of Key Characteristics

Slides:



Advertisements
Similar presentations
Configuration Management
Advertisements

PPAP Requirements Training
Variation Management of Key Characteristics
How to Document A Business Management System
Page 1 National Defense Industrial Association (NDIA) Program Management Systems Committee (PMSC). NDIA Earned Value Management Systems Intent Guide Overview.
0-1 Team # Status Report (1 of 4) Client Contact –Point 1 –Point 2 Team Meetings –Point 1 –Point 2 Team Organization –Point 1 –Point 2 Team #: Team Name.
0-1 Team # Status Report (1 of 4) Client Contact –Status Point 1 –Status Point 2 Team Meetings –Status Point 1 –Status Point 2 Team Organization –Description.
1 Requirements Analysis and Specification Requirements analysis.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Huzairy Hassan School of Bioprocess Engineering UniMAP.
Guidelines for Carbon Fiber Tape Prepreg Specifictions W.T.McCarvill S.Ward August 6, 2002.
Introduction to Software Quality Assurance (SQA)
Supplier Overview of Johnson & Johnson MD&D Supplier Quality Standard Operating Procedures (SOPs) Supplier Process Control.
NIST Special Publication Revision 1
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
IS Analysis and Design. SDLC Systems Development Life Cycle Break problems into management review stages Control cost and time Works best with well understood.
Process System Capability An introduction to 9103 ‘VARIATION MANAGEMENT OF KEY CHARACTERISTICS’ Bernard LAURAS AIRBUS.
Variation Management of Key Characteristics Contents Key Characteristics definition Purpose Method for accomplishment Process Control Document form Structure.
International Aerospace Quality Group The Initiatives of the International Aerospace Quality Group (IAQG) Steve Shepherd ~ European Sector Leader.
Design Report – Fall Semester. Title Page List name of project and team number List date List team members, advisor, sponsor Team logos.
EO Dataset Preservation Workflow Data Stewardship Interest Group WGISS-37 Meeting Cocoa Beach (Florida-US) - April 14-18, 2014.
25 September 2002 AS 9103 Variation Management of Key Characteristics Lee Tait Director, Quality Assurance Lockheed Martin Aeronautics.
Kypros-net Website : Greek Tutorial Program SI 622 Evaluation of Systems and Services M. Elledge P. Zaphiris.
Supplier Performance Development Process
Measure Phase Wrap Up and Action Items. Measure Phase Overview - The Goal The goal of the Measure Phase is to: Define, explore and classify “X” variables.
External Provider Control
Portfolio Analyzer Extender v. 1240
Production Part Approval Process
Six Sigma Greenbelt Training
Iterative Risk Management Workflow Tool
Radiopharmaceutical Production
Project Quality Management
Project quality.
Prepared by Rand E Winters, Jr. ASR Senior Auditor October 2014
Black Belt Project Storyboard Template Can be used in combination with Black Belt Storyboard Submission Guide Visit GoLeanSixSigma.com for more Lean Six.
State of Palestine Generic Statistical Business Process Model )GSBPM) - Palestine Case August 2017.
Flooding Walkdown Guidance
Calculating MMC Cpk When there is a Maximum Material Condition or Least Material Condition True Position Specification Revision 2 2/11/99 Marty Ambrose.
DSQR Training Control Plans
UNIT-6 SOFTWARE QUALITY ASSURANCE
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Business Plan Template
Project Name Steering Committee Meeting Project Manager: Project Manager Name Program Manager: Program Manager Name Project Sponsor: Project Sponsor Name.
Supplier Performance Development Process
Higher National Certificate in Engineering
Review.
EEE 299 & EEE 399 Internship Presentation
This PPAP File Is Under Construction
Topic Principles and Theories in Curriculum Development
Project Champion: Process Owner: Organization: Project Location:
EPAN - eGovernment EPAN Administrative Framework
RISK REDUCTION PROCESS
First Article Inspection
Critical Infrastructure Protection Committee
Production Part Approval Process
Product and Process Validation JAN ROOVERS ASSOCIATES, INC.
Advanced Product Quality Planning 2nd Edition
DMAIC STANDARD WORK TEMPLATE
International Aerospace Quality Group European Sector Leader
TRTR Briefing September 2013
Supplier Performance Development Process
North Carolina Council on Developmental Disabilities
DMAIC STANDARD WORK TEMPLATE
Measure Phase Wrap Up and Action Items
Calculating MMC Cpk When there is a Maximum Material Condition or Least Material Condition True Position Specification Revision 2 2/11/99 Marty Ambrose.
PSS verification and validation
Advanced Product Quality Planning 2nd Edition
Research Proposal and Report
Analytical Paper 9 June 2015.
Radiopharmaceutical Production
Presentation transcript:

of Key Characteristics Variation Management of Key Characteristics Contents Key Characteristics definition Purpose Method for accomplishment Process Control Document form Structure of the standard Status and timeframe objective.

Control of variation is necessary Variation Management of Key Characteristics Definition of Key Characteristics Significant influence :  Product fit  Performance  Service life  Manufacturability Measurable features. Control of variation is necessary for meeting Customers' requirement/satisfaction.

Variation Management of Key Characteristics Purpose Intent to drive the improvement of the manufacturing processes through adequate planning and effective management of Key Characteristic variation. Methodology for component/process proving focused on Key Characteristics.  Understanding processes  Using appropriate tools  Demonstrating acceptable process capabilities  Guidelines for reporting process capability data to primes.

Variation Management of Key Characteristics Method of accomplishment Continue to monitor performances No Understand Key Characteristics Plan a manufacturing process Is a process change required ? Yes Operate the process Analyze data Take action from study  Output for each stage.  Report to a common form.

PCD is the preferred method of fulfilling Variation Management of Key characteristics Process Control Document (PCD) form Written description of manufacturing plan Living document Performance results History of changes. PCD is the preferred method of fulfilling the documentation requirements

STAGE 1 STAGE 2 AS9103 PROCESS CONTROL DOCUMENT Page 1 of 2 Process Control Document Number Process Owner Date (Original) Date (Rev) Flowchart Created? Yes/No Part Number / Part Family / Latest Change Level Producer Approvals and Date Customer Approvals and Date Part Name / Description Name: Producer / Plant Manufacturer Code STAGE 1 STAGE 2 KC No KEY CHARACTERISTIC(S) Minimum Requirement Origin of KC Are Sources of Variation Identified? Is Risks Mitigation Specified? KC Name Process ID Operation Number Work Instruction No. /Change Level Cp Cpk

STAGE 3 STAGE 4 AS9103 PROCESS CONTROL DOCUMENT Page 2 of 2 Process Control Document Number Part Number / Latest Change Level Date (Original) Date (Rev) STAGE 3 STAGE 4 STAGE 5 STAGE 6 KC No. Preliminary Process Capability Study - Type of Control Chart Results of Study Action from Study, Y/N Ongoing Monitoring Methods Stable Y / N Calculations Control Chart/Other Capability Review Freq. Hist / New Date Gage Gage # M.S.A. % n Freq. Mean Std. Dev. Cp Cpk Type Frequency

General requirements (process capability, Variation Management of Key Characteristics Structure of the standard  Consist of 2 sections : Minimum requirements General requirements (process capability, variation management, substitute KCs, flow-down to sub-tiers……) Process model (Flowchart with 7 stages) Best practices / guidelines/ form in appendix format. Process Control Document (PCD) Model for flowchart activities

This standard has been translated in japanese and should be published Variation Management of Key Characteristics Status and timeframe objective Standard balloted and consensus reached  PCD form available on document.  Recommended tools / forms may be incorporated in the IAQG web-site This standard has been translated in japanese and should be published by April 2002

Merci pour votre attention Variation Management of Key Characteristics Merci pour votre attention Questions ?