office — Los Angeles Great Lakes Office — Chicago East.
Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.
Meeting the Wind Power Challenge – Industry Perspective AWEA Transportation Logistics Working Group.
Vestas.com Condition Based Maintenance of Vestas Offshore Turbines European Offshore Wind Conference & Exhibition 2009, Stockholm Jacob Juhl Christensen,
State of the Wind Industry Denise Bode CEO American Wind Energy Association.
Real Implications of Alternative Energy Sources for Communities WCCMA 2008 Summer Conference Roger Garratt Director, Resource Acquisition & Emerging Technologies.
Vestas.com How Can Offshore Wind Contribute To The European Energy Portfolio? Uffe Vinther Schou, Sales Director, Vestas Offshore A/S.
Vestas.com Wind Energy in Poland – Potential, Prospects and Pitfalls A presentation for the joint seminar by demosEuropa and the Danish Embassy in Warsaw.
Alstom Wind Madrid, 20 th May 2010 Félix Urrea, VP Operations EMEA.
VI. KAZENERGY Eurasian Forum Wind energy development in the emerging markets including Kazakhstan Andreas Thomas, Senior Vice President Business Development.
Wind Market Update Susan Williams Sloan American Wind Energy Association Wind Energy Symposium Texas A&M University European Union Center of Excellence.
Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.
A Status Report on Wind Energy Opportunities in Canada Robert Hornung, CanWEA EWEA Conference March 2, Athens.
Title slide/end slide image dimensions: Title slide images must always fit this size: Height: 10.6 cm; Width: 25.4 cm Title slide images must always follow.
1 | Corporate Presentation, October 9, 2015 vestas.com Improvement of loads verification tools.
Political Factors Affecting the Renewables and Energy Efficiency Remarks of Ron Binz, Chairman Colorado Public Utilities Commission October 15, 2010 IPPAI.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
1 | Wind in British Columbia Wind in British Columbia Generate 2010: Getting It Built November 8, 2010 Title slide/end slide image dimensions: Title slide.
JUNTOS CONSTRUIMOS UN PAIS DE CALIDAD HONDURAS RENEWABLE ENERGY 2012.
Feed In Tariffs A Policy for Rapidly Expanding Renewable Energy Deployment.
Vestas.com Wind Power Plant Dynamic Reactive Power “Hybrid” Solutions to meet ERCOT Reactive Power Capability Requirements Presented at ERCOT ROS Meeting,
Vestas.com Texas/European Union Wind Energy Symposium October 2009 Dr. Carsten Hein Westergaard Vestas Technology R&D Americas, Inc.
MULTICLIENT : SUPPLIER OPPORTUNITIES AT EUROPEAN WIND TURBINE PRODUCERS WIND TURBINE SEMICONDUCTOR EMS & CABLE TOWERS CONSTRUCTIONBLADES BEARINGS.
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Presentation transcript:

1 Overview of Wind and State Policy in Colorado Colorado Wind Forum October 8, 2013

Footprint in the U.S. and Canada 2

Made in the USA Blades, towers and nacelles Vestas established four North American manufacturing facilities in Colorado as well as other operations to support the business, including a regional spare parts and tools warehouse in Denver. By building and centrally locating its North American factories, Vestas customers, business partners and suppliers benefit from lower logistical costs, improved response time and customized solutions. Today, over 70% of a Vestas wind turbine is made domestically. In addition the factories have exported components to Mexico, Canada, Brazil and Europe. COLORADO 3

Made in the USA Blade Factory (Windsor) Nacelle Assembly (Brighton) Blade Factory (Brighton) Tower Factory (Pueblo) Vestas Blades America Vestas operates two blade factories in Colorado. In 2008, Vestas opened its first U.S. manufacturing facility in Windsor. Vestas also has a blade factory in Brighton that is adjacent to the nacelle assembly factory. The factories are adjacent to about 6,200 feet of shared railroad tracks and nearby major highways to provide transportation for finished product. The Windsor factory is equipped to make blades for the V100 (49m) and V110 (54m) platforms while the Brighton blade facility produces blades for the V112 (55m) and V117 (57.5m). 4

Made in the USA Blade Factory (Windsor) Nacelle Assembly (Brighton) Blade Factory (Brighton) Tower Factory (Pueblo) Vestas Blades America Vestas Nacelles America Vestas broke ground to construct its nacelle and hub assembly factory in Brighton in March The factory celebrated its grand opening on July 7, The factory is located adjacent to railroad lines and major highways to provide for easy shipment. 5

Made in the USA Blade Factory (Windsor) Nacelle Assembly (Brighton) Blade Factory (Brighton) Tower Factory (Pueblo) Vestas Blades America Vestas Towers America Vestas only tower factory globally is in Pueblo. It opened in 2010 and was designed with the flexibility to make towers for a variety of turbine models. The tower factory has hired more than 200 people in 2013 to meet customer demand and is expected to be at full capacity utilization in he company has Vestas is implementing its plan to create a more flexible and scalable business to adapt the company to the uncertain market situation in the wind industry. Part of this plan is to more effectively use the existing production capacity. This new agreement is a step in securing this. The agreement means Vestas will ramp up at its tower factory in Pueblo, Colorado, USA. Vestas soon will begin manufacturing the first part of the third-party tower supply agreement that could use up to 25 per cent of the production capacity. The agreement will create more than 100 jobs by the end of the first quarter of

Late 1990s RPS legislation 2001 CO PUC Decision on Colorado Green 2004 RPS Ballot Initiative 2010 RPS increased to 30% Wind Energy in Colorado : SB180 (Spradley & Kester) 2003: SB151 (Phillips), HB1295 (Spradley & Kester) 2004: HB1273 (Spradley & Madden, Kester) 2007 RPS increased to 20% 2011 CO PUC approves wind contract to save $100M over 25 yrs 2008 & 2009 Vestas in Windsor & Brighton 61MW 223MW 1,067MW1,299MW ,301MW

DOE Revolution Now The Future Arrives for Four Clean Energy Technologies. September, 2013.

AWEA Market Update: Installed Capacity 60,007 MW The Western 11 states: 18,300 MW of wind 4 of top 10 wind states in U.S.

U.S. Wind Project Map

AWEA Market Update: 2013 RFPs TriState: 100 MW Xcel: 450 MW Platte River: 30 MW Black Hills: 30 MW >600 MW >$1B investment

AWEA Market Update: 2013 PPAs Year to date, we have over 3,600 MW of wind PPAs for new projects and 1,300 MW of utility announcements.

State Wind-Eligible Wind Demand Through 2025 Ohios RPS is expected to drive the most wind installations, followed by Illinois, California, New Jersey, and Colorado. These five states contain 54% of all expected-wind-to-comply RPS demand.

Beyond Renewable Portfolio Standards August 2013 David Hurlbut, Joyce McClaren & Rachel Gelman 8 western RPS states driving most of demand for renewables Result is that renewables close to load (in-state) being tapped first Report examines untapped RE resources in 2025 available for deployment Renewables -- without tax incentives – competitive with natural gas by 2025 Net short of 49 terra-watt hours of new RE needed by 2025 needed to meet RPS demand Assuming 30% capacity factor = 19,000 new MW of RE by 2025 for RPS

Susan Innis Senior Manager, Public Affairs (303) Copyright Notice The documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied in any form or by any means - such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems A/S. The use of these documents by you, or anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided as is and Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you. 16